International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:22 total items.
Contributions �[�Source:�France Telecom Orange�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1379 ]
GPLOAM: LOSS-L, LOSS-LFE and UAS � France Telecom Orange Q4/15 2011-02-01
[ 1359 ]
(Rev.1)
Enhancements of the supported G.inp rates for VDSL2 lines operating in conjunction with vectoring � Telecom Italia , France Telecom Orange , Swisscom , TNO Q4/15 2011-02-01
[ 1301 ]
Operator Requirements for MPLS-TP OAM � Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 785 ]
Proposed ITU-T Rec. on remote management of CPE � Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia Q4/15, Q2/15, Q1/15 2010-05-14
[ 687 ]
QL to clockClass mapping � Huawei Technologies , France Telecom Orange Q13/15 2009-09-20
[ 682 ]
Discussion on the use of PTP domains in the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 681 ]
Application of IEEE1588-2008 sections A.9 (recommendation for unicast), 17.5 (unicast discovery) and 17.6 (acceptable master table) to the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 680 ]
Unicast message negotiation notes and corrections � France Telecom Orange Q13/15 2009-09-20
[ 679 ]
Discussion on Synchronous Ethernet jitter specification � France Telecom Orange Q13/15 2009-09-20
[ 678 ]
Application of IEEE1588-2008 section 19.3 to the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 677 ]
Use of physical methods to deliver timing in a multi-operator context � France Telecom Orange Q13/15 2009-09-20
[ 676 ]
OTN island wander budget � France Telecom Orange Q13/15 2009-09-20
[ 675 ]
Options to be considered for the definition of an Alternate BMCA in the scope of the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 674 ]
Ordinary clock attributes and data sets � France Telecom Orange Q13/15 2009-09-20
[ 673 ]
Methodology for PDV network limits definition � France Telecom Orange Q13/15 2009-09-20
[ 672 ]
Editorial comments in the latest draft of G.8264.1 (PTPv2 telecom profile frequency-oriented) � France Telecom Orange Q13/15 2009-09-20
[ 671 ]
Discussion on the BMCA requirements of the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 670 ]
Discussion about the use of an "acceptable slave table" new feature in the PTPv2 telecom profile frequency-oriented � France Telecom Orange Q13/15 2009-09-20
[ 669 ]
France Telecom view on the approval of Recommendation G.9960 � France Telecom Orange Q4/15 2009-09-20
[ 668 ]
Performance aspects of a packet slave clock targeting 50ppb and based on a physical clock with a large time constant and PDV accumulation discussions � France Telecom Orange Q13/15 2009-09-20
[ 662 ]
Discussion on providing an accurate time synchronization service using the native capabilities of time capable network technologies. � Tellabs , France Telecom Orange Q2/15 2009-09-20
[ 626 ]
G.ADSL : Channel Policies � France Telecom Orange Q4/15 2009-09-20
Results:22 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25