International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : TSB : Circulars : 46 Recently posted�-� Search Meeting Documents
[46]� Meeting of Study Group 2 with a view to approving draft revised Rec. ITU-T E.129, draft new Recs ITU-T E.101, E.157, E.1000, draft new amendments to existing Recs ITU-T E.161.1, E.190, E.191, E.191.1, E.195, and draft new Annex G to existing Rec. ITU-T E.212, in accordance with the provisions of Res.1, Sect.9, of WTSA (Johannesburg, 2008) - Geneva, 24 November 2009

Format

Size

Posted

English

Word

172544 bytes 2009-06-15 [46]�Corrigendum 1

Word

197120 bytes 2009-06-12 [46]�
Arabic

Word

77312 bytes 2009-06-19 [46]�
Chinese

Word

90112 bytes 2009-06-19 [46]�
Espa�ol

Word

452608 bytes 2009-06-19 [46]�
Fran�ais

Word

457216 bytes 2009-06-19 [46]�
Russian

Word

108544 bytes 2009-06-19 [46]�

Document :

ITU-T�TSB� (Study Period 2009)� Circular� 46

Title :

Meeting of Study Group 2 with a view to approving draft revised Rec. ITU-T E.129, draft new Recs ITU-T E.101, E.157, E.1000, draft new amendments to existing Recs ITU-T E.161.1, E.190, E.191, E.191.1, E.195, and draft new Annex G to existing Rec. ITU-T E.212, in accordance with the provisions of Res.1, Sect.9, of WTSA (Johannesburg, 2008) - Geneva, 24 November 2009

Date :

2009-06-12

Source :

SG 2

Destination Groups :

SG02

Observation :

The corrigendum applies to the English version only.

Access :

Public Document

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2010-05-24