Contributions
�[�Source:�AT&T�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2053 ]
�
(Rev.1)� |
Development of a new PTP Profile for Time/Phase Distribution
�
� |
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
� |
Q13/15
� |
2012-08-24 |
|
[ 2045 ]
�
� |
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
�
� |
AT&T, Inc.
,
Ciena Corporation
� |
Q9/15, Q14/15, Q13/15, Q11/15
� |
2012-08-24 |
|
[ 2032 ]
�
� |
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 1723 ]
�
(Rev.1)� |
Request for evaluation of OTN support for CPRI
�
� |
AT&T, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1722 ]
�
(Rev.1)� |
G.798 PT Interworking Smart?
�
� |
AT&T, Inc.
� |
Q9/15
� |
2011-11-21 |
|
[ 1697 ]
�
(Rev.1)� |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France T�l�com Orange
,
Telecom Italia S.p.A.
� |
Q4/15
� |
2011-11-21 |
|
[ 1567 ]
�
� |
Principle of Cooperation and Lines of Responsibility
�
� |
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
QALL/15
� |
2011-11-18 |
|
[ 1329 ]
�
� |
Rationale for support of 1SL in Y.1731 and G.8021
�
� |
AT&T
,
Verizon
� |
Q9/15, Q10/15
� |
2011-02-01 |
|
[ 1308 ]
�
� |
Reporting of results for pro-active measurement using SLM
�
� |
Cisco
,
AT&T
� |
Q9/15
� |
2011-02-01 |
|
[ 1305 ]
�
� |
Procedural issues on MPLS-TP
�
� |
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-02-01 |
|
[ 1303 ]
�
� |
Inter SDO Cooperation on MPLS-TP
�
� |
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5
� |
2011-02-01 |
|
[ 1300 ]
�
� |
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021
�
� |
Verizon
,
AT&T
� |
Q9/15, Q10/15
� |
2011-02-01 |
|
[ 1290 ]
�
� |
Reporting of results for pro-active measurement using SLM
�
� |
Cisco
,
AT&T
� |
Q9/15
� |
2011-02-01 |
|
[ 1157 ]
�
� |
G.ploam: Proposed Text for Upstream Xlog Test Parameter
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1156 ]
�
� |
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1155 ]
�
� |
G.hnem: G.hnem management
�
� |
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
� |
Q4/15
� |
2011-01-31 |
|
[ 1154 ]
�
� |
G.Gen, G.hx, G.cx: G.hn and G.cx management
�
� |
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
� |
Q4/15
� |
2011-01-31 |
|
[ 1153 ]
�
� |
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1152 ]
�
� |
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
�
� |
ASSIA
,
AT&T
� |
Q4/15
� |
2011-01-31 |
|
[ 1148 ]
�
� |
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
�
� |
AT&T
� |
Q4/15
� |
2011-01-30 |
|
[ 1127 ]
�
(Rev.1)� |
Proposal to define IPv6 host config ME in G.988
�
� |
Ericsson, AT&T, Alcatel-Lucent
� |
Q2/15
� |
2011-01-28 |
|
[ 1025 ]
�
� |
Clarification on ODU Multiplexing
�
� |
AT&T
� |
Q13/15, Q12/15
� |
2010-05-20 |
|
[ 807 ]
�
� |
G.hn Management and Diagnostics Specifications
�
� |
AT&T
� |
Q4/15
� |
2010-05-16 |
|
[ 806 ]
�
� |
Proposed ITU-T Rec. on remote management of CPE
�
� |
AT&T
,
ASSIA Inc
,
Qwest
,
Verizon
� |
Q4/15, Q2/15, Q1/15
� |
2010-05-16 |
|
[ 433 ]
�
� |
Multi-lane STM-256
�
� |
AT&T
� |
Q11/15
� |
2009-09-16 |
|
[ 432 ]
�
� |
Optical Monitoring
�
� |
AT&T
� |
Q7/15, Q6/15
� |
2009-09-16 |
|
[ 431 ]
�
� |
G.709 "Black Link" OTM-1r.m Interface as IrDI
�
� |
AT&T
� |
Q6/15, Q12/15, Q11/15
� |
2009-09-16 |
|
[ 430 ]
�
� |
G.709 OTN domains
�
� |
AT&T
� |
Q11/15
� |
2009-09-16 |
|
[ 412 ]
�
(Rev.1)� |
Latency Measurements in the Optical Transport Network Using G.709 Overhead
�
� |
Verizon
,
AT&T
,
BT
,
Nokia Siemens Networks
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 379 ]
�
� |
Methods for Measuring Multipoint Services Availability
�
� |
Cisco Ciena; China Telecom
,
AT&T
,
Broadcom Corporation
,
Ciena Corporation
,
Verizon
� |
Q9/15, Q10/15
� |
2009-09-10 |
|
[ 364 ]
�
� |
G.INP: Proposed Title and Scope for G.INP
�
� |
AT&T
� |
Q4/15
� |
2009-09-09 |
|
[ 341 ]
�
� |
Living List for proposed "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
�
� |
AT&T, France Telecom, NTT
� |
Q2/15
� |
2009-05-05 |
|
[ 340 ]
�
� |
Proposal to standardize "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
�
� |
AT&T, France Telecom, NTT
� |
Q2/15
� |
2009-05-05 |
|
[ 110 ]
�
� |
Standardization of G.709 Bit Rate Compliant Transparent Transport of 10GBase-R Clients in G.7041 and G.709
�
� |
AT&T, Lucent, Ciena, PMC-Sierra
� |
Q11/15
� |
2008-11-20 |
|
[ 105 ]
�
� |
G.8021 Appendix II Correction
�
� |
AT&T
� |
Q9/15
� |
2008-11-20 |
|
[ 34 ]
�
� |
Proposed ODU0 structure and multiplexing
�
� |
PMC-Sierra, Lucent Technologies, AT&T & Ciena Corp
� |
Q11/15
� |
2008-11-19 |
|
[ 30 ]
�
� |
Status of ATIS NIPP-NAI Technical Report on MIMO Crosstalk Channel Model
�
� |
AT&T, Conexant, ASSIA
� |
Q4/15
� |
2008-11-18 |
|
[ 29 ]
�
� |
G.hn: Proposal for G.hn Foundation Content
�
� |
AT&T, Aware, Conexant, Intel
� |
Q4/15
� |
2008-11-18 |
|
[ 9 ]
�
� |
Proposed G.993.2 Annex A reference to ATIS NIPP TR on Upstream Power Back Off Parameters.
�
� |
AT&T, Conexant, ASSIA Inc.
� |
Q4/15
� |
2008-11-17 |
Results:39 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):