International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : WP 1/5 & 2/5�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� TD-GEN�(2014-07-23)�

ITU-T�SG 5

Environment and climate change

Study Period 2013

Meeting� from 2014-07-23 to 2014-07-29

held in Switzerland [Geneva]

Other Meetings : 2017-11-202017-05-152016-10-102016-04-202015-10-122014-12-08� [ 2014-07-23 ]� 2014-05-192013-12-022013-01-29

Results:52 total items.
Result page:� 1 - 2 �-�Next Next
Temporary Documents �(GEN) �[�Source:�Rapporteur�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 694-GEN ]
Amendment 1 to Recommendation ITU-T K.83 � Rapporteur Q7/5 Q7/5 2014-07-31
[ 693-GEN ]
Amendement 1 to Recommendation ITU-T K.84 � Rapporteur Q10/5 Q10/5 2014-07-31
[ 692-GEN ]
Draft revised Recommendation ITU-T K.84 - Test methods and guide against information leaks through unintentional electromagnetic emissions � Rapporteur Q10/5 Q10/5 2014-07-31
[ 691-GEN ]
Draft revised Recommendation ITU-T K.52 - Guidance on complying with limits for human exposure to electromagnetic fields � Rapporteur Q7/5 Q7/5 2014-07-30
[ 690-GEN ]
LS on standardizing the test methods for radiation immunity for the use of wireless devices in the vicinity of telecommunication equipment [to CISPR/I] � Rapporteur Q9/5 Q9/5 2014-07-29
[ 689-GEN ]
Draft revised Recommendation ITU-T K.81 - High-power electromagnetic immunity guide for telecommunication systems � Rapporteur Q10/5 Q10/5 2014-07-29
[ 687-GEN ]
Base text for Recommendation ITU-T K.96 Appendix II on IEC 61000-4-5 Ed.3 � Rapporteur Q2/5 Q2/5 2014-07-29
[ 685-GEN ]
(Rev.1)
Report of Question 11/5 (Geneva, 23-29 July 2014) � Associate Rapporteur Q11/5 Q11/5 2014-07-29
[ 684-GEN ]
(Rev.1-2)
Report of Question 4/5 (Geneva, 23-29 July 2014) � Rapporteur Q4/5 Q4/5 2014-07-29
[ 683-GEN ]
Report of Question 2/5 (Geneva, 23-29 July 2014) � Rapporteur Question 2/5 Q2/5 2014-07-29
[ 682-GEN ]
(Rev.1)
LS/o on Information about work that is being carried out within Work under study in ITU-T Q7/5 [ to ITU-R WP1C and ITU-D SG2 Q7/2] � Rapporteur Q7/5 Q7/5 2014-07-29
[ 681-GEN ]
A new work item K.lsr "Lightning Protection of Solar Power Supply System Feeding Radio Base Station" � Rapporteur Q5/5 Q5/5 2014-07-29
[ 680-GEN ]
(Rev.1)
Report of Question 5/5 (Geneva, 23-29 July 2014) � Rapporteur Q5/5 Q5/5 2014-07-29
[ 679-GEN ]
Report of Question 3/5 (Geneva, 23-29 July 2014) � Rapporteur Q3/5 Q3/5 2014-07-29
[ 678-GEN ]
(Rev.1)
Report of Question 7/5 (Geneva, 23-29 July 2014) � Rapporteur Q7/5 Q7/5 2014-07-29
[ 675-GEN ]
(Rev.1)
Recommendation on Overvoltage Protection Guide for telecommunications equipment installed in a customer premises � Rapporteur Q4/5 Q4/5 2014-07-28
[ 673-GEN ]
(Rev.1)
Draft new Recommendation ITU-T K.79 (K.emc) - Electromagnetic (EM) characterization of the radiated environment in the 2.4 GHz ISM band � Associate Rapporteur Q11/5 Q11/5 2014-07-28
[ 672-GEN ]
(Rev.1)
Draft new Recommendation K.term_emc - EMC requirement and test method of telecommunication terminal equipment � Associate Rapporteur Q11/5 Q11/5 2014-07-28
[ 671-GEN ]
(Rev.1)
Rapporteur's presentation on Question 8/5 � Rapporteur Q8/5 Q8/5 2014-07-28
[ 670-GEN ]
(Rev.1)
Report of Question 8/5 (Geneva, 23-29 July 2014) � Rapporteur Q8/5 Q8/5 2014-07-28
[ 669-GEN ]
Proposal for adding new work of revising Recommendation ITU-T K.93 � Rapporteur Q8/5 Q8/5 2014-07-28
[ 668-GEN ]
(Rev.1)
