Contributions
�[�Source:�Alcatel-Lucent�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 717 ]
�
� |
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2009-09-20 |
|
[ 716 ]
�
� |
Proposal to update the descriptions of non-linear effects at G.663 Appendix II
�
� |
Alcatel-Lucent
� |
Q7/15
� |
2009-09-20 |
|
[ 715 ]
�
� |
Proposal to update the descriptions of non-linear fibre impairments at clause 9 of sup39
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2009-09-20 |
|
[ 714 ]
�
� |
Proposal to update Fig. I.1 of G.696.1 taking nonlinear effects into account on OSNR limitations versus number of spans
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2009-09-20 |
|
[ 713 ]
�
� |
Proposal to update G.691 application tables with dispersion values for G.653 fibres
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2009-09-20 |
|
[ 634 ]
�
� |
G.gen: G.vector: G.vdsl: G.hs: Operation of a legacy G.993.2 VTU-R in a vectoring group
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 633 ]
�
� |
G.vector: VLAN identifier for L2 backchannel
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 632 ]
�
� |
G.inp: On defining the BER / MTBE working point in retransmission
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 631 ]
�
� |
G.vector: Periodicity for frequency dependent pilot sequences
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 630 ]
�
� |
G.vector: Unification and simplification of error block schemes.
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 629 ]
�
� |
G.inp: Receiver Delay Equalisation and Timestamps
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 628 ]
�
� |
G.inp: Working Text Update of Annex D (Support of G.inp in G.997.1)
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 627 ]
�
� |
G.ploam: LATN and SATN corrigendum
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2009-09-20 |
|
[ 525 ]
�
� |
MAC Operations using Y.1731 PDU
�
� |
Alcatel-Lucent USA
,
Verizon
� |
Q10/15
� |
2009-09-18 |
|
[ 524 ]
�
� |
Proposal to determine BS/GS based on near-end information in G.8021
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 523 ]
�
� |
Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 522 ]
�
� |
G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 521 ]
�
� |
G.8031 state transition when WTR timers differ at both ends
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 520 ]
�
� |
G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 519 ]
�
� |
G.8031 state transitions when working recovers from SF
�
� |
Alcatel-Lucent USA
,
Alcatel-Lucent Shanghai Bell
� |
Q9/15
� |
2009-09-18 |
|
[ 518 ]
�
� |
Maintaining the independence of the two ring interconnection options in G.8032v2
�
� |
Alcatel-Lucent USA
� |
Q9/15
� |
2009-09-18 |
|
[ 516 ]
�
� |
Proposal to rename the "RPL Node" in G.8032v2
�
� |
Alcatel-Lucent USA
� |
Q9/15
� |
2009-09-18 |
|
[ 514 ]
�
� |
Proposal to review and update G.8032 Study Points and Living List
�
� |
Alcatel-Lucent USA
� |
Q9/15
� |
2009-09-18 |
|
[ 512 ]
�
� |
Proposed modifications to G.8021 and G.8032 for R-APS-specific dFOP-PM and dFOP-TO
�
� |
Alcatel-Lucent USA, AimValley BV
� |
Q9/15
� |
2009-09-17 |
|
[ 482 ]
�
� |
Delivery of Frequency and Time Synchronization via PTP instances
�
� |
Alcatel-Lucent
� |
Q13/15
� |
2009-09-17 |
|
[ 428 ]
�
� |
Additional requirements for G.7718
�
� |
Alcatel-Lucent
,
NTT
� |
Q14/15
� |
2009-09-16 |
|
[ 407 ]
�
� |
Mapping of 100GBASE-R into OPU4
�
� |
Alcatel-Lucent
� |
Q11/15
� |
2009-09-15 |
|
[ 406 ]
�
� |
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4
�
� |
Alcatel-Lucent
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 405 ]
�
� |
Adaptation of STM-256 over multichannel parallel interfaces
�
� |
Alcatel-Lucent
,
Cisco
,
Finisar
,
Juniper
� |
Q9/15, Q11/15
� |
2009-09-15 |
|
[ 399 ]
�
� |
CSF Indication for Y.1731 (Ethernet OAM)
�
� |
Alcatel-Lucent
� |
Q9/15, Q10/15
� |
2009-09-15 |
|
[ 383 ]
�
� |
Failure and probable cause mapping for G.7710
�
� |
Alcatel-Lucent
� |
Q14/15
� |
2009-09-14 |
|
[ 382 ]
�
� |
Automatic control of the ODUkT TCM control function
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2009-09-14 |
|
[ 381 ]
�
� |
Comments on draft Revision of Rec. G.7713
�
� |
Alcatel-Lucent
� |
Q14/15
� |
2009-09-14 |
Results:33 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):