Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 102 ]
�
� |
Proposal to open a dialog regard the HomeGrid Forum C&I Programme and testing against ITU-T Recommendations G.hn series
�
� |
Marvell Semiconductor Inc.
� |
Q11/11
� |
2013-11-01 |
|
[ 101 ]
�
� |
ETSI approach of IMS NNI Testing
ETSI TS 186 011-2
IMS NNI Interoperability Test Specifications;
Part 2: Test description for IMS NNI Interoperability
�
� |
A1 Telekom Austria AG
� |
Q11/11
� |
2013-10-30 |
|
[ 100 ]
�
� |
ETSI approach of IMS NNI Testing
ETSI TS 186 011-1
IMS NNI Interoperability Test Specifications;
Part 1: Test purposes for IMS NNI Interoperability
�
� |
A1 Telekom Austria AG
� |
Q11/11
� |
2013-10-30 |
|
[ 99 ]
�
� |
Proposals to advance in "Q.QMS" work item
�
� |
Universidad Del Pa�s Vasco
� |
Q11/11, Q10/11
� |
2013-10-30 |
|
[ 98 ]
�
� |
Proposal to establish a new work item Q.test_app "ITU-T's general approaches of testing of ICT products"
�
� |
Administration of Russia
� |
Q11/11
� |
2013-10-29 |
|
[ 97 ]
�
� |
Proposal to establish an ITU recognition procedure of testing laboratories with competence in ITU-T Recommendations
�
� |
Administration of Russia
� |
Q11/11
� |
2013-10-29 |
|
[ 96 ]
�
� |
Draft recommendation Q.Int_speed_test "Unified methodology of Internet speed quality measurement usable by end-users on the fixed and mobile networks "
�
� |
Administration of Russia
� |
Q15/11
� |
2013-10-29 |
|
[ 95 ]
�
� |
IMEI numbers and Counterfeit Mobile Devices
�
� |
United Kingdom
� |
Q8/11
� |
2013-10-28 |
|
[ 94 ]
�
� |
Role and Scope of the GSMA IMEI Allocation System
�
� |
GSM Association
� |
Q8/11
� |
2013-10-25 |
|
[ 93 ]
�
(Rev.1)� |
Proposed text about Section 8 Use of the Diameter base protocol on Q.nacp.Nc
�
� |
Korea (Rep. of)
� |
Q7/11
� |
2013-10-25 |
|
[ 92 ]
�
(Rev.1)� |
X.mp2p-arch: Proposed of Information flow for content distribution control
�
� |
Korea (Rep. of)
� |
Q9/11
� |
2013-10-25 |
|
[ 91 ]
�
(Rev.1)� |
Addition to the Draft Handbook on Counterfeit Equipment
�
� |
Ukraine
� |
Q8/11
� |
2013-10-25 |
|
[ 90 ]
�
� |
Proposal to update draft Q.IPFAX-testing
�
� |
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q10/11
� |
2013-10-25 |
|
[ 89 ]
�
� |
Proposal to update draft Q.OIP/OIR
�
� |
NEC Corporation
� |
Q2/11
� |
2013-10-25 |
|
[ 88 ]
�
� |
Proposal to update Q.TR-CCI
�
� |
NEC Corporation
� |
Q14/11
� |
2013-10-25 |
|
[ 87 ]
�
(Rev.1)� |
Report of the NGN testing and showcasing during APT/ITU Conformance and Interoperability event and proposal
�
� |
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q8/11, Q15/11, Q14/11, Q13/11, Q12/11, Q11/11, Q10/11
� |
2013-10-25 |
|
[ 86 ]
�
(Rev.1)� |
Recovery procedure proposal in Q.CSO
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/11
� |
2013-10-25 |
|
[ 85 ]
�
(Rev.1)� |
Editorial proposal for Q.CSO
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/11
� |
2013-10-25 |
|
[ 84 ]
�
+Add.1� |
Proposal to start a new work item on ITU-T M.3170 series of Recommendations conformance testing pilot project
�
� |
Beijing University of Posts and Telecommunications
� |
Q11/11
� |
2013-10-25 |
|
[ 83 ]
�
(Rev.1)� |
Proposed Text for New Work Item "MP2P protocols: Peer Activity Management Protocol (PAMP)" for Nov. 2013 meeting
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2013-10-23 |
|
[ 82 ]
�
(Rev.1)� |
"Reference load profiles and background traffic load" (Q.39zz-1)
Output draft from STQ#44; TS 103 222 V 0.0.5 "Reference benchmarking and background traffic profiles"
�
� |
A1 Telekom Austria AG
� |
Q10/11
� |
2013-10-23 |
|
[ 81 ]
�
� |
Proposed Requirements and Capabilities of Q.rrp "Request routing protocol for content delivery"
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2013-10-23 |
|
[ 80 ]
�
� |
Proposed Update of Q.rrp "Request routing protocol for content delivery"
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2013-10-23 |
|
[ 79 ]
�
(Rev.1)� |
Proposal of initiating a new Recommendation on Signalling Architecture and requirement for IP based Short Message Service
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q2/11, Q1/11
� |
2013-10-23 |
|
[ 78 ]
�
� |
Unassigned
�
This Contribution was withdrawn because it was registered twice by mistake.
