International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:3 total items.
Contributions �[�Source:�Oclaro Technology plc�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2128 ]
Considerations on the Error Vector Magnitude definition for G.698.2 � ADVA Optical Networking , Agilent Technologies R&D and Marketing GmbH & Co. KG , Oclaro Technology plc Q6/15 2012-08-27
[ 2127 ]
Signal Processing Steps for Test & Measurement of Complex Modulation Signals � ADVA Optical Networking , Agilent Technologies R&D and Marketing GmbH & Co. KG , Oclaro Technology plc Q6/15 2012-08-27
[ 2010 ]
(Rev.1)
Proposed revision of G.698.1 to include low-cost bi-directional WDM-systems � ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Electronics and Telecommunications Research Institute (ETRI) , Gemfire Europe Limited , LG-Ericsson , Nokia Siemens Networks GmbH & Co. KG , Oclaro Technology plc Q6/15 2012-08-24
Results:3 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11