International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-12-05�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-12-05)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:3 total items.
Contributions �[�AI/Question:�Q7/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1845 ]
Create a new recommendation about "Field Mountable optical fibre Connector" � China Q7/15 2011-11-22
[ 1818 ]
(Rev.1)
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics � Huawei Technologies Co. Ltd. Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15 2011-11-22
[ 1745 ]
(Rev.1)
Parameter Definitions of delay line interferometer of DQPSK in G.671 � ZTE Corporation Q7/15 2011-11-22
Results:3 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11