International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:70 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�Source:�Deutsche Telekom�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2369 ]
Coordination of G.698.2-related work within SG15 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2366 ]
Definition of the "Tx power difference between polarizations" for G.698.2 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2364 ]
Comments on draft revised Recommendation G.872 � Deutsche Telekom AG Q12/15 2012-08-28
[ 2349 ]
(Rev.1)
Modulation format for 100G in G.698.2 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2333 ]
(Rev.1)
Frequency slot assignment of multicarrier OCh � Deutsche Telekom AG Q11/15 2012-08-28
[ 2332 ]
(Rev.1)
Requirements on OTN interfaces beyond 100 Gbit/s � Deutsche Telekom AG Q11/15 2012-08-28
[ 2331 ]
(Rev.1)
Proposal for future OTN interfaces � Deutsche Telekom AG Q11/15 2012-08-28
[ 2143 ]
G.8273: Test methodology annex/appendix � Calnex Solutions Limited , Deutsche Telekom AG Q13/15 2012-08-27
[ 1937 ]
Mapping of G.798 atomic functions to G.874.1 object classes � Deutsche Telekom AG Q14/15 2011-11-23
[ 1928 ]
Measurement Methods for Phase/Time Clocks � Deutsche Telekom AG Q13/15 2011-11-23
[ 1927 ]
PTP and SyncE over OTN-ODU0 � Deutsche Telekom AG Q13/15 2011-11-23
[ 1926 ]
G.8271: Minor editorial improvements � Deutsche Telekom AG Q13/15 2011-11-23
[ 1925 ]
G.8271 1pps interface performance specification � Deutsche Telekom AG , France T�l�com Orange Q13/15 2011-11-23
[ 1871 ]
Comments on draft revised G.872 � Deutsche Telekom AG Q12/15 2011-11-22
[ 1858 ]
Black Link related amendments to G.872 � Deutsche Telekom AG Q12/15 2011-11-22
[ 1857 ]
Architectural models of OTN transport services � Deutsche Telekom AG Q12/15 2011-11-22
[ 1856 ]
Strong FEC for 40 Gbit/s Black Link applications � Deutsche Telekom AG Q11/15 2011-11-22
[ 1855 ]
Rational for new low bit rate interfaces for the OTN � Deutsche Telekom AG Q6/15, Q11/15 2011-11-22
[ 1520 ]
DOCUMENT WITHDRAWN � Deutsche Telekom Q6/15, Q11/15 2011-08-23
[ 1519 ]
New OTN interfaces in ITU-T G.709 � Deutsche Telekom Q6/15, Q11/15 2011-07-11
[ 1463 ]
Wavelength conversion in reconfigurable multi-degree optical nodes � Deutsche Telekom Q7/15 2011-02-02
[ 1462 ]
Considerations on transverse compatibility for systems according to G.698.2 � Deutsche Telekom Q6/15 2011-02-02
[ 1396 ]
Relation between G.aon and G.872 � Deutsche Telekom Q12/15 2011-02-01
[ 1395 ]
WCh clients in draft G.aon � Deutsche Telekom Q12/15 2011-02-01
[ 1394 ]
Properties of a Wavelength Channel in draft G.aon � Deutsche Telekom Q12/15 2011-02-01
[ 1392 ]
BBER objectives in Recommendation G.8201 � Deutsche Telekom Q9/15 2011-02-01
[ 1297 ]
Considerations on G.800 style ETH transport processing functions in draft revised G.8010 � Huawei , Deutsche Telekom Q12/15 2011-02-01
[ 1296 ]
G.800 server subnetwork and ETH server subnetwork definitions � Huawei , Deutsche Telekom Q12/15 2011-02-01
[ 1295 ]
Models in G.8010 � Huawei , Deutsche Telekom Q9/15, Q14/15, Q12/15 2011-02-01
[ 1267 ]
G.8272 PRTC type approval process proposal � Deutsche Telekom Q13/15 2011-01-31
[ 1266 ]
G.8272 PRTC Options: Temperature � Deutsche Telekom Q13/15 2011-01-31
[ 1265 ]
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x) � Deutsche Telekom Q13/15 2011-01-31
[ 1264 ]
Need for EEC chain hold-over management � Deutsche Telekom Q13/15 2011-01-31
[ 1099 ]
Proposal to specify an transport Ethernet NNI in G.8012 � Deutsche Telekom Q10/15 2010-05-24
[ 1098 ]
Optional metro FEC for OTU4 � Deutsche Telekom Q11/15 2010-05-24
[ 1097 ]
ODUflex resizing and multi-carrier applications � Deutsche Telekom Q12/15, Q11/15 2010-05-24
[ 990 ]
G.827x Slave Clock specification (for time) � Deutsche Telekom Q13/15 2010-05-20
[ 989 ]
Q13 Requirements structure for time supply (G.827x) � Deutsche Telekom Q13/15 2010-05-20
[ 988 ]
Input for G.827x Slave clock specification � Deutsche Telekom Q13/15 2010-05-20
[ 987 ]
SyncE Jitter tolerance (high frequency) � Deutsche Telekom Q13/15 2010-05-20
[ 982 ]
G.vdsl2: KL0bis Estimation for the optional Equalized FEXT UPBO method � Deutsche Telekom Q4/15 2010-05-20
[ 964 ]
Proposed text for a chapter on QoS in G.ptneq � Deutsche Telekom Q9/15 2010-05-19
[ 923 ]
Proposal for a new Supplement regarding optical interface specifications for overclocked signals � Deutsche Telekom , NTT Q6/15, Q11/15 2010-05-18
[ 844 ]
G.8262 V.2 minor comments � Deutsche Telekom Q13/15 2010-05-17
[ 804 ]
SyncE Jitter tolerance values � Deutsche Telekom Q13/15 2010-05-14
[ 743 ]
Mobile LTE specification and phase/time synchronization requirements � Deutsche Telekom Q13/15 2009-09-21
[ 742 ]
NGN Synchronization requirements structure � Deutsche Telekom Q13/15 2009-09-21
[ 741 ]
EEC - SyncE interface jitter and wander measurements � Deutsche Telekom Q13/15 2009-09-21
[ 740 ]
PTP for Phase/ToD application: Need for in-house ToD interface specification � Deutsche Telekom Q13/15 2009-09-21
[ 625 ]
OTU4 FEC for metro distance � Deutsche Telekom Q6/15, Q11/15 2009-09-20
Results:70 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11