International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2009-09-28�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2009-09-28)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-05-152008-12-01

Results:52 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�Source:�Huawei�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 745 ]
Supporting a broadband backhaul application in the PTN � Huawei Technologies Q9/15 2009-09-22
[ 712 ]
G.vector: Proposed way forward on the issue of FDM pilots � Huawei Technologies , MII Q4/15 2009-09-20
[ 711 ]
G.vector: On Error Sample Quantization Format � Huawei Technologies , MII Q4/15 2009-09-20
[ 710 ]
G.vector: Line Stability after a Disorderly Leaving Event � Huawei Technologies , MII Q4/15 2009-09-20
[ 709 ]
MEs for TDM pseudowire over MPLS � Huawei technologies Q2/15 2009-09-20
[ 708 ]
A Nested PON Architecture � Huawei technologies Q2/15 2009-09-20
[ 707 ]
N:1 Protection for Long Reach GPON � Huawei technologies Q2/15 2009-09-20
[ 706 ]
Unicast Message Negotiation - Timing Diagram � Huawei Technologies Q13/15 2009-09-20
[ 705 ]
Unicast Message Negotiation - Multiple TLVs � Huawei Technologies Q13/15 2009-09-20
[ 704 ]
Discussion on clockIdentity format for ITU's IEEE1588 Telecom Profile � Huawei Technologies Q13/15 2009-09-20
[ 703 ]
G.8264.1 - Editorial comments/changes � Huawei Technologies Q13/15 2009-09-20
[ 702 ]
Description of Transparency in G.800 � Huawei Technologies Q12/15 2009-09-20
[ 701 ]
Proposal to define ATM, FR, PPP, HDLC, SDH over Ethernet mappings � Huawei Technologies Q9/15, Q10/15 2009-09-20
[ 700 ]
Proposal on Ring Protection � Huawei Technologies Q9/15 2009-09-20
[ 699 ]
Proposal on PTN Equipment Types � Huawei Technologies Q9/15 2009-09-20
[ 698 ]
Proposal on MVC and EVC in G.ptneq � Huawei Technologies Q9/15 2009-09-20
[ 697 ]
Extension of APS for Generic Dual Node Interconnection Protection � Huawei Technologies Q9/15 2009-09-20
[ 696 ]
Supervisory system for optical fibre submarine cable systems � Huawei Technologies Q8/15 2009-09-20
[ 695 ]
Introduce OTN interface into Optical Submarine Cable Systems � Huawei Technologies , China Unicom Q8/15 2009-09-20
[ 694 ]
Definition of COTDR parameters � Huawei Technologies Q8/15 2009-09-20
[ 693 ]
Proposal for 10G bitrate submarine optical signal � Huawei Technologies Q8/15 2009-09-20
[ 692 ]
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2 � Huawei Technologies Q6/15 2009-09-20
[ 691 ]
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission � Huawei Technologies Q6/15 2009-09-20
[ 690 ]
Proposal on the state machine and APS PDU in G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 689 ]
Proposal on ACL-SNCG/I protection switching for microwave network in G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 688 ]
Proposal on extending linear protection switching for variable link in G.808.1 � Huawei Technologies 9/15 2009-09-20
[ 687 ]
QL to clockClass mapping � Huawei Technologies , France Telecom Orange Q13/15 2009-09-20
[ 686 ]
Discussion of G.8264.1 Message Forwarding Behaviour � Huawei Technologies Q13/15 2009-09-20
[ 685 ]
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates � Huawei Technologies , CATR , MII Q13/15 2009-09-20
[ 684 ]
(Rev.1)
Proposal on adding bandwidth notification function in G.808.1 and G.8031 � Huawei Technologies Q9/15 2009-09-20
[ 683 ]
G.800 Transport Entities � Huawei Technologies Q12/15 2009-09-20
[ 572 ]
ODUflex hitless resizing method � Huawei Technologies , China Mobile Communications Corp Q9/15, Q11/15 2009-09-18
[ 569 ]
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4 � Huawei Technologies Q2/15 2009-09-18
[ 568 ]
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4 � Huawei Technologies Q2/15 2009-09-18
[ 533 ]
HO and LO ODUk Shared Ring Protection (SRP) � Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation Q9/15 2009-09-18
[ 505 ]
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 504 ]
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 502 ]
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 501 ]
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses � Huawei Technologies Q13/15, Q11/15 2009-09-17
[ 471 ]
CPRI over OTN requirement � China Telecom , Huawei Q11/15 2009-09-16
[ 454 ]
Proposal to study Shared Mesh Protection � Huawei Technologies , CATR , MII Q9/15 2009-09-16
[ 453 ]
Considerations on the description of the ODU layer network in G.872 and G.8080 � Huawei Technologies Q14/15, Q12/15 2009-09-16
[ 452 ]
Transfer delay for FC over OTN � Huawei Technologies Q11/15 2009-09-16
[ 445 ]
Management of high capacity connections in the OTN � Huawei Technologies Q12/15 2009-09-16
[ 443 ]
Text proposal to align clause 9/G.872 with draft revised G.709 � Huawei Technologies Q12/15 2009-09-16
[ 441 ]
GPON over OTN mapping � Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra Q2/15, Q11/15 2009-09-16
[ 440 ]
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access � Huawei Technologies Q9/15 2009-09-16
[ 439 ]
Text proposal for clause 8/G.798.1 � Huawei Technologies Q9/15 2009-09-16
[ 438 ]
Proposal to specify OCh/OTUkV_A with OTUk_CP � Huawei Technologies Q9/15, Q11/15 2009-09-16
[ 437 ]
Multi-vendor demarcation in the OTN � Huawei Technologies Q9/15, Q11/15 2009-09-16
Results:52 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11