International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:29 total items.
Contributions �[�Source:�Korea�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2313 ]
Network objectives and APS protocol message communication for MECP � Korea (Rep. of) Q9/15 2012-08-28
[ 2312 ]
Proposed texts for Clause 6.1.2 (SMP for Packet Networks) in G.smp � Korea (Rep. of) Q9/15 2012-08-28
[ 2311 ]
Proposed modifications to external commands in G.smp � Korea (Rep. of) Q9/15 2012-08-28
[ 1705 ]
Enhanced delay measurement for OTN � Korea (Rep. of) Q11/15 2011-11-21
[ 1704 ]
Considerations for G.8031 corrigendum � Korea (Rep. of) Q9/15 2011-11-21
[ 1289 ]
Draft of new ITU-T Recommendation "Disaster managements for outside plant facilities" L.dmosp � Korea Q17/15 2011-02-01
[ 1112 ]
Automatic election of RPL and RPL Owner in G.8032 � Korea (Republic of) Q9/15 2011-01-26
[ 1111 ]
Event message timer for G.8032 interconnected ring � Korea (Republic of) Q9/15 2011-01-26
[ 1110 ]
Proposed text for end-to-end service resilience between Ethernet ring and MPLS-TP ring � Korea (Republic of) Q9/15 2011-01-26
[ 1109 ]
Proposed modification to G.8031/Y.1342 state transition tables for received far-end request � Korea (Republic of) Q9/15 2011-01-26
[ 1108 ]
Hold-off timer operation in G.808.1 � Korea (Republic of) Q9/15 2011-01-26
[ 1107 ]
Proposed modification to G.8031/Y.1342 state transition tables for SD-triggered protection � Korea (Republic of) Q9/15 2011-01-26
[ 887 ]
Black-hole problem due to address mis-learning in G.8032 � Korea (Republic of) Q9/15 2010-05-18
[ 886 ]
Proposal to modify failure of protocol conditions in G.8031 and G.873.1 � Korea (Republic of) Q9/15 2010-05-18
[ 885 ]
MS-W (Manual Switch to Working) in revertive operation in G.8031 � Korea (Republic of) Q9/15 2010-05-18
[ 725 ]
Editorial modification proposal for G.8032 version 2 � Republic of Korea Q9/15 2009-09-20
[ 724 ]
FDB flush operation immune to delayed data frames � Republic of Korea Q9/15 2009-09-20
[ 723 ]
FDB inconsistency problem caused by delayed data frames � Republic of Korea Q9/15 2009-09-20
[ 721 ]
Efficient network restoration scheme for G.8032 � Republic of Korea Q9/15 2009-09-20
[ 720 ]
The appropriate use of Guard timer in pending state in G.8032 � Republic of Korea Q9/15 2009-09-20
[ 719 ]
Proposal for a Revised draft of new ITU-T Recommendation "Integrity testing for telecommunication pole's foundation" � Republic of Korea Q16/15 2009-09-20
[ 350 ]
Revised Proposal for a draft new ITU-T Recommendation "Integrity testing for the foundations of telecommunication poles" � Republic of Korea Q16/15 2009-09-03
[ 279 ]
G.8032 protection switching transient traffic performance requirement for next study period � ETRI (Republic of Korea) Q9/15 2008-11-23
[ 278 ]
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection � ETRI (Korea, Republic of) Q9/15 2008-11-23
[ 156 ]
State machine modification for forced switch in G.8032 Version 2 � ETRI, Korea (Republic of) Q9/15 2008-11-21
[ 136 ]
Proposal for a draft of new ITU-T Recommendation "Non-destructive testing (NDT) for identifying the base condition of telecommunication pole" � Republic of Korea Q16/15 2008-11-20
[ 135 ]
Proposal for a Revised draft of new ITU-T Recommendation "Monitoring system using wireless sensor network (WSN) for outside plant facilities" L.wsn � KT Corporation, Republic of Korea Q16/15 2008-11-20
[ 103 ]
Correction to OPUk-16v frame structure in G.709 � Korea (Republic of) Q11/15 2008-11-20
[ 102 ]
Comments on G.8032 Version 2 - Ethernet ring protection switching � Korea (Republic of) Q9/15 2008-11-20
Results:29 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11