International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:22 total items.
Contributions �[�Source:�Ikanos�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2088 ]
G.fast: Proposed Definitions for G.fast PMD � Ikanos Communications Q4A/15 2012-08-25
[ 1634 ]
(Rev.1)
G.fast: Review of G.fast Simulation Data Relative to Shared Access � Ikanos Communications Q4/15 2011-11-21
[ 1631 ]
(Rev.1)
G.inp, G.vector, VDSL2: Proposed Updated Framework for Extended Memory Operation � Broadcom Corporation , Ikanos Communications , Lantiq Beteiligungs-GmbH & Co. KG Q4/15 2011-11-21
[ 1150 ]
G.inp: Update to G.inp working text on OLR transition time with VDSL2 � Ikanos Q4/15 2011-01-30
[ 1149 ]
G.INP: Proposed messages for SRA in ADSL mode � Broadcom , Ikanos Q4/15 2011-01-30
[ 1147 ]
(Rev.1)
G.vdsl: Framework for sending t1t4 timestamp messages in eoc for ToD phase synchronization � Ikanos Q4/15 2011-01-30
[ 815 ]
G.inp: Clarification to RRC Codeword Redundancy Generation � Ikanos Communications Q4/15 2010-05-16
[ 814 ]
G.inp: Operation of OLR with Retransmission � Ikanos Communications Q4/15 2010-05-16
[ 813 ]
G.vdsl: Method for phase synchronizing VDSL local clocks in support of ToD Transport � Ikanos Communications Q4/15 2010-05-16
[ 812 ]
G.vdsl: Method for Transporting Time-of-Day in VDSL2 Systems � Ikanos Communications Q4/15 2010-05-16
[ 492 ]
G.inp: Comments on Section 8.1.4, framing type 4 � Ikanos Communications, Infineon Technologies NA Q4/15 2009-09-17
[ 393 ]
G.vector: Minimum requirements for frequency-dependent modulation of probe tones � Ikanos Communications Q4/15 2009-09-14
[ 391 ]
G.vector: Sub-sampling of reported error samples � Ikanos Communications Q4/15 2009-09-14
[ 390 ]
G.vector: Guidelines for setting values of Bmin, Bmax, and Lw in reporting of error samples. � Ikanos Communications, Inc. Q4/15 2009-09-14
[ 362 ]
G.vdsl: Compatibility between G.vdsl, G.inp and G.vector - proposed working text � Ikanos Communications Q4/15 2009-09-08
[ 359 ]
G.vector: Zero Padding Operation for Fixed Bandwidth Error Sample Reporting � Ikanos Communications, Inc Q4/15 2009-09-08
[ 358 ]
G.hn: Update on proposed dual FEC encoder for G.hn � Ikanos Communications, Inc. Q4/15 2009-09-08
[ 357 ]
G.vdsl: Integrated version of G.993.2 � Ikanos Communications Q4/15 2009-09-08
[ 356 ]
G.vdsl: Out-of-band noise information in VN � Ikanos Communications Q4/15 2009-09-08
[ 355 ]
G.inp: Update of working text of section C.2 � Ikanos Communications Q4/15 2009-09-08
[ 17 ]
G.hn: Proposal for G.hn.foundation content for consent � Ikanos Communications, Inc. Q4/15 2008-11-17
[ 15 ]
G.adsl: Proposed POTS Splitter References for ADSLx � Ikanos Communications Q4/15 2008-11-17
Results:22 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11