International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-02-14�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-02-14)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:25 total items.
Contributions �[�Source:�ZTE�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1348 ]
Proposal for an alternative method for SD detection � ZTE Q9/15 2011-02-01
[ 1347 ]
Comments on aTSF of ETHx in G.8021 � ZTE Q9/15 2011-02-01
[ 1281 ]
Proposed texts for G.smp � ZTE Q9/15 2011-01-31
[ 1280 ]
Automatic Protection Switching (APS) protocol for Shared Mesh Protection � ZTE Q9/15 2011-01-31
[ 1279 ]
Consideration on TS sequence in HAO � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1277 ]
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO � ZTE Q11/15 2011-01-31
[ 1258 ]
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao � ZTE Q14/15, Q12/15, Q11/15 2011-01-31
[ 1257 ]
Propose a latency measurement model of equipment � ZTE Q9/15 2011-01-31
[ 1256 ]
Requirement for communication latency as a traffic engineering performance metric in ASON � ZTE Q14/15, Q12/15 2011-01-31
[ 1235 ]
Proposal on maximum PTP clock number in the time reference model � CMCC , CATR , ZTE Q13/15 2011-01-31
[ 1234 ]
TOD specification � CMCC , CATR , Huawei , ZTE Q13/15 2011-01-31
[ 1233 ]
PTP frequency sync with partial timing support � ZTE Q13/15 2011-01-31
[ 1232 ]
Proposals on the BC simulation model in G.8273 � ZTE Q13/15 2011-01-31
[ 1211 ]
IPv6 related MEs updation for G.988 � ZTE , China MII Q2/15 2011-01-31
[ 1208 ]
(Rev.1)
Non-ERP node in ring (G.8032) � ZTE , China Q9/15 2011-01-31
[ 1207 ]
Support for consent of G.tpoam � ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei Q9/15, Q14/15, Q12/15, Q10/15 2011-01-31
[ 1206 ]
Updated description for multicast preview function in G.988 � ZTE , Huawei Q2/15 2011-01-31
[ 1205 ]
Ignore value setting for attribute Dynamic filtering ageing time of ME MAC bridge service profile in G.988 � ZTE Q2/15 2011-01-31
[ 1151 ]
Wavelength Proposal on TEE to HEE direction in G.sdapp � ZTE Q6/15 2011-01-31
[ 1130 ]
Add topoly usecase in G.8152 � ZTE Corporation Q14/15 2011-01-28
[ 1129 ]
Add topoly support in G.8151 � ZTE Corporation Q14/15 2011-01-28
[ 1119 ]
Standardization of modulation formats � ZTE Corporation Q6/15 2011-01-27
[ 1118 ]
Required information for non-linear effects estimation for Situation 2 of G.680 � ZTE Corporation Q6/15 2011-01-27
[ 1117 ]
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2 � ZTE Corporation Q6/15 2011-01-27
[ 1116 ]
Proposals on granularity of the flexible grids in G.694.1 � ZTE Corporation Q6/15 2011-01-27
Results:25 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25