International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-12-05�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-12-05)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:4 total items.
Contributions �[�Source:�AT&T, Inc.�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1723 ]
(Rev.1)
Request for evaluation of OTN support for CPRI � AT&T, Inc. Q13/15 2011-11-21
[ 1722 ]
(Rev.1)
G.798 PT Interworking Smart? � AT&T, Inc. Q9/15 2011-11-21
[ 1697 ]
(Rev.1)
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc. , France T�l�com Orange , Telecom Italia S.p.A. Q4/15 2011-11-21
[ 1567 ]
Principle of Cooperation and Lines of Responsibility � AT&T, Inc. , Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation QALL/15 2011-11-18
Results:4 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11