International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-12-05�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG15� TD-WP2�(2011-12-05)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10� 2012-05-11� [ 2011-12-05 ]� 2011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:18 total items.
Temporary Documents �(WP2) �[�AI/Question:�Q17/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 291-WP2 ]
Report of Joint Q5, 16 and 18/15 meeting on the structure of WP2 (Geneva, December 2011) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15 2011-12-14
[ 284-WP2 ]
(Rev.1)
Report of Q17/15 meeting (Geneva, December 2011) � Rapporteur Q17/15 Q17/15 2011-12-14
[ 281-WP2 ]
(Rev.1-2)
Draft study plan of Q17/15 for next study period � Rapporteur Q17/15 Q17/15 2011-12-12
[ 280-WP2 ]
(Rev.1)
oLS: Liaison reply to request for draft revised copy of Recommendation ITU-T L.64 � Editor L.64 Q17/15 2011-12-12
[ 279-WP2 ]
(Rev.1-2)
oLS: Response to iLS: Reply to the Liaison Statement of 25 August 2010 on planned ITU-D handbook on telecommunications outside plant in areas frequently exposed to natural disasters � Rapporteur Q17/15 Q17/15 2011-12-09
[ 275-WP2 ]
Revised draft of new Recommendation ITU-T L.dmosp, "Disaster management for outside plant facilities" � Rapporteur Q17/15 Q17/15 2011-12-09
[ 268-WP2 ]
(Rev.1-2)
Draft agenda of Q17/15 meeting (Geneva, December 2011) � Rapporteur Q17/15 Q17/15 2011-12-07
[ 267-WP2 ]
Revised draft of new Recommendation ITU-T L.omtl � Editor L.omtl Q17/15 2011-12-06
[ 261-WP2 ]
(Rev.1)
Proposed reply from WP2/15 to IEC ACTEL/4/INF on the Draft White Paper "View on Standardization Work in the Area of FTTX/FITH" (TD292/GEN) � Liaison Rapporteur to IEC SC86B Q7/15, Q5/15, Q18/15, Q17/15, Q16/15 2011-12-04
[ 259-WP2 ]
Liaison report from IEC SC86A/WG3 (Optical Fibres Cables) � IEC SC86A Liaison Officer Q18/15, Q17/15, Q16/15 2011-12-03
[ 257-WP2 ]
Draft new Recommendation ITU-T L.gpsm, "Use of the global positioning system (GPS) to create a referenced network map" � Editor L.gpsm Q17/15 2011-12-03
[ 256-WP2 ]
(Rev.1)
Draft revised Recommendation ITU-T L.64 � Editor L.64 Q17/15 2011-11-29
[ 253-WP2 ]
(Rev.1-4)
WP2/15 draft agenda (Geneva, 5-16 December 2011) � Chairman WP2/15 Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15 2011-11-28
[ 252-WP2 ]
Liaison report from IEC SC86A/WG1 (Optical Fibres) � IEC SC86A Liaison Officer Q5/15, Q18/15, Q17/15, Q16/15 2011-11-28
[ 236-WP2 ]
iLS - Request for Draft Revised Copy of L.64 � Broadband Forum Technical Committee Chair Q17/15 2011-10-24
[ 235-WP2 ]
Answers to the Questionnaire on "Use of the global positioning system (GPS) to create a referenced network map" � Editor L.gpsm Q17/15 2011-10-07
[ 234-WP2 ]
iLS: Transfer of several L-series Recommendations from SG15 to SG5 � ITU-T SG5 Q8/15, Q7/15, Q6/15, Q5/15, Q18/15, Q17/15, Q16/15 2011-05-10
[ 233-WP2 ]
iLS: Reply to the Liaison Statement of 25 August 2010 on planned ITU-D handbook on telecommunications outside plant in areas frequently exposed to natural disasters � ITU-D SG2 Q17/15 2011-03-24
Results:18 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25