International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2010-05-31�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2010-05-31)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-01-152009-09-282009-05-152008-12-01

Results:15 total items.
Contributions �[�Source:�China�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 1094 ]
The revised edition of proposed applications in G.959.1 � China Unicom Network Communications Group Company Q6/15 2010-05-21
[ 1083 ]
Proposal of the architecture of gsmp � Telefonica Investigacion y Desarrollo , China Unicom , Huawei Q9/15 2010-05-21
[ 1082 ]
Discussion on APS of Shared Mesh Protection � Telefonica Investigacion y Desarrollo , China Unicom , Huawei Q9/15 2010-05-21
[ 1045 ]
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links � Huawei , China Telecom , MIIT Q4/15 2010-05-20
[ 903 ]
Pulse-Per-Second Interface � Huawei , CATR , China Mobile Communications Corporation , MII Q13/15 2010-05-18
[ 897 ]
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks � Huawei , China Mobile Communications Corporation Q13/15 2010-05-18
[ 896 ]
The use of SyncE and IEEE1588v2 for Time Distribution � Huawei , China Mobile Communications Corporation Q13/15 2010-05-18
[ 845 ]
An Approach to Include OTN interfaces in Optical Fibre Submarine Cable Systems � China Unicom Q8/15 2010-05-17
[ 829 ]
Considerations about MPLS-TP OAM requirement and mechanisms � China Unicom Q9/15, Q10/15 2010-05-22
[ 828 ]
Proposal to Add Protection with Dual-homing Sink Nodes in G.ptneq � China United Network Communications Group Company Q9/15 2010-05-17
[ 827 ]
Protection switching in G.ptneq � China Unicom,China Mobile, China <Academy> of Tele Q9/15 2010-05-17
[ 826 ]
Discussion on MPLS-TP OAM mechanisms � China Telecom Q10/15 2010-05-17
[ 825 ]
Requirement for multi stages multiplex/demultiplex configuration � China Telecom , China Mobile , China Unicom , ZTE Q9/15, Q14/15, Q12/15 2010-05-17
[ 823 ]
Propose to add an appendix to describe EVPRM solution to G.8011.4 � Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China Q10/15 2010-05-17
[ 822 ]
Proposals about MPLS-TP OAM mechanisms � China Mobile Q10/15 2010-05-17
Results:15 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26