Contributions
�[�Source:�France�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1459 ]
�
� |
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
�
� |
France Telecom
,
Tellabs
� |
Q13/15
� |
2011-02-02 |
|
[ 1458 ]
�
� |
Network PDV accumulation study with "end-to-end" data traffic model
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1457 ]
�
� |
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1456 ]
�
� |
G.8272: comments on PRTC limits proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1455 ]
�
� |
G.8263: testing methodology for the PDV tolerance of a packet slave clock
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1454 ]
�
� |
G.8261.1: Hypothetical Reference Models proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1453 ]
�
� |
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1452 ]
�
� |
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1451 ]
�
� |
Analysis of phase/time distribution over OTN networks
�
� |
France Telecom
� |
Q9/15, Q13/15, Q11/15
� |
2011-02-02 |
|
[ 1450 ]
�
� |
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1379 ]
�
� |
GPLOAM: LOSS-L, LOSS-LFE and UAS
�
� |
France Telecom Orange
� |
Q4/15
� |
2011-02-01 |
|
[ 1359 ]
�
(Rev.1)� |
Enhancements of the supported G.inp rates for VDSL2 lines operating in conjunction with vectoring
�
� |
Telecom Italia
,
France Telecom Orange
,
Swisscom
,
TNO
� |
Q4/15
� |
2011-02-01 |
|
[ 1342 ]
�
� |
Transparent Clocks in a hop-by-hop time/phase distribution
�
� |
Alcatel-Lucent France
� |
Q13/15
� |
2011-02-01 |
|
[ 1340 ]
�
� |
Time-of-Day distribution across Transport Provider Networks
�
� |
Alcatel-Lucent France
� |
Q13/15
� |
2011-02-01 |
|
[ 1301 ]
�
� |
Operator Requirements for MPLS-TP OAM
�
� |
Verizon
,
BT
,
France Telecom Orange
,
Qwest
,
Telenor
,
Telstra
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-01 |
Results:15 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):