International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-12-05�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-12-05)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:32 total items.
Contributions �[�AI/Question:�Q11/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1912 ]
Maintaining the common OTN functional model in draft revised G.872 � Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation Q9/15, Q14/15, Q12/15, Q11/15 2011-11-22
[ 1869 ]
(Rev.1)
Proposal for a new recommendation G.wavereuse based on wavelength re-use � Finisar Corporation , LG-Ericsson , Telefon AB - LM Ericsson Q6/15, Q2/15, Q12/15, Q11/15 2011-11-22
[ 1856 ]
Strong FEC for 40 Gbit/s Black Link applications � Deutsche Telekom AG Q11/15 2011-11-22
[ 1855 ]
Rational for new low bit rate interfaces for the OTN � Deutsche Telekom AG Q6/15, Q11/15 2011-11-22
[ 1818 ]
(Rev.1)
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics � Huawei Technologies Co. Ltd. Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15 2011-11-22
[ 1810 ]
(Rev.1)
Comments on the draft G.7044 � Electronics and Telecommunications Research Institute (ETRI) Q11/15 2011-11-22
[ 1807 ]
(Rev.1)
A proposal of the modification for the draft G.7044 � Electronics and Telecommunications Research Institute (ETRI) Q11/15 2011-11-22
[ 1805 ]
(Rev.1)
Introduction of the super timeslots for ODU5 � Huawei Technologies Co. Ltd. Q11/15 2011-11-22
[ 1780 ]
(Rev.1)
Consideration on PTP over OTN solution options � Huawei Technologies Co. Ltd. Q13/15, Q11/15 2011-11-22
[ 1757 ]
(Rev.1)
Consideration on the adaptation of OTU5 over multichannel parallel interfaces � China Unicom , ZTE Corporation Q11/15 2011-11-22
[ 1754 ]
(Rev.1)
Proposal of new recommendation on multi layer converged transport network (G.mlctn) � ZTE Corporation Q9/15, Q14/15, Q12/15, Q11/15, Q10/15 2011-11-22
[ 1753 ]
(Rev.1)
Draft of multi layer converged network informative document � ZTE Corporation Q9/15, Q14/15, Q12/15, Q11/15, Q10/15 2011-11-22
[ 1727 ]
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands � Huawei Technologies Co. Ltd. Q13/15, Q11/15 2011-11-21
[ 1705 ]
Enhanced delay measurement for OTN � Korea (Rep. of) Q11/15 2011-11-21
[ 1701 ]
Synchronization Requirement in OTN � China Mobile Communications Corporation Q13/15, Q11/15 2011-11-21
[ 1690 ]
(Rev.1)
Proposal to study the convergence of PON and transport network in the next study period � ZTE Corporation Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-11-21
[ 1689 ]
(Rev.1)
Proposal to study the convergence of optical and packet in the next study period � ZTE Corporation Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15 2011-11-21
[ 1688 ]
(Rev.1)
Proposal for joint discussion about flexible grid network � ZTE Corporation Q9/15, Q6/15, Q14/15, Q12/15, Q11/15 2011-11-21
[ 1679 ]
(Rev.1)
Considerations for an OTU5/ODU5 definition � ITEK Q11/15 2011-11-21
[ 1675 ]
(Rev.1)
Consideration on client signal mapping for ODU5/OTU5 � Fujitsu Limited Q11/15 2011-11-21
[ 1620 ]
(Rev.1)
Proposal on the 1588v2 over OTN by OSC � FiberHome Technologies Group , ZTE Corporation Q13/15, Q11/15 2011-11-19
[ 1617 ]
Withdrawn: Duplicate of C-1620 �
Withdrawn
FiberHome Technologies Group , ZTE Corporation Q13/15, Q11/15 2011-11-19
[ 1615 ]
(Rev.1)
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20) � Ciena Corporation Q9/15, Q11/15 2011-11-19
[ 1608 ]
(Rev.1)
Considerations for ODU5 � Alcatel-Lucent USA Inc. Q6/15, Q11/15 2011-11-19
[ 1578 ]
(Rev.1)
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR) � PMC-Sierra, Inc. Q11/15 2011-11-18
[ 1577 ]
(Rev.1)
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References � PMC-Sierra, Inc. Q11/15 2011-11-18
[ 1574 ]
(Rev.1)
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach � PMC-Sierra, Inc. Q11/15 2011-11-18
[ 1573 ]
(Rev.1)
Flexible Rate OTU signal � Finisar Corporation , Infinera Corporation , Verizon Communication Corporation Q6/15, Q12/15, Q11/15 2011-11-18
[ 1568 ]
Proposal and Comments on MPLS-TP � Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15 2011-11-18
[ 1541 ]
(Rev.1)
G.7044 impact on G.7713 � Ciena Canada Q14/15, Q11/15 2011-11-17
[ 1520 ]
DOCUMENT WITHDRAWN � Deutsche Telekom Q6/15, Q11/15 2011-08-23
[ 1519 ]
New OTN interfaces in ITU-T G.709 � Deutsche Telekom Q6/15, Q11/15 2011-07-11
Results:32 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25