Contributions
�[�Source:�Huawei Technologies Co., Ltd.�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 834 ]
�
(Rev.1)� |
Proposal L.test suites stationary
�
� |
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
� |
Q13/5
� |
2016-09-27 |
|
[ 833 ]
�
� |
Proposal L.test suites portable
�
� |
Huawei Technologies Co., Ltd.
,
Telecom Italia S.p.A.
� |
Q13/5
� |
2016-09-27 |
|
[ 828 ]
�
� |
The second draft of L.mmNFV measurement method for energy efficiency of Network Function Virtualization
�
� |
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT
,
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-09-27 |
|
[ 810 ]
�
(Rev.1)� |
Proposal for the draft Recommendation L.t&t
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-09-27 |
|
[ 809 ]
�
(Rev.1)� |
Proposal on Future Energy efficiency metrics/KPI
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-09-27 |
|
[ 804 ]
�
(Rev.1-2)� |
Proposal for the draft Recommendation L.t&t
�
� |
Cisco Systems, Inc.
,
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-09-26 |
|
[ 782 ]
�
� |
The 2nd draft of Recommendation ITU-T K.idc "Dangerous effects and protective measures against electromagnetic disturbances when internet data centre is co-sited with high-voltage substation"
�
� |
Huawei Technologies Co., Ltd.
� |
Q3/5
� |
2016-09-24 |
|
[ 781 ]
�
(Rev.1)� |
Proposal of a new recommendation on "Circuit architectures inside multiple AC or up to 400 VDC input ICT equipment"
�
� |
Huawei Technologies Co., Ltd.
� |
Q19/5
� |
2016-09-24 |
|
[ 780 ]
�
� |
The Appendix I of K.lem"Lightning Protection and Earthing of Miniature Wireless Base Station"
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5
� |
2016-09-24 |
|
[ 779 ]
�
(Rev.1)� |
Draft new Recommendation ITU-T K.wire-line_emc - work frame
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/5
� |
2016-09-24 |
|
[ 741 ]
�
� |
Proposal for first draft of L.mmNFV
�
� |
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-04-07 |
|
[ 735 ]
�
� |
The 2nd draft of Recommendation ITU-T K.lem "Lightning Protection and Earthing of Miniature Wireless Base Station"
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5
� |
2016-04-07 |
|
[ 734 ]
�
� |
The 1st draft of Recommendation ITU-T K.idc "Dangerous effects and protective measures against electromagnetic disturbances when IDC is co-sited with high-voltage substation"
�
� |
Huawei Technologies Co., Ltd.
� |
Q3/5
� |
2016-04-07 |
|
[ 721 ]
�
� |
Study and proposal for the drafting of a new recommendation K.XXX -Requirements and measurement methods of electromagnetic compatibility for Information Perception Equipments
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
� |
Q9/5
� |
2016-04-07 |
|
[ 703 ]
�
(Rev.1)� |
Update draft of Supplement on Circular economy (Circular Economy in Information and Communication Technology; Definition of approaches, concepts and metrics)
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/5
� |
2016-04-06 |
|
[ 700 ]
�
(Rev.1)� |
Proposal to L.architecture
�
� |
Huawei Technologies Co., Ltd.
� |
Q19/5
� |
2016-04-06 |
|
[ 699 ]
�
� |
Proposal of new recommendations on radio site energy parameter measurement methodology and radio site best Practices
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-04-06 |
|
[ 698 ]
�
� |
Proposal revision of the draft recommendation L.RBS
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2016-04-06 |
|
[ 697 ]
�
(Rev.1)� |
Proposal on Key performance indicators for smart sustainable cities Recommendations
�
� |
Huawei Technologies Co., Ltd.
� |
Q18/5
� |
2016-04-06 |
|
[ 694 ]
�
(Rev.1)� |
Contribution for a new Appendix IV in ID149 (ITU-T L.Eco-Rating) about related issues
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q16/5
� |
2016-04-06 |
|
[ 693 ]
�
(Rev.1)� |
Proposal for new clauses 7.5 and 7.6 in ID149 (ITU-T L.Eco-Rating)
�
� |
Huawei Technologies Co., Ltd.
,
Orange
� |
Q16/5
� |
2016-04-06 |
|
[ 615 ]
�
� |
The draft of Recommendation ITU-T K.tot
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5
� |
2015-09-29 |
|
[ 601 ]
�
� |
Proposal on ITU-T L.RBS_assesment
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2015-09-28 |
|
[ 600 ]
�
(Rev.1)� |
Third draft Recommendation of k-BTS-EMC Recommendation
�
� |
Huawei Technologies Co., Ltd.
� |
Q9/5
� |
2015-09-28 |
|
[ 599 ]
�
� |
Proposal modification to L.1002
�
� |
Huawei Technologies Co., Ltd.
� |
Q13/5
� |
2015-09-28 |
|
[ 598 ]
�
� |
First draft revision of K.59
�
� |
Huawei Technologies Co., Ltd.
� |
Q6/5
� |
2015-09-28 |
|
[ 597 ]
�
� |
The third draft Recommendation ITU-T L.RBS_assesment
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2015-09-28 |
|
[ 596 ]
�
� |
Proposal of a new work item on "Danger effects and protective measurement against electromagnetic disturbances when internet data centre being co-sited with high-voltage substation"
�
� |
Huawei Technologies Co., Ltd.
� |
Q5/5, Q3/5
� |
2015-09-28 |
|
[ 595 ]
�
� |
The draft of Recommendation ITU-T K.appl2
�
� |
Huawei Technologies Co., Ltd.
� |
Q2/5
� |
2015-09-28 |
|
[ 594 ]
�
� |
The second draft Recommendation ITU-T L.NET_Infra_assessment
�
� |
Huawei Technologies Co., Ltd.
� |
Q17/5
� |
2015-09-28 |
|
[ 572 ]
�
� |
Declaration of no consent to Q16 Recommendation (ID140 Version 19) on Eco-Rating due to several issues remaining
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-28 |
|
[ 534 ]
�
� |
Input for CONNECT2020 - Framework for estimating the global electricity usage and GHG emissions of ICT towards 2020
�
� |
Huawei Technologies Co., Ltd.
� |
Q18/5
� |
2015-09-07 |
|
[ 532 ]
�
� |
Standardization to harmonize Eco-rating of mobile phones
- the way to sustainability measures for individual products
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 531 ]
�
� |
Huawei on details for functionality moderator in Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 530 ]
�
� |
Questions to be discussed on scope and list of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 529 ]
�
(Rev.1)� |
Do existing eco-rating schemes in reality penalize smartphone functionality?
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 528 ]
�
(Rev.1)� |
List of missing criteria in Version 19 (ID140) of Draft Recommendation ITU-T L.Eco-Rating
�
� |
Huawei Technologies Co., Ltd.
� |
Q16/5
� |
2015-09-03 |
|
[ 524 ]
�
� |
Proposed text of new Q20/5 and Q15/5
�
� |
Huawei Technologies Co., Ltd.
� |
Q20/5, Q15/5
� |
2015-08-11 |
Results:38 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):