Contributions
�[�AI/Question:�Q13/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1928 ]
�
� |
Measurement Methods for Phase/Time Clocks
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2011-11-23 |
|
[ 1927 ]
�
� |
PTP and SyncE over OTN-ODU0
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2011-11-23 |
|
[ 1926 ]
�
� |
G.8271: Minor editorial improvements
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2011-11-23 |
|
[ 1925 ]
�
� |
G.8271 1pps interface performance specification
�
� |
Deutsche Telekom AG
,
France T�l�com Orange
� |
Q13/15
� |
2011-11-23 |
|
[ 1924 ]
�
� |
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
�
� |
Tellabs Oy
,
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1916 ]
�
(Rev.1)� |
Parameter proposals for PTP time profile
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2011-11-22 |
|
[ 1915 ]
�
(Rev.1)� |
Proposal to remove Class A/ Class B metric classification from G.8260
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2011-11-22 |
|
[ 1911 ]
�
(Rev.1)� |
G.8263 holdover requirement/squelch
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2011-11-22 |
|
[ 1909 ]
�
(Rev.1-2)� |
PDV tolerance masks for HRM-1 and HRM-2
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q13/15
� |
2011-11-22 |
|
[ 1895 ]
�
� |
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1894 ]
�
� |
G.8271: Editorial comments on latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1893 ]
�
� |
G.8263: Section 9 - PEC-S-F holdover
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1892 ]
�
� |
G.8263: Section 6 - PEC-S-F slave clock noise generation
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1891 ]
�
� |
G.8263: New Appendix discussing time constant values
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1890 ]
�
� |
G.8261.1: Notes on network equipments producing excessive PDV
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1889 ]
�
� |
G.8261.1: Editorial comments on latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1888 ]
�
� |
G.8260: Request for clarification about the MAFE corner point
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1887 ]
�
� |
G.8260: Comments on latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1886 ]
�
� |
Transport of CPRI interface over OTN
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1885 ]
�
� |
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1884 ]
�
� |
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
�
� |
Calnex Solutions Limited
,
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1879 ]
�
� |
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset
�
� |
China Telecommunications Corporation
� |
Q13/15
� |
2011-11-22 |
|
[ 1841 ]
�
� |
Proposal of RS422 1PPS time/phase as a time measurement interface
�
� |
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q13/15
� |
2011-11-22 |
|
[ 1780 ]
�
(Rev.1)� |
Consideration on PTP over OTN solution options
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2011-11-22 |
|
[ 1772 ]
�
(Rev.1)� |
Development of PTP time transport HRMs that encompass OTN
�
� |
Alcatel-Lucent Italia S.p.A.
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-22 |
|
[ 1752 ]
�
(Rev.1)� |
JDSU Time Offset Measurement
�
� |
JDSU Deutschland GmbH
� |
Q13/15
� |
2011-11-22 |
|
[ 1734 ]
�
� |
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-21 |
|
[ 1733 ]
�
� |
Rise time requirements of RS422 1PPS_OUT signal
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-21 |
|
[ 1730 ]
�
� |
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
�
� |
France T�l�com Orange
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1729 ]
�
� |
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
�
� |
France T�l�com Orange
,
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1728 ]
�
� |
Detection and removal of Delay Jumps using FWPR and minMATIE
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-21 |
|
[ 1727 ]
�
� |
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2011-11-21 |
|
[ 1726 ]
�
� |
Criterion for Minimum Detectable Floor Delay Step using minMATIE
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-21 |
|
[ 1725 ]
�
� |
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
�
� |
France T�l�com Orange
,
France T�l�com Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1723 ]
�
(Rev.1)� |
Request for evaluation of OTN support for CPRI
�
� |
AT&T, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1708 ]
�
(Rev.1)� |
Security with Timing as a Managed Service
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1707 ]
�
(Rev.1)� |
Considerations on Packet Rate for the PEC-S-F
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1703 ]
�
(Rev.1)� |
PEC-S-F Output Timing Signals
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1702 ]
�
(Rev.1)� |
Noise Tolerance for the Packet Slave Clock (PEC-S-F)
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1701 ]
�
� |
Synchronization Requirement in OTN
�
� |
China Mobile Communications Corporation
� |
Q13/15, Q11/15
� |
2011-11-21 |
|
[ 1700 ]
�
(Rev.1)� |
Noise Generation for the Packet Slave Clock (PEC-S-F)
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1699 ]
�
� |
The OAM structure and functions requirements for Packet-based synchronization network
�
� |
China Mobile Communications Corporation
� |
Q13/15
� |
2011-11-21 |
|
[ 1696 ]
�
(Rev.1)� |
Testing of Packet Slave Clocks
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1695 ]
�
(Rev.1)� |
Measuring PRTC Accuracy
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1693 ]
�
(Rev.1)� |
Cesium Clock Wander Contribution to Grandmaster Clock Characterization
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1691 ]
�
(Rev.1-2)� |
Testing Packet Slave Clocks using Flicker Noise
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2011-11-21 |
|
[ 1690 ]
�
(Rev.1)� |
Proposal to study the convergence of PON and transport network in the next study period
�
� |
ZTE Corporation
� |
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-11-21 |
|
[ 1689 ]
�
(Rev.1)� |
Proposal to study the convergence of optical and packet in the next study period
�
� |
ZTE Corporation
� |
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
� |
2011-11-21 |
|
[ 1685 ]
�
(Rev.1)� |
G.8273.2: Discussion on text for Sections 6 through 9.
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2011-11-21 |
|
[ 1684 ]
�
(Rev.1)� |
Comments on draft G.8260, Section I.5 'PDV Metrics studying minimum floor delay packet population.'
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2011-11-21 |
Results:90 total items. Result page:�
1 -
2
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):