International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 16 : Meeting�2009-10-26�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 16� TD-PLEN�(2009-10-26)�

ITU-T�SG 16

Multimedia coding, systems and applications

Study Period 2009

Meeting� from 2009-10-26 to 2009-11-06

held in Switzerland [Geneva]

Other Meetings : 2012-04-302011-11-212011-03-142010-07-19� [ 2009-10-26 ]� 2009-07-102009-06-262009-01-27

Results:19 total items.
Temporary Documents �(PLEN) �[�AI/Question:�QALL/16�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 147-PLEN ]
(Rev.1)
LS to TSAG on issues discussed by SG 16 in relation with revision of ITU-T A.23 Annex A � Chair AHG on A.23 QALL/16 2009-11-04
[ 120-PLEN ]
Report of joint SG 9 and SG 16 plenary session � Chairman SG16 QALL/16 2009-11-02
[ 109-PLEN ]
Agenda for joint SG 9 and SG 16 plenary session � Chairmen SG 9 and SG 16 QALL/16 2009-10-27
[ 108-PLEN ]
(Rev.1)
Identification of Study Group 16 relationships with ISO, IEC and ISO/IEC JTC 1 � TSB QALL/16 2009-10-23
[ 106-PLEN ]
Survey results for SG 16 trial on early availability of unprocessed meeting documents � TSB QALL/16 2009-10-19
[ 105-PLEN ]
Migration of FTP3 server and change in functionality � TSB QALL/16 2009-10-12
[ 104-PLEN ]
Report of the second ITU-T Kaleidoscope event "Innovations for Digital Inclusion" � TSB QALL/16 2009-10-08
[ 103-PLEN ]
Report on the GSC-14 meeting (Geneva, 13-16 July 2009) � TSB QALL/16 2009-08-19
[ 102-PLEN ]
+Add.1-2
Implementation of WTSA-08 Resolution 76: instructions to the ITU-T Study Groups � TSB QALL/16 2009-04-20
[ 99-PLEN ]
Report of TSB Director's Ad Hoc Group on Intellectual Property Rights (IPR), (Geneva, 1 May 2009) � TSB QALL/16 2009-04-20
[ 98-PLEN ]
List of Implementors' Guides for Study Group 16 � TSB QALL/16 2009-04-20
[ 97-PLEN ]
Work programme for Study Group 16 � TSB QALL/16 2009-04-20
[ 96-PLEN ]
(Rev.1)
List of participants (Geneva, 26 October - 6 November 2009) � TSB QALL/16 2009-04-20
[ 95-PLEN ]
Report of Promotion Activities for SG 16 � TSB QALL/16 2009-04-20
[ 94-PLEN ]
(Rev.1-2)
List of IPR information received between February and October 2009 for ITU-T SG 16 Recommendations � TSB QALL/16 2009-04-20
[ 93-PLEN ]
Status of texts Consented at previous meetings � TSB QALL/16 2009-04-20
[ 92-PLEN ]
(Rev.1)
Provisional schedule for the ITU-T SG 16 meeting (Geneva, 26 October - 6 November 2009) � TSB QALL/16 2009-04-20
[ 91-PLEN ]
Lists of Reports and Contributions and of initial Temporary Documents for the Study Group16 Meeting (Geneva, 26 October - 6 November 2009) � TSB QALL/16 2009-04-20
[ 90-PLEN ]
(Rev.1)
Information to Study Group 16 (Geneva, 26 October - 2 November 2009) � TSB QALL/16 2009-04-20
Results:19 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11