International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Transport network structures

Study Period 2009

Results:77 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�Source:�BT�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2389 ]
Implementation of L2.bis modes in ADSL2Plus � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-29
[ 2351 ]
Scope of Q2, as applies to access vs. OTN � British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT) Q6/15, Q2/15, Q12/15 2012-08-28
[ 2330 ]
G.FAST: On TDD frame size � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2329 ]
G.FAST: On LDPC versus RS+TC � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2328 ]
G.FAST: On selection of RTX scheme � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2326 ]
G.FAST: On dynamic asymmetry ratio � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2325 ]
G.FAST: On managing FTTdp functional elements that may have intermitted powering � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2317 ]
Extended RAM Option for Retransmission in VDSL2 � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2316 ]
(Rev.1)
G.FAST: FTTdp Power Budget � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2315 ]
Impact of Sources of Experimental Error on KL0 Determination � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-28
[ 2291 ]
(Rev.1)
Optical Splitter Insertion Loss data representation � British Telecommunications Public Ltd. Co. (BT Plc) Q7/15 2012-08-28
[ 2010 ]
(Rev.1)
Proposed revision of G.698.1 to include low-cost bi-directional WDM-systems � ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Electronics and Telecommunications Research Institute (ETRI) , Gemfire Europe Limited , LG-Ericsson , Nokia Siemens Networks GmbH & Co. KG , Oclaro Technology plc Q6/15 2012-08-24
[ 2005 ]
(Rev.1)
BT proposal for Q 5. SG15 Study topics for Study Period 2013 - 2016 � British Telecommunications Public Ltd. Co. (BT Plc) Q5/15 2012-08-23
[ 1921 ]
[G.ADSL] Low Power ADSL2 (and ADSL2plus) � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1913 ]
(Rev.1)
[G.vdsl] Proposal to develop a VDSL2bis recommendation � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1910 ]
(Rev.1)
G.VDSL2: Accuracy Requirements for KL0 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1899 ]
(Rev.1)
[G.fast] BT requirements for G.fast � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1865 ]
(Rev.1)
[G.fast] Clarification of BT requirement for SELT � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1859 ]
(Rev.1)
[G.fast] G.fast start-up using G.994.1 � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1811 ]
(Rev.1)
[G.fast] TDD Framing Parameters for G.fast � British Telecommunications Public Ltd. Co. (BT Plc) Q4/15 2011-11-22
[ 1737 ]
(Rev.1)
Gigabit-capable Passive Optical Networks (G PON): Reach Extension; Contribution to Amendment 2: Raman amplified G-PON extender � British Telecommunications Public Ltd. Co. (BT Plc) , OFS Fitel, LLC Q2/15 2011-11-21
[ 1471 ]
G.vdsl, G.hn: BT's FTTdp Vision � BT Q4/15 2011-02-02
[ 1441 ]
Withdrawn: MPLS-TP Standards � BT Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1423 ]
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM) � BT Q4/15 2011-02-01
[ 1422 ]
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes � BT Q4/15 2011-02-01
[ 1421 ]
G.VDSL: INM INPEQ Histogram � BT Q4/15 2011-02-01
[ 1419 ]
G.VDSL: INM IAT Histogram � BT Q4/15 2011-02-01
[ 1417 ]
G.LT: PSD Shaped SELT � BT Q4/15 2011-02-01
[ 1403 ]
G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information � BT Q4/15 2011-02-01
[ 1402 ]
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information � BT Q4/15 2011-02-01
[ 1393 ]
G.INP: VDSL2 will require retransmission upstream � BT Q4/15 2011-02-01
[ 1391 ]
Synchronisation Budget � BT Q13/15 2011-02-01
[ 1388 ]
Multiple Independent Timing Domains � BT Q13/15 2011-02-01
[ 1370 ]
Comments on working assumption at Berlin meeting and TD377 (wd31r1) � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q9/15, Q12/15, Q10/15 2011-02-01
[ 1365 ]
Status of IETF OAM tools for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1339 ]
Fulfilling the OAM Requirements for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-02-01
[ 1304 ]
Proposed text for G.tpoam � Cisco , BT , Ericsson , Juniper , NSN , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1303 ]
Inter SDO Cooperation on MPLS-TP � Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5 2011-02-01
[ 1302 ]
Technical issues with an OAM protocol based on draft-bhh-mpls-tp-oam-y1731 � Cisco , BT , Juniper , NSN , Qwest , Telenor , Telstra , Verizon Q10/15 2011-02-01
[ 1301 ]
Operator Requirements for MPLS-TP OAM � Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1146 ]
G.671 PON Splitter Amendment � BT Q7/15 2011-01-28
[ 1145 ]
G.652E - Telecommunications fibres with improved performance inheriting their specification from G.657a1 � BT Q5/15 2011-01-28
[ 1144 ]
ITU-T G.652(E) & G.657 Telecommunications fibres - Enhanced Geometry Amendment � BT Q5/15 2011-01-28
[ 1000 ]
Scale factors for ADSL2+ Virtual Noise � BT Q4/15 2010-05-20
[ 984 ]
KL0bis and Estimation of Electrical Length in VDSL2 � BT Q4/15 2010-05-20
[ 975 ]
ADSL2/ADSl2plus: L2bis mode operator requirements � BT Q4/15 2010-05-19
[ 973 ]
G.LT - Impulsive Noise Measurement � BT Q4/15 2010-05-19
[ 971 ]
G.hn: Broadcast Radio Protection � BT Q4/15 2010-05-19
[ 968 ]
G.LT Transmit PSD and Local Regulation � BT Q4/15 2010-05-19
Results:77 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25