International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG15� TD-WP1�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : [ 2012-09-10 ]� 2012-05-11� 2011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:69 total items.
Result page:� 1 - 2 �-�Next Next
Temporary Documents �(WP1) �[�Source:�Rapporteur �]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 836-WP1 ]
Rapporteur Report of the Q4a/15 sessions (10 - 20 September 2012). � Rapporteur Q4a/15 Q4A/15 2012-09-20
[ 833-WP1 ]
Q4C/15: Meeting report (20 September 2012) � Rapporteur Q4c/15 Q4c/15 2012-09-20
[ 831-WP1 ]
oLS: Consented Amendment 2 to Recommendation ITU-T G.993.2 (2011) � Rapporteur Q4a/15 Q4A/15 2012-09-20
[ 830-WP1 ]
oLS: Concern on CEN-CENELEC-ETSI Smart Grid Coordination Group (SGCG) Technical Reports � Rapporteur Q4C/15 Q4C/15 2012-09-20
[ 828-WP1 ]
Q1/15: Meeting report (19 September 2012) � Rapporteur Q1/15 Q1/15 2012-09-19
[ 827-WP1 ]
Version 20 of the ANT Standards Work Plan � Rapporteur Q1/15 Q1/15 2012-09-19
[ 826-WP1 ]
Version 22 of the ANT Standards Overview � Rapporteur Q1/15 Q1/15 2012-09-19
[ 825-WP1 ]
oLS: September discussion regarding the interaction of optical access and G.fast systems" � Rapporteur Q2/15 , Rapporteur Q4a/15 Q4A/15, Q2/15 2012-09-19
[ 824-WP1 ]
oLS: G.993.2 with retransmission and SRA � Rapporteur Q4a/15 Q4A/15 2012-09-19
[ 821-WP1 ]
(Rev.1-2)
Q2/15 meeting minutes (Geneva, 10 September 2012) � Rapporteur Q2/15 Q2/15 2012-09-13
[ 819-WP1 ]
Q4b/15: Agenda and work programme � Rapporteur Q4b/15 Q4B/15 2012-09-12
[ 816-WP1 ]
(Rev.1)
Q2/15 draft agenda (Geneva, 10 September 2012) � Rapporteur Q2/15 Q2/15 2012-09-10
[ 814-WP1 ]
Q1/15: Comments on meeting agenda and identification of review documents � Rapporteur Q1/15 Q1/15 2012-09-08
[ 787-WP1 ]
New Q1/15 assignments from the WP1/15 Chairman � Rapporteur Q1/15 Q1/15 2012-08-24
[ 786-WP1 ]
Report of Q1/15 meeting (Geneva, 12 December 2011) � Rapporteur Q1/5 Q1/15 2012-08-24
[ 785-WP1 ]
(Rev.1)
Q1/15 agenda (19 September 2012) � Rapporteur Q1/15 Q1/15 2012-08-24
[ 779-WP1 ]
Report of G.vector teleconference (23 August 2012) � Rapporteur Q4a/15 Q4A/15 2012-08-27
[ 778-WP1 ]
Report of the Q4a/15 G.fast teleconference call (5 July 2012) � Associate Rapporteur Q4a/15 Q4A/15 2012-08-21
[ 777-WP1 ]
Report of the Q4a/15 G.fast teleconference call (28 June 2012) � Associate Rapporteur Q4a/15 Q4A/15 2012-08-21
[ 776-WP1 ]
Rapporteur report of the Q4a/15 meeting (Redwood City, 30 July - 3 August 2012) � Rapporteur Q4a/15 Q4A/15 2012-08-21
[ 775-WP1 ]
Rapporteur report of the Q4a/15 meeting (Antwerp, 18-22 June 2012) � Rapporteur Q4a/15 Q4A/15 2012-08-21
[ 772-WP1 ]
Report of Q4c/15 Rapporteur meeting (Redwood City, July 2012) � Rapporteur Q4c/15 Q4C/15 2012-08-21
[ 769-WP1 ]
G.hn: Initial draft text for G.9963 Corrigendum 1 � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 768-WP1 ]
G.hn: Updated draft text for G.9961 (2010) Corrigendum 2 � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 765-WP1 ]
(Rev.1)
G.hn: Updated Issues List for continuing work on G.hn � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 764-WP1 ]
Rapporteur Report of the Q4b/15 teleconference calls (17/29 May, 7 June 2012) � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 763-WP1 ]
Rapporteur Report of the Q4b/15 meeting (29 July - 2 August 2012) � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 762-WP1 ]
Rapporteur Report of the Q4b/15 meeting (7-11 May 2012) � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 761-WP1 ]
Rapporteur Report of the Q4b/15 meeting (26-28 March 2012) � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 760-WP1 ]
Rapporteur Report of the Q4b/15 meeting (23-26 January 2012) � Rapporteur Q4b/15 Q4B/15 2012-08-20
[ 758-WP1 ]
(Rev.1-2)
G.fast: Updated Issues List for G.fast � Rapporteur Q4a/15 2012-08-20
[ 757-WP1 ]
Meeting report of Q2/15 Telecon / NG-PON2 and OMCI (2012-08-07) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 756-WP1 ]
Meeting report of Q2/15 Telecon / NG-PON2 (2012-07-24) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 755-WP1 ]
Report of Q2/15 meeting (Santa Clara, 28 June 2012) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 754-WP1 ]
Meeting report of Q2/15 Telecon / XG-PON reach extender, other topics (2012-06-05) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 753-WP1 ]
Meeting report of Q2/15 Telecon / Bath overflow and other topics (2012-05-16) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 752-WP1 ]
Report of Q2/15 meeting (Bath, 26 April 2012) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 751-WP1 ]
Meeting report of Q2/15 Telecon / LC comment resolution (2012-04-10) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 750-WP1 ]
Meeting report of Q2/15 Telecon / LC comment resolution (2012-03-26) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 749-WP1 ]
Meeting report of Q2/15 Telecon / LC comment resolution (2012-03-02) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 748-WP1 ]
Report of Q2/15 meeting (Huntsville, 9 February 2012) � Rapporteur Q2/15 Q2/15 2012-08-20
[ 747-WP1 ]
Compendium of Q2/15 meeting minutes from January to August 2012 � Rapporteur Q2/15 Q2/15 2012-08-20
[ 746-WP1 ]
oLS: On cable models, noise models and test loops for G.fast � Rapporteur Q4a/15 Q4A/15 2012-08-20
[ 743-WP1 ]
oLS: Liaison to IEEE P1901.2 and PAP 15 on NB-PLC coexistence � Rapporteur Q4c/15 Q4C/15 2012-08-11
[ 742-WP1 ]
oLS: G.993.2 Annex B � Rapporteur Q4a/15 Q4A/15 2012-08-10
[ 741-WP1 ]
oLS: Situation regarding the interaction of optical access and G.fast systems � Rapporteur Q2/15 Q2/15 2012-08-02
[ 734-WP1 ]
Liaison statements to IEEE 802.3 and P1904.1 � Rapporteur Q2/15 Q2/15 2012-07-05
[ 733-WP1 ]
oLS: Cooperation on development of G.fast � Rapporteur Q4a/15 Q4A/15 2012-07-04
[ 732-WP1 ]
oLS: Cooperation on POTS adaptors and remote power feeding for G.fast � Rapporteur Q4a/15 Q4A/15 2012-07-04
[ 721-WP1 ]
Updated Issues List for continuing work on G.hn � Rapporteur Q4b/15 Q4B/15 2012-05-11
Results:69 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11