International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2009-09-28�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2009-09-28)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-05-152008-12-01

Results:24 total items.
Contributions �[�Source:�ZTE�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 601 ]
Time distribution model using 1588v2 for performance indication � CMCC , ZTE Corporation Q13/15 2009-09-18
[ 600 ]
Proposal on time interface specification � CMCC , ZTE Corporation Q13/15 2009-09-18
[ 599 ]
Test and analysis of time synchronization using 1588v2 for transport network � CMCC , ZTE Corporation Q13/15 2009-09-18
[ 590 ]
Relativity Issue of Spectral Excursion & Maximum Ripple � ZTE Corporation Q6/15 2009-09-18
[ 589 ]
Proposal of Additional PT � ZTE Corporation Q11/15 2009-09-18
[ 588 ]
Proposal for avoiding re-flushing (G.8032) � ZTE Corporation Q9/15 2009-09-18
[ 587 ]
Further consideration about subnetwork blocking resource management in G.8080 � ZTE Corporation Q12/15 2009-09-18
[ 586 ]
Consideration on ODUflex resizing � ZTE Corporation Q14/15, Q12/15, Q11/15 2009-09-18
[ 585 ]
Consideration on fast OPUk Client Signal Fail (CSF) � ZTE Corporation , CMCC , NSN Q11/15 2009-09-18
[ 584 ]
Solution to backward compatibility logic problem in G.8032v2 (G.8032) � ZTE Corporation Q9/15 2009-09-18
[ 583 ]
Proposals to consider resource sharing in G.8080 � ZTE Corporation Q12/15 2009-09-18
[ 582 ]
Proposal for ring protection information discovering in ASTN � ZTE Corporation Q14/15 2009-09-18
[ 581 ]
Proposal for adding some contents in appendix of G.696.1 � ZTE Corporation Q6/15 2009-09-18
[ 580 ]
Considerations on use of P2P TC in 1588v2 telecom profile for phase/time sync � ZTE Corporation , Nokia Siemens Networks Q13/15 2009-09-18
[ 579 ]
Consideration on maximum spectral excursion for 10G_50GHz in G.698.2 � ZTE Corporation Q6/15 2009-09-18
[ 578 ]
Comments on blocking the both ends of RPL (G.8032) � ZTE Corporation Q9/15 2009-09-18
[ 557 ]
Description & implementation examples for a WDM1r with dedicated OTDR and RF video ports � ZTE Corporation Q2/15 2009-09-18
[ 556 ]
Description & implementation examples for a WDM1r with a dedicated OTDR port � ZTE Corporation Q2/15 2009-09-18
[ 404 ]
Propose to add Link discover Process based on OAM in G.8051 � ZTE Corporation Q14/15 2009-09-15
[ 403 ]
Propose to add requirement of MAC topology management � ZTE Corporation Q14/15 2009-09-15
[ 402 ]
Propose to add MAC Link discover support in G.8051 � ZTE Corporation Q14/15 2009-09-15
[ 401 ]
Propose to add requirement of discovery support on MPLS-TP OAM Requirement � ZTE Corporation Q14/15, Q12/15 2009-09-15
[ 400 ]
Propose to add requirement of discovery support on MPLS-TP NM Requirement � ZTE Corporation Q14/15, Q12/15 2009-09-15
[ 386 ]
(Rev.1)
G.int: Improve the transportation efficiency of the payload in ATM cells � ZTE Corporation Q4/15 2009-09-14
Results:24 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11