Contributions
�[�Source:�ZTE�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1070 ]
�
� |
1588v2 transmission by OSC over OTN
�
� |
FiberHome
,
CATR
,
ZTE
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1066 ]
�
� |
Analysis of time synchronization performance using PTP in hybrid transport network
�
� |
CMCC
,
CATR
,
ZTE
� |
Q13/15, Q11/15
� |
2010-05-21 |
|
[ 1065 ]
�
� |
Proposal of accelerating MTIE and TDEV mask study for time synchronization
�
� |
CMCC
,
CATR
,
Huawei
,
ZTE
� |
Q13/15
� |
2010-05-21 |
|
[ 1064 ]
�
� |
Proposal of research on link asymmetry compensation for PTP
�
� |
CMCC, ZTE, CATR
� |
Q13/15
� |
2010-05-21 |
|
[ 1063 ]
�
� |
Network limits reference model for time sync accuracy
�
� |
CMCC
,
ZTE
� |
Q13/15
� |
2010-05-21 |
|
[ 1044 ]
�
� |
Proposal for ring topology discovery
�
� |
ZTE
� |
Q14/15
� |
2010-05-20 |
|
[ 1043 ]
�
� |
Scenarios of mpls-tp discovery
�
� |
ZTE
� |
Q14/15
� |
2010-05-20 |
|
[ 1042 ]
�
� |
Architecture of time synchronization using packet based method in G.8275
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1041 ]
�
� |
Issues about metrics of network limits for time synchronization
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1040 ]
�
� |
Field test of 1588v2 time sync based on physical layer frequency sync support
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1039 ]
�
� |
Definition related to time/phase sync in G.8260
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1038 ]
�
� |
Performance analysis of 1588v2 time/sync in field test
�
� |
ZTE
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1037 ]
�
� |
1588v2 test results with different clock mode and field network
�
� |
ZTE
,
CATR
,
CMCC
� |
Q13/15
� |
2010-05-20 |
|
[ 1036 ]
�
(Rev.1)� |
Consideration on Phase/Time synchronization over OTN
�
� |
ZTE
� |
Q13/15, Q11/15
� |
2010-05-20 |
|
[ 1035 ]
�
� |
Proposal of Misconnection in Ring Protection
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1034 ]
�
� |
Consideration on LO ODUk Ring Protection
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1033 ]
�
� |
Comments on draft of G.ptneq generics
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1032 ]
�
� |
DNF at NR messages (G.8032)
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1031 ]
�
� |
SD scenarios (G.8031)
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1030 ]
�
� |
SD detection in G.8031
�
� |
ZTE
� |
Q9/15
� |
2010-05-20 |
|
[ 1029 ]
�
� |
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39
�
� |
ZTE
� |
Q6/15
� |
2010-05-20 |
|
[ 1028 ]
�
� |
Filter phase ripple discussion for G.680
�
� |
ZTE
� |
Q6/15
� |
2010-05-20 |
|
[ 1027 ]
�
� |
IPv6 Multicast filter
�
� |
ZTE
� |
Q2/15
� |
2010-05-20 |
|
[ 1026 ]
�
� |
Proposal for Combo Reach Extender (CRE) device for G.987.re
�
� |
ZTE
� |
Q2/15
� |
2010-05-20 |
|
[ 825 ]
�
� |
Requirement for multi stages multiplex/demultiplex configuration
�
� |
China Telecom
,
China Mobile
,
China Unicom
,
ZTE
� |
Q9/15, Q14/15, Q12/15
� |
2010-05-17 |
Results:25 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):