Contributions
�[�AI/Question:�Q11/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1912 ]
�
� |
Maintaining the common OTN functional model in draft revised G.872
�
� |
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
� |
Q9/15, Q14/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1869 ]
�
(Rev.1)� |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
�
� |
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
� |
Q6/15, Q2/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1856 ]
�
� |
Strong FEC for 40 Gbit/s Black Link applications
�
� |
Deutsche Telekom AG
� |
Q11/15
� |
2011-11-22 |
|
[ 1855 ]
�
� |
Rational for new low bit rate interfaces for the OTN
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2011-11-22 |
|
[ 1818 ]
�
(Rev.1)� |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1810 ]
�
(Rev.1)� |
Comments on the draft G.7044
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q11/15
� |
2011-11-22 |
|
[ 1807 ]
�
(Rev.1)� |
A proposal of the modification for the draft G.7044
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q11/15
� |
2011-11-22 |
|
[ 1805 ]
�
(Rev.1)� |
Introduction of the super timeslots for ODU5
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2011-11-22 |
|
[ 1780 ]
�
(Rev.1)� |
Consideration on PTP over OTN solution options
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2011-11-22 |
|
[ 1757 ]
�
(Rev.1)� |
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
�
� |
China Unicom
,
ZTE Corporation
� |
Q11/15
� |
2011-11-22 |
|
[ 1754 ]
�
(Rev.1)� |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
�
� |
ZTE Corporation
� |
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
� |
2011-11-22 |
|
[ 1753 ]
�
(Rev.1)� |
Draft of multi layer converged network informative document
�
� |
ZTE Corporation
� |
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
� |
2011-11-22 |
|
[ 1727 ]
�
� |
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2011-11-21 |
|
[ 1705 ]
�
� |
Enhanced delay measurement for OTN
�
� |
Korea (Rep. of)
� |
Q11/15
� |
2011-11-21 |
|
[ 1701 ]
�
� |
Synchronization Requirement in OTN
�
� |
China Mobile Communications Corporation
� |
Q13/15, Q11/15
� |
2011-11-21 |
|
[ 1690 ]
�
(Rev.1)� |
Proposal to study the convergence of PON and transport network in the next study period
�
� |
ZTE Corporation
� |
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-11-21 |
|
[ 1689 ]
�
(Rev.1)� |
Proposal to study the convergence of optical and packet in the next study period
�
� |
ZTE Corporation
� |
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
� |
2011-11-21 |
|
[ 1688 ]
�
(Rev.1)� |
Proposal for joint discussion about flexible grid network
�
� |
ZTE Corporation
� |
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2011-11-21 |
|
[ 1679 ]
�
(Rev.1)� |
Considerations for an OTU5/ODU5 definition
�
� |
ITEK
� |
Q11/15
� |
2011-11-21 |
|
[ 1675 ]
�
(Rev.1)� |
Consideration on client signal mapping for ODU5/OTU5
�
� |
Fujitsu Limited
� |
Q11/15
� |
2011-11-21 |
|
[ 1620 ]
�
(Rev.1)� |
Proposal on the 1588v2 over OTN by OSC
�
� |
FiberHome Technologies Group
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2011-11-19 |
|
[ 1617 ]
�
� |
Withdrawn: Duplicate of C-1620
�
Withdrawn
� |
FiberHome Technologies Group
,
ZTE Corporation
� |
Q13/15, Q11/15
� |
2011-11-19 |
|
[ 1615 ]
�
(Rev.1)� |
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)
�
� |
Ciena Corporation
� |
Q9/15, Q11/15
� |
2011-11-19 |
|
[ 1608 ]
�
(Rev.1)� |
Considerations for ODU5
�
� |
Alcatel-Lucent USA Inc.
� |
Q6/15, Q11/15
� |
2011-11-19 |
|
[ 1578 ]
�
(Rev.1)� |
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1577 ]
�
(Rev.1)� |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1574 ]
�
(Rev.1)� |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1573 ]
�
(Rev.1)� |
Flexible Rate OTU signal
�
� |
Finisar Corporation
,
Infinera Corporation
,
Verizon Communication Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2011-11-18 |
|
[ 1568 ]
�
� |
Proposal and Comments on MPLS-TP
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-11-18 |
|
[ 1541 ]
�
(Rev.1)� |
G.7044 impact on G.7713
�
� |
Ciena Canada
� |
Q14/15, Q11/15
� |
2011-11-17 |
|
[ 1520 ]
�
� |
DOCUMENT WITHDRAWN
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2011-08-23 |
|
[ 1519 ]
�
� |
New OTN interfaces in ITU-T G.709
�
� |
Deutsche Telekom
� |
Q6/15, Q11/15
� |
2011-07-11 |
Results:32 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):