Contributions
�[�AI/Question:�2/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2388 ]
�
� |
Proposal of study items for multi-layer/multi-technology converged transport networks
�
� |
NTT
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2012-08-29 |
|
[ 2387 ]
�
� |
Proposal of clarification of requirements for MPLS-TP p2mp transport path
�
� |
NTT
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2012-08-29 |
|
[ 2373 ]
�
� |
Proposal for G.epon specific managed entities
�
� |
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q2/15
� |
2012-08-28 |
|
[ 2372 ]
�
� |
Proposal for G.epon related managed entities
�
� |
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q2/15
� |
2012-08-28 |
|
[ 2368 ]
�
� |
Low-complexity DWDM system with self-seeded optical transceivers
�
� |
Futurewei Technologies US R&D Center
� |
Q6/15, Q2/15, Q12/15
� |
2012-08-28 |
|
[ 2367 ]
�
� |
Proposal of inter-OLT communication in G.multi
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2012-08-28 |
|
[ 2365 ]
�
� |
Discussion on G.poc upstream transmission
�
� |
Futurewei Technologies US R&D Center
� |
Q4A/15, Q2/15, Q1/15
� |
2012-08-28 |
|
[ 2364 ]
�
� |
Comments on draft revised Recommendation G.872
�
� |
Deutsche Telekom AG
� |
Q12/15
� |
2012-08-28 |
|
[ 2363 ]
�
� |
2.5G upstream GPON discussion
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2012-08-28 |
|
[ 2351 ]
�
� |
Scope of Q2, as applies to access vs. OTN
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q2/15, Q12/15
� |
2012-08-28 |
|
[ 2334 ]
�
(Rev.1)� |
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1
�
� |
ADVA Optical Networking
,
Ericsson, Inc.
,
France T�l�com Orange
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2012-08-28 |
|
[ 2322 ]
�
(Rev.1)� |
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
�
� |
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
� |
Q3/15, Q12/15
� |
2012-08-28 |
|
[ 2314 ]
�
� |
Proposal of Consent of Recommendation on APS based MPLS-TP Linear Protection
�
� |
Japan
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2012-08-28 |
|
[ 2308 ]
�
� |
Proposal for inclusion of Performance Measurement Methods of Advanced Modulation Formats in G.ngpon2.2
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2012-08-28 |
|
[ 2305 ]
�
� |
Proposal for inclusion of Advanced Modulation Formats in G.ngpon2.2
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2012-08-28 |
|
[ 2300 ]
�
� |
Proposal to add fixed wavelength assignment in physical layer in G.multi
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q2/15
� |
2012-08-28 |
|
[ 2298 ]
�
(Rev.1)� |
Proposal to add some parameter definitions for G.ng-pon2.2
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q2/15
� |
2012-08-28 |
|
[ 2296 ]
�
� |
Proposal to add O-OFDM as another line code option in the Annex A of the G.ngpon2.2
�
� |
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2012-08-28 |
|
[ 2281 ]
�
� |
The considerations about beyond 100G OTN requirements
�
� |
China Telecommunications Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2012-08-28 |
|
[ 2270 ]
�
(Rev.1)� |
ITU-T study item discussion on transport network with backhaul traffic optimization
�
� |
China Unicom
� |
Q12/15
� |
2012-08-28 |
|
[ 2263 ]
�
� |
Propose a new equipment model of converged access and transport node
�
� |
ZTE Corporation
� |
Q9/15, Q2/15, Q12/15
� |
2012-08-28 |
|
[ 2262 ]
�
(Rev.1)� |
Proposal to study a converged access and transport network
�
� |
ZTE Corporation
� |
Q2/15, Q12/15
� |
2012-08-28 |
|
[ 2248 ]
�
� |
Proposal for G.multi architecture
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-28 |
|
[ 2247 ]
�
(Rev.1)� |
Clarification to various types of MW-PON systems in G.multi Scope
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-28 |
|
[ 2246 ]
�
+Corr.1� |
Serial data acquisition by XGPON
�
� |
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2234 ]
�
� |
Clarification on Ethernet transport network architecture in G.8010
�
� |
Hitachi, Ltd.