� |
N/A
� |
N/A
� |
2013-10-23 |
|
[ 77 ]
�
(Rev.1)� |
Propose to add the scenarios for BNG's event and status notification to the service platform
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q5/11
� |
2013-10-23 |
|
[ 76 ]
�
(Rev.1)� |
Proposed text about message specification on Q.nacp.Nc
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q7/11
� |
2013-10-23 |
|
[ 75 ]
�
� |
Proposal to update draft Q.monitor_d section 6.4 in relation to " Battery parameters"
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2013-10-22 |
|
[ 74 ]
�
� |
Proposal to update draft Q.monitor_d section 6.1 in relation to "Anomalies behaviour and event paramters" of device monitoring
�
� |
China Telecommunications Corporation
� |
Q13/11
� |
2013-10-22 |
|
[ 73 ]
�
� |
Proposal to update draft Q.FW-Cloud-iop including "Cloud service measurement index"
�
� |
China Telecommunications Corporation
,
Ministry of Public Infrastructure, Industries & Commerce
� |
Q14/11
� |
2013-10-22 |
|
[ 72 ]
�
� |
Proposal to update draft Q.TR-CCI by adding SPEC and VMware as testing activities
�
� |
China Telecommunications Corporation
� |
Q14/11
� |
2013-10-22 |
|
[ 71 ]
�
(Rev.1)� |
Consideration of Managed & Distributed Server based A/V Conf. Service
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/11
� |
2013-10-22 |
|
[ 70 ]
�
(Rev.1)� |
Proposal for scenario and requirements on the orchestration function based on the cloud services
�
� |
Beijing University of Posts and Telecommunications
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q4/11
� |
2013-10-21 |
|
[ 69 ]
�
(Rev.1)� |
Proposal for modification and comments of sub-clause 9.3 of Q.Supplement-SDN
�
� |
Beijing University of Posts and Telecommunications
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q4/11
� |
2013-10-21 |
|
[ 68 ]
�
(Rev.1)� |
Proposal for scenario and requirements on East-West interface
�
� |
Beijing University of Posts and Telecommunications
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q4/11
� |
2013-10-21 |
|
[ 67 ]
�
� |
Consideration on signalling requirements of control policy distribution related to service/user awareness and control in Q.SBNG
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 66 ]
�
� |
Consideration on signalling requirements of user information report related to service/user awareness and control in Q.SBNG
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 65 ]
�
� |
Consideration on signalling requirements of service/user awareness and control in Q.SBNG
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 64 ]
�
� |
Propose to add an Annex B to cover the scenarios and requirements of network services' configuration to the BNG to Q.SBNG
�
� |
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 63 ]
�
� |
Propose to add Annex C to cover the scenarios and requirements of BNG's event and status notification to the service platform
�
� |
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 62 ]
�
� |
Propose to add the scenarios and requirements for Services' configuration on BNG
�
� |
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 61 ]
�
� |
Propose to add the scenarios for Service route path, service combination for the Q.SBNG
�
� |
China
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q5/11
� |
2013-10-21 |
|
[ 60 ]
�
(Rev.1)� |
Proposed signalling scenarios in Q.IPv6UIP
�
The original file [C-60] was removed as it was wrongly posted. [C-60 Rev.1] provides the correct submitted contribution.
� |
Huawei Technologies Co. Ltd.
� |
Q6/11
� |
2013-10-21 |
|
[ 59 ]
�
� |
Proposed signalling requirements in Q.IPv6UIP
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/11
� |
2013-10-21 |
|
[ 58 ]
�
� |
Propose to add the scenarios of PTN in Q.SBAN
�
� |
China Mobile
,
Huawei
� |
Q4/11
� |
2013-10-15 |
|
[ 57 ]
�
(Rev.1)� |
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 3: User side; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.3 ' in the work programme it is wrongly identified as Q.3942.4]
�
� |
A1 Telekom Austria AG
,
Deutsche Telekom AG
� |
Q11/11
� |
2013-10-12 |
|
[ 56 ]
�
(Rev.1)� |
Conformance test specification for the terminating identification restriction using IP multimedia core network subsystem - Part 2: Network side ; Test Suite Structure and Test Purposes (TSS&TP) [candidate Q.3942.2]
�
� |
A1 Telekom Austria AG
,
Deutsche Telekom AG
� |
Q11/11
� |
2013-10-12 |
|
[ 55 ]
�
(Rev.1)� |
"Reference load profiles and background traffic load" (Q.39zz)
�
� |
A1 Telekom Austria AG
� |
Q10/11
� |
2013-10-10 |
|
[ 54 ]
�
(Rev.1)� |
Draft technical report on counterfeiting
�
� |
Ukrainian National Information Systems
� |
Q8/11
� |
2013-10-07 |
|
[ 53 ]
�
(Rev.1)� |
Proposal for an IMEI Global System for combating the trade in counterfeit mobile devices
�
� |
Ukrainian National Information Systems
� |
Q8/11
� |
2013-10-04 |
Results:52 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):