International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:452 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2390 ]
Optic Fiber networks in Burundi � Burundi QALL/15 2012-08-29
[ 2389 ]
Implementation of L2.bis modes in ADSL2Plus � British Telecommunications Public Ltd. Co. (BT Plc) Q4A/15 2012-08-29
[ 2388 ]
Proposal of study items for multi-layer/multi-technology converged transport networks � NTT Q9/15, Q14/15, Q12/15, Q10/15 2012-08-29
[ 2387 ]
Proposal of clarification of requirements for MPLS-TP p2mp transport path � NTT Q9/15, Q3/15, Q14/15, Q12/15, Q10/15 2012-08-29
[ 2386 ]
10 G signal transmission in seeded DWDM system � LG-Ericsson Q6/15 2012-08-29
[ 2385 ]
Comparison of proposed low cost DWDM system � LG-Ericsson Q6/15 2012-08-29
[ 2384 ]
(Rev.1)
Boundary clock in networks and simulations � Tellabs Oy Q13/15 2012-08-28
[ 2383 ]
(Rev.1)
Boundary clock simulation model � Tellabs Oy Q13/15 2012-08-28
[ 2382 ]
Not used �
Duplicate of C-2383
N/A � 2012-08-28
[ 2381 ]
(Rev.1)
G.8265.1 supported duration of negotiated service � Tellabs Oy Q13/15 2012-08-28
[ 2380 ]
G.fast: Minimum Duration of Transmission Opportunity � Huawei Technologies Co. Ltd. Q4A/15 2012-08-28
[ 2379 ]
G.hn: Adding pre-defined BATs with bit loading up to 30MHz for an Amendment to G.9960 � Sigma Designs Israel S.D.I Ltd. Q4B/15 2012-08-28
[ 2378 ]
Reversion fails at simultaneous clear SFs in PSC based MPLS-TP linear protection � Electronics and Telecommunications Research Institute (ETRI) Q9/15 2012-08-28
[ 2377 ]
G.fast: Per-Frame MAP � Sckipio Technologies S.I. Ltd. Q4A/15 2012-08-28
[ 2376 ]
Proposal for determined Amendment 1 of G.9955 main body : EVM Evaluation � Yitran Communications Ltd. Q4C/15 2012-08-28
[ 2375 ]
Cooperation of G.781 and BMCA in telecom profile for time � Nokia Siemens Networks GmbH & Co. KG Q13/15 2012-08-28
[ 2374 ]
PDV test pattern for G.8263 � Nokia Siemens Networks GmbH & Co. KG Q13/15 2012-08-28
[ 2373 ]
Proposal for G.epon specific managed entities � Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI) Q2/15 2012-08-28
[ 2372 ]
Proposal for G.epon related managed entities � Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI) Q2/15 2012-08-28
[ 2371 ]
Incorporation of agreed changes in G.8121.2 � Cisco Systems, Inc. Q9/15 2012-08-28
[ 2370 ]
Comparison of protection interworking architectures using distributed G.8031 � Electronics and Telecommunications Research Institute (ETRI) Q9/15 2012-08-28
[ 2369 ]
Coordination of G.698.2-related work within SG15 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2368 ]
Low-complexity DWDM system with self-seeded optical transceivers � Futurewei Technologies US R&D Center Q6/15, Q2/15, Q12/15 2012-08-28
[ 2367 ]
Proposal of inter-OLT communication in G.multi � Futurewei Technologies US R&D Center Q2/15 2012-08-28
[ 2366 ]
Definition of the "Tx power difference between polarizations" for G.698.2 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2365 ]
Discussion on G.poc upstream transmission � Futurewei Technologies US R&D Center Q4A/15, Q2/15, Q1/15 2012-08-28
[ 2364 ]
Comments on draft revised Recommendation G.872 � Deutsche Telekom AG Q12/15 2012-08-28
[ 2363 ]
2.5G upstream GPON discussion � Futurewei Technologies US R&D Center Q2/15 2012-08-28
[ 2362 ]
Scope of G.8275.1 � France T�l�com Orange Q13/15 2012-08-28
[ 2361 ]
Review of G.8272 latest draft � France T�l�com Orange Q13/15 2012-08-28
[ 2360 ]
G.8272: New Appendix describing possible PRTC locations � France T�l�com Orange Q13/15 2012-08-28
[ 2359 ]
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing � France T�l�com Orange Q13/15 2012-08-28
[ 2358 ]
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing � France T�l�com Orange Q13/15 2012-08-28
[ 2357 ]
Development of a new Appendix of G.8261.1 on PDV generation testing � France T�l�com Orange Q13/15 2012-08-28
[ 2356 ]
G.fast: Dynamic BW allocation � Sckipio Technologies S.I. Ltd. Q4A/15 2012-08-28
[ 2355 ]
G.fast: Low Complexity FFT/IFFT Scheme � Telefon AB - LM Ericsson Q4A/15 2012-08-28
[ 2354 ]
G.fast: New cable model for wiring type B05a, CAD55 � Telefon AB - LM Ericsson Q4A/15 2012-08-28
[ 2353 ]
G.fast: Are you willing to give up 6dB of performance gain??? � Sckipio Technologies S.I. Ltd. Q4A/15 2012-08-28
[ 2352 ]
G.fast: Updated measurements and modelling of CAD55 cable � Telefon AB - LM Ericsson Q4A/15 2012-08-28
[ 2351 ]
Scope of Q2, as applies to access vs. OTN � British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT) Q6/15, Q2/15, Q12/15 2012-08-28
[ 2350 ]
G.fast: On the adaptation of the G.998.4 DTU format to G.fast � Sckipio Technologies S.I. Ltd. Q4A/15 2012-08-28
[ 2349 ]
(Rev.1)
Modulation format for 100G in G.698.2 � Deutsche Telekom AG Q6/15 2012-08-28
[ 2348 ]
G.fast: Principle Operations Of Layered Modulation � Alcatel-Lucent Bell N.V. Q4A/15 2012-08-28
[ 2347 ]
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC" � Alcatel-Lucent Bell N.V. Q4A/15 2012-08-28
[ 2346 ]
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure � Alcatel-Lucent Bell N.V. Q4A/15 2012-08-28
[ 2345 ]
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE" � Alcatel-Lucent Bell N.V. Q4A/15 2012-08-28
[ 2344 ]
Consequence of floor delay changes under tight PLL bandwidth � RAD Data Communications, Ltd. Q13/15 2012-08-28
[ 2343 ]
The TVL of Signaling message � Huawei Technologies Co. Ltd. Q13/15 2012-08-28
[ 2342 ]
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications � Italy Q9/15, Q14/15, Q10/15 2012-08-28
[ 2341 ]
The effect of MAC control pause operation for PTP synchronization � Huawei Technologies Co. Ltd. Q13/15 2012-08-28
Results:452 total items.
Result page:� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11