LS/o on Current status on draft K.mhn and issues related to coexistence of wired telecommunications and radio communication systems (Outgoing Liaison statement to SG9 and ITU-R) � Rapporteur Q8/5 Q8/5 2014-07-28
[ 667-GEN ]
(Rev.1)
LS/o/r on Revision on Recommendation ITU-T K.93 (Outgoing Liaison statement to ITU-R) � Rapporteur Q8/5 Q8/5 2014-07-28
[ 666-GEN ]
Presentation on Recommendation ITU-T K.maps � Rapporteur Q7/5 Q7/5 2014-07-28
[ 664-GEN ]
Proposed revision of Recommendation ITU-T K.52 � Rapporteur Q7/5 Q7/5 2014-07-28
[ 663-GEN ]
Report of Question 6/5 (Geneva, 23-29 July 2014) � Rapporteur Q6/5 Q6/5 2014-07-28
[ 659-GEN ]
Comments on COM 313R2: Ethernet Test Conditions in ATIS STEP NEP document � Rapporteur Q2/5 Q4/5, Q2/5 2014-07-28
[ 658-GEN ]
(Rev.1)
Draft of Recommendation ITU-T K.thy: Parameters of fixed-voltage thyristor overvoltage protector components for the protection of telecommunications installations � Rapporteur Q2/5 Q2/5 2014-07-25
[ 657-GEN ]
Agenda of Question 6/5 � Rapporteur Q6/5 Q6/5 2014-07-25
[ 656-GEN ]
(Rev.1)
Proposal new Work Item for recommendation on EMC requirements for electrical equipment in the telecommunication facilities � Acting Rapporteur Q9/5 Q9/5 2014-07-25
[ 655-GEN ]
(Rev.1)
Fully edited version of Recommendation ITU-T K.appl1: Surge Protective Component Application Guide - Gas Discharge Tubes � Rapporteur Q2/5 Q2/5 2014-07-24
[ 653-GEN ]
Agenda of Question 9/5 � Acting Rapporteur Q9/5 Q9/5 2014-07-24
[ 652-GEN ]
(Rev.1)
5th revision of draft new Recommendation ITU-T K.mhn � Rapporteur Q8/5 Q8/5 2014-07-24
[ 651-GEN ]
(Rev.1)
Second draft revision of Recommendation ITU-T K.74 � Rapporteur Q8/5 Q8/5 2014-07-24
[ 649-GEN ]
Discussions on COM 321 (New waveshape definitions for 1.2/50-8/20 and 10/700) � Rapporteur Q2/5 Q2/5 2014-07-24
[ 647-GEN ]
(Rev.1)
Agenda and status report of Question 3/5 � Rapporteur Q3/5 Q3/5 2014-07-23
[ 643-GEN ]
(Rev.1-3)
Draft LS/o/r on EMC standards for telecommunication network equipment (reply to ETSI TC ERM - ERMEMC(14)041008 ) [to ETSI ERM-EMC WG] � Rapporteur Q9/5 Q9/5 2014-07-22
[ 642-GEN ]
Draft Agenda of Question 8/5 � Rapporteur Q8/5 Q8/5 2014-07-22
[ 640-GEN ]
Report on ACEC meeting on 20-21 May 2014 � Liaison Rapporteur ACEC Q9/5, Q8/5, Q7/5, Q6/5, Q11/5, Q10/5 2014-07-22
[ 638-GEN ]
(Rev.1-5)
Supplement 1 to Recommendation ITU-T K.91 - Guide on Electromagnetic Fields and Health � Associate Rapporteur Q7/5 Q7/5 2014-07-22
[ 637-GEN ]
Draft Agenda of Question 11/5 � Associate Rapporteur Q11/5 Q11/5 2014-07-22
[ 636-GEN ]
Draft Agenda of Question 10/5 � Rapporteur Q10/5 Q10/5 2014-07-22
[ 624-GEN ]
(Rev.1-3)
The combined proposals of the revision of Recommendation ITU-T K.83 � Rapporteur Q7/5 Q7/5 2014-07-21
[ 622-GEN ]
(Rev.1)
Proposal for the revision of Recommendation ITU-T K.84 � Rapporteur Q10/5 Q10/5 2014-07-21
[ 621-GEN ]
(Rev.1)
Proposal for the revision of Recommendation ITU-T K.81 � Rapporteur Q10/5 Q10/5 2014-07-21
[ 620-GEN ]
(Rev.1-3)
Draft agenda and status report of Question 7/5 � Rapporteur Q7/5 Q7/5 2014-07-21
[ 619-GEN ]
Draft agenda and status report of Question 2/5 � Rapporteur Q2/5 Q2/5 2014-07-21
[ 617-GEN ]
Draft agenda and status report of Question 5/5 � Rapporteur Q5/5 Q5/5 2014-07-16
[ 609-GEN ]
The second draft of Recommendation ITU-T K.tot � Rapporteur Q5/5 Q5/5 2014-07-10
[ 608-GEN ]
The new draft of Recommendation ITU-T K.27 � Rapporteur Q5/5 Q5/5 2014-07-10
Results:52 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-27