International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 16 : Meeting�2009-07-10�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 16� TD�(2009-07-10)�

ITU-T�SG 16

Multimedia terminals, systems and applications

Study Period 2009

Meeting� from 2009-07-10 to 2009-07-10

held in Switzerland [Geneva]

Other Meetings : 2012-04-302011-11-212011-03-142010-07-192009-10-26� [ 2009-07-10 ]� 2009-06-262009-01-27

Results:13 total items.
Temporary Documents �(WP3) �[�AI/Question:�Q10/16�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 67-WP3 ]
(Rev.1)
Draft new G.711 Amendment 1 "Pulse code modulation (PCM) of voice frequencies: new Annex A 'Lossless encoding of PCM frames" (for Consent) � Editor G.711 Amd.1 Q10/16 2009-07-10
[ 64-WP3 ]
(Rev.1) +Add.1-2
Draft new ITU-T G.711.0 (ex G.711-LLC) "Lossless compression of G.711 pulse code modulation" (for Consent) � Editor G.711-LLC Q10/16 2009-07-10
[ 63-WP3 ]
Draft LSs from WP3/16 to IETF and to ETSI DECT, HGI � Chairman WP3/16 Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-09
[ 62-WP3 ]
(Rev.1)
LSs from Q10/16 � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 61-WP3 ]
Draft Processing Test Plan for ITU-T G.711 post-processing module � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 60-WP3 ]
Preparation of the STL Release 2009 � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 59-WP3 ]
Processing Test Plan for the for the ITU-T Joint (G.718/G.729.1) SWB/Stereo extension Optimisation/Characterization phase � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 58-WP3 ]
ITU-T characterization phase of the superwideband extension (SWB) to ITU-T G.722/G.711.1: List of conditions and stereo scenarios � Rapporteurs Q10/16 Q10/16 2009-07-09
[ 57-WP3 ]
+Add.1
Draft new ITU-T Rec.G.729.1 Corrigendum 1 "G.729-based embedded variable bit-rate coder: An 8-32 kbit/s scalable wideband coder bitstream interoperable with G.729: Corrections to source code" (for Consent) � Editor G.729.1 Q10/16 2009-07-09
[ 50-WP3 ]
List of IPR information received between February and July 2009 for ITU-T WP3/16 Recommendations � TSB Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-09
[ 49-WP3 ]
List of Participants � TSB Q10/16, Q9/16, Q8/16, Q7/16, Q6/16 2009-07-06
[ 48-WP3 ]
(Rev.1)
Report of Q10/16 Rapp. Group meeting (Geneva, 6-9 July 2009) � Rapporteurs Q10/16 Q10/16 2009-07-06
[ 43-WP3 ]
Draft agenda and work plan for WP 3/16 (Geneva, 10 July 2009) � Chairman WP 3/16 Q9/16, Q8/16, Q7/16, Q6/16, Q10/16 2009-04-17
Results:13 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10