International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-12-05�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-12-05)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:6 total items.
Contributions �[�Source:�Tellabs Oy�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1924 ]
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL � Tellabs Oy , France T�l�com Orange Q13/15 2011-11-22
[ 1633 ]
(Rev.1)
A shared mesh protection protocol based on hop-by-hop activation � Tellabs Oy Q9/15 2011-11-21
[ 1632 ]
(Rev.1)
A mechanism for active coordination of nested recovery actions � Tellabs Oy Q9/15 2011-11-21
[ 1630 ]
(Rev.1)
Proposed clarification to clause 7.2.4.1.1 in G.873.2 � Tellabs Oy Q9/15 2011-11-21
[ 1629 ]
(Rev.1)
Editorial updates to draft G.873.2 � Tellabs Oy Q9/15 2011-11-21
[ 1627 ]
(Rev.1)
Clarifying OTN maintenance signal interactions in G.798.1 � Tellabs Oy Q9/15 2011-11-21
Results:6 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11