International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-02-14�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-02-14)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:38 total items.
Contributions �[�Source:�Ericsson�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1489 ]
G.vector, G.vdsl, G.hn: Performance Study on Using Linear Precoding (Vectoring) for High Frequency DSL � LM Ericsson AB Q4/15 2011-02-02
[ 1406 ]
OMCI Tip-Ring Test Result for POTS UNI � A.T. Communication Channels , Ericsson Q2/15 2011-02-01
[ 1405 ]
OMCI updates for Vendor-specific Test Parameters � A.T. Communication Channels , Ericsson Q2/15 2011-02-01
[ 1404 ]
Enabling variable message length in extended message format � A.T. Communication Channels , Alcatel-Lucent , Ericsson Q2/15 2011-02-01
[ 1400 ]
Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network � Ericsson Q13/15 2011-02-01
[ 1382 ]
G.8032 Appendix XI � Ericsson Q9/15 2011-02-01
[ 1373 ]
Comments on content of Clauses 8 and 9 of G.tpoam � Ericsson Q9/15 2011-02-01
[ 1370 ]
Comments on working assumption at Berlin meeting and TD377 (wd31r1) � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q9/15, Q12/15, Q10/15 2011-02-01
[ 1365 ]
Status of IETF OAM tools for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1341 ]
Considerations on the use of the IEEE1588 Transparent Clock in the Time Sync Architectures (G.8275) � Ericsson Q13/15 2011-02-01
[ 1339 ]
Fulfilling the OAM Requirements for MPLS-TP � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1337 ]
Discussion on Architecture and BMCA for the Time Sync Telecom Profile (G.8275 and G.8275.1) � Ericsson Q13/15 2011-02-01
[ 1336 ]
Time and Phase Sync Interfaces (G.8271) � Ericsson Q13/15 2011-02-01
[ 1335 ]
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1) � Ericsson Q13/15 2011-02-01
[ 1304 ]
Proposed text for G.tpoam � Cisco , BT , Ericsson , Juniper , NSN , Qwest , Telenor , Verizon Q10/15 2011-02-01
[ 1270 ]
Proposal for OMCI in EPON � Mitsubishi , Ericsson , Hitachi , NTT Q2/15 2011-01-31
[ 1174 ]
Evolution of G.8011 Ethernet Services � Ericsson Canada Q12/15, Q10/15 2011-01-31
[ 1173 ]
G.8032 Appendix � Ericsson Canada Q9/15 2011-01-31
[ 1172 ]
RingID for identifying R-APS � Ericsson Canada Q9/15 2011-01-31
[ 1171 ]
Comments on G.8010 Amendment 2 � Ericsson Canada Q9/15, Q12/15 2011-01-31
[ 1170 ]
1:1 path protection capable of load sharing for G.8031 � Ericsson Canada Q9/15 2011-01-31
[ 1169 ]
Proposal to align G.8021 with IEEE 802.1Q ingress VID filtering � Ericsson Canada Q9/15, Q12/15 2011-01-31
[ 1167 ]
PBB model for G.8021 & G.8010 � Ericsson Canada Q9/15, Q14/15, Q12/15 2011-01-31
[ 1165 ]
MPLS and Y.1731 � Ericsson Canada Q10/15 2011-01-31
[ 1140 ]
Proposal for G.sdapp transmitter and receiver parameters � LG-Ericsson Q6/15 2011-01-28
[ 1139 ]
Proposal for G.sdapp general parameters and optical path parameters � LG-Ericsson Q6/15 2011-01-28
[ 1138 ]
Some parameter definitions for G.sdapp � LG-Ericsson Q6/15 2011-01-28
[ 1137 ]
Cross talk penalty calculations for G.sdapp � LG-Ericsson Q6/15 2011-01-28
[ 1136 ]
Commonalities of G.sdapp frequency grid proposals � LG-Ericsson Q6/15 2011-01-28
[ 1135 ]
Impairments in seeded DWDM Systems � LG-Ericsson Q6/15 2011-01-28
[ 1134 ]
Revised Clause 6.1 in G.8271 � Ericsson Q13/15 2011-01-28
[ 1128 ]
Proposal to support logical ONU ID in G.988 � China Telecom, Ericsson, Huawei Q2/15 2011-01-28
[ 1127 ]
(Rev.1)
Proposal to define IPv6 host config ME in G.988 � Ericsson, AT&T, Alcatel-Lucent Q2/15 2011-01-28
[ 1122 ]
Protection of blinking failures � Ericsson Q9/15 2011-01-27
[ 1121 ]
Addition of Subcarrier Multiplexing (SCM) as one of the line coding schemes in section 7 of G.Sup39 � Ericsson Q6/15 2011-01-27
[ 1120 ]
Fiber link asymmetry compensation � Ericsson Q6/15, Q13/15 2011-01-27
[ 1113 ]
(Rev.1)
Comments on content of clauses 8 and 9 of G.tpoam � Ericsson Q9/15 2011-01-26
[ 1104 ]
Further consideration of the adaptive Bandwidth Adjustment scheme � Ericsson Q9/15, Q10/15 2011-01-25
Results:38 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11