International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : WP 1/5 & 2/5�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�(2014-07-23)�

ITU-T�SG 5

Environment and climate change

Study Period 2013

Meeting� from 2014-07-23 to 2014-07-29

held in Switzerland [Geneva]

Other Meetings : 2017-11-202017-05-152016-10-102016-04-202015-10-122014-12-082014-05-192013-12-022013-01-29

Results:51 total items.
Result page:� 1 - 2 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 356 ]
Q7/5 - EMF Guide - � Ghana Q7/5 2014-07-10
[ 355 ]
Contribution to DRAFT Recommendation K.OVP: Overvoltage Protection Guide for telecommunications equipment installed in a customer premise � Orange Q4/5 2014-07-10
[ 354 ]

Withdrawn
N/A � 2014-07-10
[ 353 ]
(Rev.1-2)
Q7/5 -EMF Guide - Additional Contribution on SAR � Microsoft Corporation Q7/5 2014-07-10
[ 352 ]
(Rev.1-2)
Comments on the EMF guide draft � Microsoft Corporation Q7/5 2014-07-10
[ 351 ]
Draft new Recommendation ITU-T K.Maps � Argentina , Brazil , Colombia , Ecuador , El Salvador , Uruguay Q7/5 2014-07-10
[ 350 ]
Base text for K.spd: Basic requirements for Surge Protective Devices � Bourns Limited Q4/5, Q2/5 2014-07-10
[ 349 ]
(Rev.1-2)
EMF - Guide - Proposed corrections and extensions � India , Ministry of Communications and Information Technology, Law and J Q7/5 2014-07-10
[ 348 ]
(Rev.1-5)
Minor addition to K.83 - Monitoring of electromagnetic field levels � Microsoft Corporation , Telefon AB - LM Ericsson Q7/5 2014-07-10
[ 347 ]
Proposal to delete the open wire in the context of K.5 � Electronics and Telecommunications Research Institute (ETRI) Q3/5 2014-07-10
[ 346 ]
Suggestion by a measurement result for the progress of K.int � Electronics and Telecommunications Research Institute (ETRI) Q3/5 2014-07-10
[ 345 ]
(Rev.1)
4th draft of K.mpis: Measurement of human exposure levels when a wireless installation is put into service � Korea (Rep. of) Q7/5 2014-07-10
[ 344 ]
(Rev.1)
Monitoring of electromagnetic field levels in Korea � Korea (Rep. of) Q7/5 2014-07-10
[ 343 ]
(Rev.1)
Proposal to update the FAQs in the draft EMF Guide of March 2014 � Korea (Rep. of) Q7/5 2014-07-10
[ 342 ]
Minor addition to K.83 - Monitoring of electromagnetic field levels � Telstra Corporation Ltd. Q7/5 2014-07-10
[ 341 ]
Base text for K.thy: Parameters of fixed-voltage thyristor overvoltage protector components for the protection of telecommunications installations � Bourns Limited Q4/5, Q2/5 2014-07-09
[ 340 ]
Some Considerations on of Electromagnetic Compatibility For Wireless Body Area Communications � ZTE Corporation Q11/5 2014-07-09
[ 339 ]
(Rev.1)
Proposal for revision of K.27 related to earthing configuration of 400 V DC systems � Nippon Telegraph and Telephone Corporation (NTT) Q5/5 2014-07-09
[ 338 ]
(Rev.1)
Proposal for Ethernet port protection using Gas Discharge Tube arrestors (GDTs) against overvoltage � Nippon Telegraph and Telephone Corporation (NTT) Q4/5 2014-07-09
[ 337 ]
(Rev.1)
ITU EMF Guide - Recommendation Proposal � Orange Polska S.A. , Telstra Corporation Ltd. Q7/5 2014-07-09
[ 336 ]
(Rev.1)
3rd Draft of Recommendation K.secmiti � Nippon Telegraph and Telephone Corporation (NTT) Q10/5 2014-07-09
[ 335 ]
(Rev.1-2)
Liaison with CISPR/I about standardizing the test methods for radiation immunity for the use of wireless devices in the vicinity of telecommunication equipment � Nippon Telegraph and Telephone Corporation (NTT) Q9/5 2014-07-09
[ 334 ]
(Rev.1)
