International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:30 total items.
Contributions �[�AI/Question:�Q11/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 2333 ]
(Rev.1)
Frequency slot assignment of multicarrier OCh � Deutsche Telekom AG Q11/15 2012-08-28
[ 2332 ]
(Rev.1)
Requirements on OTN interfaces beyond 100 Gbit/s � Deutsche Telekom AG Q11/15 2012-08-28
[ 2331 ]
(Rev.1)
Proposal for future OTN interfaces � Deutsche Telekom AG Q11/15 2012-08-28
[ 2327 ]
A proposal to modification of G.709 to add OTU0 frame � Electronics and Telecommunications Research Institute (ETRI) , LG-Ericsson , SK Telecom Q11/15 2012-08-28
[ 2281 ]
The considerations about beyond 100G OTN requirements � China Telecommunications Corporation Q6/15, Q12/15, Q11/15 2012-08-28
[ 2254 ]
Consideration for ODU SMP supporting ODUflex signal resizing � Electronics and Telecommunications Research Institute (ETRI) Q9/15, Q11/15 2012-08-28
[ 2249 ]
A proposal of other alternative OTUkV frame structures for low latency transport � Altera Corporation , Electronics and Telecommunications Research Institute (ETRI) , LG-Ericsson , SK Telecom Q11/15 2012-08-28
[ 2217 ]
Proposal for FEC overhead of OTU5 � ZTE Corporation; China Q6/15, Q11/15 2012-08-28
[ 2216 ]
Proposal to add OTU0 frame in G.709/Y.1331 � Altera Corporation , Electronics and Telecommunications Research Institute (ETRI) , LG-Ericsson , SK Telecom Q11/15 2012-08-28
[ 2215 ]
OTN Architecture Extensions � Infinera Corporation Q6/15, Q12/15, Q11/15 2012-08-28
[ 2180 ]
Multilayer protocol stack of OTN interface � Huawei Technologies Co. Ltd. Q11/15 2012-08-27
[ 2179 ]
(Rev.1)
Consideration on multiplex structure, timeslot granularity and client mapping in next ODU/OTU signals � Huawei Technologies Co. Ltd. Q11/15 2012-08-27
[ 2178 ]
Considerations on flexible OTU frame structures � Huawei Technologies Co. Ltd. Q11/15 2012-08-27
[ 2157 ]
(Rev.1)
Considerations on next steps beyond 100 Gbit/s applications � China Unicom , Huawei Technologies Co. Ltd. Q6/15, Q12/15, Q11/15 2012-08-27
[ 2142 ]
(Rev.1)
Proposal to extend the index n of OPSn in the text of next revision of G.874.1 � ZTE Corporation Q14/15, Q12/15, Q11/15 2012-08-27
[ 2087 ]
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes � PMC-Sierra, Inc. Q9/15, Q14/15, Q13/15, Q11/15 2012-08-25
[ 2086 ]
Proposed clarification for the CSF start time in G.7041 � PMC-Sierra, Inc. Q11/15 2012-08-25
[ 2085 ]
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces � PMC-Sierra, Inc. Q11/15 2012-08-25
[ 2062 ]
Mapping of 16G Fibre-Channel into OTN � Alcatel-Lucent USA Inc. Q11/15 2012-08-24
[ 2058 ]
Misalignment among G.709, G.798 and G.872 � Ciena Corporation Q9/15, Q12/15, Q11/15 2012-08-24
[ 2045 ]
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes � AT&T, Inc. , Ciena Corporation Q9/15, Q14/15, Q13/15, Q11/15 2012-08-24
[ 2035 ]
Alignment of APS specifications in G.873.1, G.798, and G.709 � Tellabs Oy Q9/15, Q11/15 2012-08-24
[ 2000 ]
Proposal to add a reference to HAO overhead in G.709 � Huawei Technologies Co. Ltd. Q11/15 2012-08-23
[ 1998 ]
Updating APS/PCC specifications in clause 15.8.2.4 of G.709, Table 7-1/G.873.1 and server to ODU (ODUkP to ODUj and OTUk[V] to ODUk) adaptation functions in G.798 � Huawei Technologies Co. Ltd. Q9/15, Q11/15 2012-08-23
[ 1992 ]
(Rev.1)
Inverse multiplexing for ODUS � China Telecommunications Corporation , ZTE Corporation Q9/15, Q6/15, Q14/15, Q12/15, Q11/15 2012-08-23
[ 1991 ]
(Rev.1)
Architecture Consideration for the extension of OTN Beyond 100G � China Telecommunications Corporation , ZTE Corporation Q9/15, Q6/15, Q14/15, Q12/15, Q11/15 2012-08-23
[ 1990 ]
OTUk-AIS Clarifications � Altera Newfoundland Technology Centre (Altera NTC) Q9/15, Q11/15 2012-08-22
[ 1970 ]
(Rev.1)
Backward compatible precise delay measurement method for OTN � Alcatel-Lucent Deutschland AG Q9/15, Q11/15 2012-08-22
[ 1963 ]
Consideration on OTL interface for OTU5 � Fujitsu Limited Q11/15 2012-08-17
[ 1962 ]
Flexible high speed interfaces � Ericsson UK Q11/15 2012-08-16
Results:30 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11