International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2010-05-31�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2010-05-31)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-01-152009-09-282009-05-152008-12-01

Results:25 total items.
Contributions �[�Source:�ZTE�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1070 ]
1588v2 transmission by OSC over OTN � FiberHome , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1066 ]
Analysis of time synchronization performance using PTP in hybrid transport network � CMCC , CATR , ZTE Q13/15, Q11/15 2010-05-21
[ 1065 ]
Proposal of accelerating MTIE and TDEV mask study for time synchronization � CMCC , CATR , Huawei , ZTE Q13/15 2010-05-21
[ 1064 ]
Proposal of research on link asymmetry compensation for PTP � CMCC, ZTE, CATR Q13/15 2010-05-21
[ 1063 ]
Network limits reference model for time sync accuracy � CMCC , ZTE Q13/15 2010-05-21
[ 1044 ]
Proposal for ring topology discovery � ZTE Q14/15 2010-05-20
[ 1043 ]
Scenarios of mpls-tp discovery � ZTE Q14/15 2010-05-20
[ 1042 ]
Architecture of time synchronization using packet based method in G.8275 � ZTE , CMCC Q13/15 2010-05-20
[ 1041 ]
Issues about metrics of network limits for time synchronization � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1040 ]
Field test of 1588v2 time sync based on physical layer frequency sync support � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1039 ]
Definition related to time/phase sync in G.8260 � ZTE , CMCC Q13/15 2010-05-20
[ 1038 ]
Performance analysis of 1588v2 time/sync in field test � ZTE , CMCC Q13/15 2010-05-20
[ 1037 ]
1588v2 test results with different clock mode and field network � ZTE , CATR , CMCC Q13/15 2010-05-20
[ 1036 ]
(Rev.1)
Consideration on Phase/Time synchronization over OTN � ZTE Q13/15, Q11/15 2010-05-20
[ 1035 ]
Proposal of Misconnection in Ring Protection � ZTE Q9/15 2010-05-20
[ 1034 ]
Consideration on LO ODUk Ring Protection � ZTE Q9/15 2010-05-20
[ 1033 ]
Comments on draft of G.ptneq generics � ZTE Q9/15 2010-05-20
[ 1032 ]
DNF at NR messages (G.8032) � ZTE Q9/15 2010-05-20
[ 1031 ]
SD scenarios (G.8031) � ZTE Q9/15 2010-05-20
[ 1030 ]
SD detection in G.8031 � ZTE Q9/15 2010-05-20
[ 1029 ]
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39 � ZTE Q6/15 2010-05-20
[ 1028 ]
Filter phase ripple discussion for G.680 � ZTE Q6/15 2010-05-20
[ 1027 ]
IPv6 Multicast filter � ZTE Q2/15 2010-05-20
[ 1026 ]
Proposal for Combo Reach Extender (CRE) device for G.987.re � ZTE Q2/15 2010-05-20
[ 825 ]
Requirement for multi stages multiplex/demultiplex configuration � China Telecom , China Mobile , China Unicom , ZTE Q9/15, Q14/15, Q12/15 2010-05-17
Results:25 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11