Immunity Test Levels considering Near Field for use of Wireless Communication Devices close to Telecommunications Network Equipment � Nippon Telegraph and Telephone Corporation (NTT) Q9/5 2014-07-09
[ 333 ]
(Rev.1)
EMC requirements for electrical systems in the telecommunication facilities � Nippon Telegraph and Telephone Corporation (NTT) Q9/5 2014-07-09
[ 332 ]
(Rev.1-2)
Emission from coaxial cables and connectors � Nippon Telegraph and Telephone Corporation (NTT) Q8/5 2014-07-09
[ 331 ]
EMF - Guide - Comments on the draft from Japan � National Institute of Information and Communications Technology Q7/5 2014-07-09
[ 330 ]
Contribution from Argentina on "Q7/5 - EMF Guide " � Argentina Q7/5 2014-07-09
[ 329 ]
(Rev.1-4)
EMF compliance assessment for radio relays � Alcatel-Lucent International , GSM Association , Orange , Telefon AB - LM Ericsson , Telstra Q7/5 2014-07-08
[ 328 ]
EMF around Fixed Point-to-Point systems - comments to COM 5 - C 0309 � Israel Q7/5 2014-07-07
[ 327 ]
K.mpis recommendation draft -review of COM 5 - C 0311 � Israel Q7/5 2014-07-07
[ 326 ]
RF Human hazards, safety precautions; observations to COM 5 - C 0312 � Israel Q7/5 2014-07-07
[ 325 ]
(Rev.1)
Comment to the draft of the ITU-T Recommendation K.mpis � Orange Polska S.A. Q7/5 2014-07-07
[ 324 ]
Revised proposal for the drafting of a new recommendation K.XXX "Guidance on the Environmental Management for Electromagnetic Radiation from Radiocommunication Base Stations" � China Telecommunications Corporation Q7/5 2014-07-07
[ 323 ]
The first draft of the new Recommendation K.ldt"Lightning Protection of the Dedicated Transformer for Radio Base Station" � China Telecommunications Corporation Q5/5 2014-07-07
[ 322 ]
(Rev.1-2)
K.appl1: Surge Protective Component Application Guide - Gas Discharge Tubes-Update � Bourns Limited Q2/5 2014-07-05
[ 321 ]
New waveshape definitions for 1.2/50-8/20 and 10/700 � Bourns Limited Q4/5, Q2/5 2014-07-04
[ 320 ]
The first draft of k.ntt "Protection of neighborhood of telecommunication towers against lightning" � China Unicom Q5/5 2014-07-04
[ 319 ]
K.20, K.21 and K.45 edits and comments from previous C103 � Bourns Limited Q4/5 2014-07-04
[ 318 ]
(Rev.1)
ITU K44 table question � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 317 ]
(Rev.1)
ITU K44 Ethernet test conditions that should be referenced in K20/21/45 � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 316 ]
(Rev.1)
K20 Table 1a clarification � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 315 ]
(Rev.1)
K21 Table 1a clarification � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 314 ]
(Rev.1)
K45 Table 1 clarification � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 313 ]
(Rev.1-2)
Ethernet surges in ATIS STEP NEP document � Littelfuse UK Ltd. Q4/5 2014-07-03
[ 312 ]
(Rev.1)
Pr�vention des dommages et s�curit� � Dem. Rep. of the Congo Q7/5 2014-07-02
[ 311 ]
K.mpis recommendation draft � Alcatel-Lucent International , Brazil , GSM Association , Orange , Telefon AB - LM Ericsson Q7/5 2014-07-02
[ 310 ]
Proposal on the revision of K.79 considering the vehicle and aero environment � Ministry of Industry and Information Technology (MIIT) Q11/5 2014-07-02
[ 309 ]
(Rev.1-2)
EMF around Fixed Point-to-Point systems � Orange Polska S.A. Q7/5 2014-07-01
[ 308 ]
(Rev.1)
EMF-Guide - Proposed corrections and extensions � Orange Polska S.A. Q7/5 2014-06-23
[ 307 ]
(Rev.1)
Proposal of the revision of Recommendation ITU-T K.52 � Orange Polska S.A. Q7/5 2014-06-23
Results:51 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10