International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG15� TD-WP3�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : [ 2012-09-10 ]� 2012-05-11� 2011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:38 total items.
Temporary Documents �(WP3) �[�AI/Question:�Q13/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 798-WP3 ]
Interim meetings for WP3/15 � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-13
[ 797-WP3 ]
Liaison Statements To/From WP3/15 � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-13
[ 796-WP3 ]
WP3/15 Status of Recommendations � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-13
[ 795-WP3 ]
WP3/15 documents for Approval, Determination, Consent, and Agreement � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-13
[ 794-WP3 ]
Report of Working Party 3/15 - TRANSPORT NETWORK STRUCTURES (Geneva meeting, 10-21 September 2012) � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-13
[ 792-WP3 ]
Agenda for the joint meeting Q9, Q11 and Q13/15 � Rapporteur Q13/15 Q9/15, Q13/15, Q11/15 2012-09-12
[ 785-WP3 ]
Simulations of Transport of Time over Packet Networks � Editor G.supp Q13/15 2012-09-07
[ 783-WP3 ]
(Rev.1-2)
Q13/15: Agenda � Rapporteur Q13/15 Q13/15 2012-09-06
[ 782-WP3 ]
iLS: SG15 opinion on draft-manhoudt-pwe3-tsop-01.txt Submission � IETF PWE3 Q9/15, Q13/15, Q12/15, Q11/15 2012-09-06
[ 781-WP3 ]
WP3/15 agenda (Geneva, September 2012) � Chairman WP3/15 Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-09-05
[ 780-WP3 ]
iLS: The CPRI response to ITU Liaison Statement COM 15 - LS 384 - E � CPRI Q13/15 2012-09-04
[ 776-WP3 ]
G.8275.1: Latest draft � Editor G.8275.1 Q13/15 2012-09-03
[ 775-WP3 ]
G.8275.1: Living list � Editor G.8275.1 Q13/15 2012-09-03
[ 771-WP3 ]
Definition of physical interfaces for a time synchronization interface � Rapporteur Q13/15 Q9/15, Q13/15, Q11/15 2012-09-03
[ 766-WP3 ]
G.8275/Y.1367: Living list (V0.7) � Editor G.8275/Y.1367 Q13/15 2012-08-29
[ 765-WP3 ]
G.8275/Y.1367: Architecture for time/phase (V0.2) � Editor G.8275/Y.1367 Q13/15 2012-08-29
[ 764-WP3 ]
Proposed text to address partial PTP support in G.8275 � Editor G.8275/Y.1367 Q13/15 2012-08-29
[ 763-WP3 ]
Functional models and network architecture recommendations � Editor G.8275/Y.1367 Q13/15 2012-08-29
[ 761-WP3 ]
G.8263/Y.1363: Draft amendment for Appendix II (Packet Delay Variation Noise Tolerance testing) � Editor G.8263/Y.1363 Q13/15 2012-08-28
[ 760-WP3 ]
Clarification for Draft Amendment 2 to Recommendation G.8262/Y1362 � Editor G.8262/Y.1362 Q13/15 2012-08-28
[ 755-WP3 ]
G.8260: Living list � Editor G.8260 Q13/15 2012-08-27
[ 754-WP3 ]
G.8260: Latest draft � Editor G.8260 Q13/15 2012-08-27
[ 751-WP3 ]
G.8273/Y.1368: Living list � Editor G.8273/Y.1368 Q13/15 2012-08-26
[ 750-WP3 ]
G.8273.2/Y.1368.2: Living list � Editor G.8273.2/Y.1368.2 Q13/15 2012-08-26
[ 749-WP3 ]
G.8273.2/Y.1368.2: Latest draft � Editor G.8273.2/Y.1368.2 Q13/15 2012-08-26
[ 748-WP3 ]
G.8273.1/Y.1368.1: Living list � Editor G.8273.1/Y.1368.1 Q13/15 2012-08-26
[ 747-WP3 ]
G.8272/Y.1367: Living list � Editor G.8272/Y.1367 Q13/15 2012-08-26
[ 735-WP3 ]
Latest draft of Recommendation ITU-T G.8271/Y.1366 (ex. G.pactiming-bis, G.8266) � Editor G.8271/Y.1366 Q13/15 2012-08-21
[ 734-WP3 ]
Latest draft of new Recommendation ITU-T G.8271.1/Y.1366.1 � Editor G.8271.1/Y.1366.1 Q13/15 2012-08-21
[ 733-WP3 ]
Living list for Recommendations ITU-T G.8271/Y.1366 and G.8271.1/Y.1366.1 � Editor G.8271/Y.1366 and G.8271.1/Y.1366.1 Q13/15 2012-08-21
[ 724-WP3 ]
iLS: Liaison response to ITU-T on LS-388 SMP � MEF Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-08-02
[ 722-WP3 ]
iLS: Liaison response to ITU-T on LS-397 G.8011 � MEF Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-08-02
[ 721-WP3 ]
iLS: Liaison response to ITU-T on LS-358 OTNT Work Plan � MEF Q9/15, Q3/15, Q15/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2012-08-02
[ 711-WP3 ]
Report of SG13/15 Interim Meeting in Helsinki (4-8 June 2012) � Rapporteur Q13/15 Q13/15 2012-06-20
[ 710-WP3 ]
iLS: Reply LS on coordination between ITU-T and 3GPP on synchronization � 3GPP TSG RAN Q13/15 2012-06-18
[ 696-WP3 ]
iLS: Liaison to ITU-T SG-15 - Q.13 � MEFf Q13/15 2012-04-24
[ 695-WP3 ]
iLS: Liaison announcing initiation of MEF 22.2 Mobile Backhaul Implementation Agreement Phase 3 � MEF Q13/15 2012-04-24
[ 690-WP3 ]
Report of the SG15/13 Interim Meeting, Boulder (12-16 March 2012) � Rapporteur Q13/15 Q13/15 2012-03-22
Results:38 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25