International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:56 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�Source:�China Mobile Communications Corp�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2339 ]
PHY and intra-node noise error � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2338 ]
Analysis about SyncE rearrangement for different message delays of G.781 � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2243 ]
Effect of Turnaround on Time Transport Performance using PTP � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2242 ]
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2241 ]
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2240 ]
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2239 ]
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2238 ]
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2237 ]
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2235 ]
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths � China Mobile Communications Corporation , France T�l�com Orange , Huawei Technologies Co. Ltd. , Iometrix Q13/15 2012-08-28
[ 2190 ]
Definition of Signal Degrade in packet networks � Alcatel-Lucent Italia S.p.A.; China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orckit Corrigent , Telecom Italia S.p.A. , ZTE Corporation Q9/15, Q14/15, Q10/15 2012-08-27
[ 2172 ]
Time sync architecture based on multiple PTP domains � China Mobile Communications Corporation , ZTE Corporation Q13/15 2012-08-27
[ 2171 ]
Hold-off time and interactions between frequency and phase-time planes � China Mobile Communications Corporation , ZTE Corporation Q13/15 2012-08-27
[ 2170 ]
A possible solution for multiple GMs and operator intervention � China Mobile Communications Corporation , ZTE Corporation Q13/15 2012-08-27
[ 2169 ]
Sync OAM architecture and requirements � China Mobile Communications Corporation , ZTE Corporation Q13/15 2012-08-27
[ 2166 ]
Requirements for Signal Degrade in packet networks � Alcatel-Lucent Italia S.p.A.; China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orckit Corrigent , Telecom Italia S.p.A. , ZTE Corporation Q9/15, Q10/15 2012-08-27
[ 2161 ]
The Multiplexing mapping principles of MPLS-TP in G8112 � China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. Q10/15 2012-08-27
[ 2158 ]
(Rev.1)
To accelerate research on M-OTN equipment type in G798.1 � China Mobile Communications Corporation , FiberHome Technologies Group Q9/15 2012-08-27
[ 2134 ]
Comment and suggestion for OAM generate process in G.8021 � China Mobile Communications Corporation , FiberHome Technologies Group Q10/15 2012-08-27
[ 2129 ]
Modification to G-Ach extraction process in cd05 � China Mobile Communications Corporation , FiberHome Technologies Group Q10/15 2012-08-27
[ 2118 ]
(Rev.1)
Strong Authentication and Key Management for XG-PON1 � Alcatel-Lucent Shanghai Bell , China Mobile Communications Corporation , China Unicom , China Q2/15 2012-08-27
[ 2103 ]
Exact PTP clockclass values in application � China Mobile Communications Corporation Q13/15 2012-08-26
[ 2102 ]
Proposal on PTP multicast MAC address in 8275.1 � China Mobile Communications Corporation Q13/15 2012-08-26
[ 2101 ]
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network � China Mobile Communications Corporation Q13/15 2012-08-26
[ 2100 ]
Coordinate mechanism for SyncE and PTP � China Mobile Communications Corporation Q13/15 2012-08-26
[ 2099 ]
(Rev.1-2)
Analysis and comparison on PTN ring protection proposals � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation Q9/15 2012-08-26
[ 2098 ]
(Rev.1-3)
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation Q9/15 2012-08-26
[ 2097 ]
(Rev.1-2)
PTN requirements on Ring protection �
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation Q9/15 2012-08-26
[ 2096 ]
(Rev.1-2)
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection � China Mobile Communications Corporation; China Q9/15 2012-08-26
[ 1912 ]
Maintaining the common OTN functional model in draft revised G.872 � Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation Q9/15, Q14/15, Q12/15, Q11/15 2011-11-22
[ 1900 ]
Proposal for maintaining Optical Duo Binary as modulation format for 40G applications in G.698.2 � China , China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. Q6/15 2011-11-22
[ 1848 ]
(Rev.1)
Proposed relationship of security related ME/attributes and OMCI MIB audit/sync increment � China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q2/15 2011-11-22
[ 1844 ]
Requirements for L0/L1/L2 Multi-layer Convergence Network � China , China Mobile Communications Corporation Q9/15, Q14/15, Q12/15, Q10/15 2011-11-22
[ 1843 ]
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results � China , China Mobile Communications Corporation Q9/15, Q14/15, Q12/15, Q10/15 2011-11-22
[ 1841 ]
Proposal of RS422 1PPS time/phase as a time measurement interface � China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation Q13/15 2011-11-22
[ 1800 ]
(Rev.1)
Propose to improve the throughput measurement defined in Y.1731 � China Mobile Communications Corporation , China Unicom , ZTE Corporation Q10/15 2011-11-22
[ 1797 ]
(Rev.1)
Proposals on the conditions for dLOC and dUNP defined in G.8021 � China , China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation Q9/15 2011-11-22
[ 1701 ]
Synchronization Requirement in OTN � China Mobile Communications Corporation Q13/15, Q11/15 2011-11-21
[ 1699 ]
The OAM structure and functions requirements for Packet-based synchronization network � China Mobile Communications Corporation Q13/15 2011-11-21
[ 1698 ]
(Rev.1)
Propose to consent G.8113.1 OAM for large scale application in China Mobile � China Mobile Communications Corporation Q10/15 2011-11-21
[ 1694 ]
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results �
Withdrawn
China , China Mobile Communications Corporation Q9/15, Q14/15, Q12/15, Q10/15 2011-11-21
[ 1673 ]
(Rev.1)
Time transient build out and time offset response � China Mobile Communications Corporation , ZTE Corporation Q13/15 2011-11-21
[ 1672 ]
(Rev.1)
The mixed SSM_PTP application for frequency synchronization � China , China Mobile Communications Corporation , ZTE Corporation Q13/15 2011-11-21
[ 1660 ]
(Rev.1)
Proposal of 1pps as an external interface of PEC � China Mobile Communications Corporation , ZTE Corporation Q13/15 2011-11-21
[ 1659 ]
(Rev.1)
Proposals on the validation of the PTP master � China , China Mobile Communications Corporation , ZTE Corporation Q13/15 2011-11-21
[ 1657 ]
(Rev.1)
Proposals on the factors used for the master selection of time/phase sync � China , China Mobile Communications Corporation , ZTE Corporation Q13/15 2011-11-21
[ 1619 ]
(Rev.1)
The proposal on Sub-Wavelength Cross Connect (SWXC) Type II in G798.1 � China Mobile Communications Corporation , FiberHome Technologies Group Q9/15 2011-11-19
[ 1618 ]
(Rev.1)
Modification on equipment type figures in G798.1 � China Mobile Communications Corporation , FiberHome Technologies Group Q9/15 2011-11-19
[ 903 ]
Pulse-Per-Second Interface � Huawei , CATR , China Mobile Communications Corporation , MII Q13/15 2010-05-18
[ 897 ]
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks � Huawei , China Mobile Communications Corporation Q13/15 2010-05-18
Results:56 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25