� |
Q12/15
� |
2012-08-28 |
|
[ 2227 ]
�
� |
General discussion on wavelength tuning for G.multi
�
� |
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2226 ]
�
� |
General discussion on registration for G.multi
�
� |
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2223 ]
�
� |
Proposal for NG-PON2 TC layer standardization
�
� |
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2221 ]
�
� |
TC layer framing in TWDM PON
�
� |
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2218 ]
�
� |
Unified Power Management for PON systems
�
� |
ZTE Corporation
� |
Q2/15
� |
2012-08-28 |
|
[ 2215 ]
�
� |
OTN Architecture Extensions
�
� |
Infinera Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2012-08-28 |
|
[ 2176 ]
�
� |
Living List of G.epon
�
Withdrawn: Reposted as TD817/WP1
� |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2012-08-27 |
|
[ 2173 ]
�
� |
Draft document of G.epon
�
Withdrawn: Reposted as TD817/WP1
� |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q2/15
� |
2012-08-27 |
|
[ 2157 ]
�
(Rev.1)� |
Considerations on next steps beyond 100 Gbit/s applications
�
� |
China Unicom
,
Huawei Technologies Co. Ltd.
� |
Q6/15, Q12/15, Q11/15
� |
2012-08-27 |
|
[ 2142 ]
�
(Rev.1)� |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
�
� |
ZTE Corporation
� |
Q14/15, Q12/15, Q11/15
� |
2012-08-27 |
|
[ 2130 ]
�
� |
Proposal for ONU registration and wavelength tuning functions required in MW-PONs with wavelength-splitter-based ODN
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2012-08-27 |
|
[ 2120 ]
�
� |
Transport of wavelength information via new PLOAM message for enabling ONU transfer in MW-PON system
�
� |
Alcatel-Lucent Shanghai Bell
� |
Q2/15
� |
2012-08-27 |
|
[ 2118 ]
�
(Rev.1)� |
Strong Authentication and Key Management for XG-PON1
�
� |
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
,
China Unicom
,
China
� |
Q2/15
� |
2012-08-27 |
|
[ 2111 ]
�
+Corr.1� |
Proposal to G.multi: wavelength management channel choice and announcement in Stacked-PON
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-27 |
|
[ 2110 ]
�
+Corr.1� |
Proposal to G.multi: the framework of transmission convergence layer function in CO
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-27 |
|
[ 2109 ]
�
+Corr.1� |
Proposal on supporting OTDR function for G.984.5
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-27 |
|
[ 2108 ]
�
+Corr.1� |
Proposal on an asymmetric wavelength number physical architechture for G.ngpon2.2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2012-08-27 |
|
[ 2058 ]
�
� |
Misalignment among G.709, G.798 and G.872
�
� |
Ciena Corporation
� |
Q9/15, Q12/15, Q11/15
� |
2012-08-24 |
|
[ 2013 ]
�
(Rev.1)� |
OLT cooperation in PON
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/15
� |
2012-08-24 |
|
[ 2012 ]
�
� |
Not used
�
Duplicate of C-2263
� |
N/A
� |
Q2/15
� |
2012-08-24 |
|
[ 2011 ]
�
� |
No used
�
Duplicate of C-2262
� |
N/A
� |
Q2/15
� |
2012-08-24 |
|
[ 1992 ]
�
(Rev.1)� |
Inverse multiplexing for ODUS
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2012-08-23 |
|
[ 1991 ]
�
(Rev.1)� |
Architecture Consideration for the extension of OTN Beyond 100G
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2012-08-23 |
|
[ 1980 ]
�
� |
Proposed Liaison on Control Plane and Data Plane
�
� |
Ciena Canada
� |
Q12/15
� |
2012-08-22 |
Results:307 total items. Result page:�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):