International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:8 total items.
Contributions �[�Source:�Anue Systems�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2084 ]
Testing Packet Clocks (re. G.8263) - Part 2 � Anue Systems Q13/15 2012-08-25
[ 2083 ]
Normal operation of telecom-grade network elements for supporting packet-based timing � Anue Systems Q13/15 2012-08-25
[ 2082 ]
Packet Timing Monitor - Definition � Anue Systems Q13/15 2012-08-25
[ 2081 ]
Annex for G.8273 discussing performance parameters for PTP clocks � Anue Systems Q13/15 2012-08-25
[ 2080 ]
Organization of T-BC performance requirements � Anue Systems Q13/15 2012-08-25
[ 2079 ]
Time Error of PTP master ports � Anue Systems Q13/15 2012-08-24
[ 2078 ]
Time error accumulation in chains of phase/time clocks � Anue Systems Q13/15 2012-08-24
[ 2077 ]
Estimating constant time error and related measurement methods for phase/time clocks � Anue Systems Q13/15 2012-08-24
Results:8 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26