International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-02-14�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-02-14)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:119 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Contributions �[�AI/Question:�Q9/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1518 ]
Structuring of MPLS-TP Recommendations � Telef�nica Investigaci�n y Desarrollo Q9/15, Q14/15, Q12/15, Q10/15 2011-02-11
[ 1507 ]
Proposed text for protection path status update in G.smp � Huawei , Telefonica Investigacion y Desarrollo Q9/15 2011-02-02
[ 1506 ]
Proposed text for gsmp � Huawei , Telefonica Investigacion y Desarrollo Q9/15 2011-02-02
[ 1505 ]
(Rev.1)
Proposed functional model for g.smp � Huawei , Telefonica Investigacion y Desarrollo Q9/15 2011-02-02
[ 1504 ]
Proposal of ODU Shared Mesh Protection � Huawei , Telefonica Investigacion y Desarrollo Q9/15 2011-02-02
[ 1500 ]
Proposal on ACL-SNCG/I for adaptive bandwidth in G.808.1 � Huawei Q9/15 2011-02-02
[ 1499 ]
Requirement summary for adaptive bandwidth in packet network � Huawei Q9/15, Q10/15 2011-02-02
[ 1498 ]
Equipment models to support IEEE 1588 � Huawei Q9/15 2011-02-02
[ 1492 ]
G.8032 ( Encoding Ring Identifier in R-APS Message DA to Improve Network Scaling � Ciena Corporation Q9/15 2011-02-02
[ 1461 ]
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications" � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1451 ]
Analysis of phase/time distribution over OTN networks � France Telecom Q9/15, Q13/15, Q11/15 2011-02-02
[ 1447 ]
Proposal for additional delay measurement functions in MPLS-TP OAM � NTT Q9/15, Q14/15, Q10/15 2011-02-02
[ 1445 ]
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions � ISOC Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1441 ]
Withdrawn: MPLS-TP Standards � BT Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1440 ]
Second generation ETH MEP and MIP functions � Huawei Q9/15 2011-02-02
[ 1439 ]
Comments on differentiation of MPLS-TP environments � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1420 ]
Functional model of HAO � Huawei Q9/15, Q11/15 2011-02-01
[ 1416 ]
Modifications for draft G.798.1 (TD 379/P) � ETRI Q9/15 2011-02-01
[ 1415 ]
Proposed modification on OTM-0.mvn in G.798 � ETRI Q9/15 2011-02-01
[ 1401 ]
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN) � NTT Q9/15, Q11/15 2011-02-01
[ 1392 ]
BBER objectives in Recommendation G.8201 � Deutsche Telekom Q9/15 2011-02-01
[ 1389 ]
Proposal to extend the text in clause 5 of G.806 � Huawei Q9/15 2011-02-01
[ 1384 ]
Structure and content of the MPLS-TP Recommendations � Telecom Italia Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1382 ]
G.8032 Appendix XI � Ericsson Q9/15 2011-02-01
[ 1378 ]
ODUflex(GFP) Recommended Bit Rates � Alcatel-Lucent Q9/15, Q11/15 2011-02-01
[ 1377 ]
Proposed text for inclusion in G.8021 for Frame Loss Measurement � Huawei , China Mobile Communication Corporation Q9/15, Q10/15 2011-02-01
[ 1375 ]
(Rev.1)
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032 � NTT , NSN Q9/15 2011-02-01
[ 1373 ]
Comments on content of Clauses 8 and 9 of G.tpoam � Ericsson Q9/15 2011-02-01
[ 1372 ]
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks � Israel Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1370 ]
Comments on working assumption at Berlin meeting and TD377 (wd31r1) � NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon Q9/15, Q12/15, Q10/15 2011-02-01
[ 1369 ]
Automatic Protection Switching (APS) for packet networks in G.smp � ETRI , SK Telecom Q9/15 2011-02-01
[ 1368 ]
Principle of APS protocol operation for MPLS-TP linear protection switching � ETRI Q9/15 2011-02-01
[ 1367 ]
Comments on consent of G.ptneq � NSN Q9/15 2011-02-01
[ 1366 ]
Adding dFOP-TO to G.8032 � NSN , NTT Q9/15 2011-02-01
[ 1362 ]
Support for the consent of G.8110.1 and G.tpoam � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1361 ]
Structure of the MPLS-TP Recommendations � SK Telecom , ETRI Q9/15, Q14/15, Q12/15, Q10/15 2011-02-01
[ 1348 ]
Proposal for an alternative method for SD detection � ZTE Q9/15 2011-02-01
[ 1347 ]
Comments on aTSF of ETHx in G.8021 � ZTE Q9/15 2011-02-01
[ 1346 ]
Nested Restoration Domains - Data-plane maintenance overhead signals � Tellabs Oy Q9/15, Q12/15, Q11/15 2011-02-01
[ 1334 ]
Definition of dFOP-TO defect for Ethernet linear protection switching � Tellabs Oy Q9/15 2011-02-01
[ 1333 ]
Clarifying ODUk TCM maintenance signalling behaviour � Tellabs Oy Q9/15 2011-02-01
[ 1332 ]
Proposed clarification of atomic functions for mapping gigabit Ethernet into ODU0 � Tellabs Oy Q9/15 2011-02-01
[ 1331 ]
Proposed material for G.873.1 Appendix II on OTN client protection � Tellabs Oy Q9/15 2011-02-01
[ 1330 ]
Identifiers for ODUk protection protocols � Tellabs Oy Q9/15 2011-02-01
[ 1329 ]
Rationale for support of 1SL in Y.1731 and G.8021 � AT&T , Verizon Q9/15, Q10/15 2011-02-01
[ 1328 ]
Proposed text for G.8021 specification of dFOP-TO for G.8032 � Alcatel-Lucent USA , Aim Valley BV , NSN Germany Q9/15 2011-02-01
[ 1327 ]
Proposal to define MI for G-Ach packets � Fujitsu , Hitachi , NEC Q9/15, Q14/15, Q10/15 2011-02-01
[ 1325 ]
Proposal to define Generic Notification message for ETH-OAM and Consideration on its application � Fujitsu Q9/15, Q10/15 2011-02-01
[ 1324 ]
Proposal to re-define the architectures for MPLS-TP linear protection � Fujitsu Q9/15, Q12/15 2011-02-01
[ 1323 ]
Proposed text to update clause 10 in G.8121 � Fujitsu Q9/15, Q14/15 2011-02-01
Results:119 total items.
Result page:� 1 - 2 - 3 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25