International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2008-12-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2008-12-01)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-15

Results:20 total items.
Contributions �[�Source:�ZTE�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 314 ]
G.int: Proposal for Next-Generation LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 309 ]
G.int: Comments on LINK/PHY Interface � MII, China, Huawei, ZTE Q4/15 2008-11-25
[ 299 ]
Proposal on automatic discovery requirements in WDM network in G.7714.1 � ZTE Corporation Q14/15 2008-11-23
[ 298 ]
Clarifications on Key Management in GPON System � ZTE Corporation Q2/15 2008-11-23
[ 297 ]
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync � ZTE Corporation Q13/15 2008-11-23
[ 296 ]
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265 � ZTE Corporation, CATR MII Q13/15 2008-11-23
[ 295 ]
(Rev.1)
Proposal to consider node resource management in G.8080 for WSON � ZTE Corporation Q12/15 2008-11-23
[ 294 ]
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 293 ]
Flushing behaviour in interconnected ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 292 ]
FDB Flush Problem in non_revertive operation � ZTE Corporation, China Q9/15 2008-11-23
[ 291 ]
Difference between sub-ring and single ring protection (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 290 ]
Comparison between shared-link and sub-ring models (G.8032) � ZTE Corporation, China Q9/15 2008-11-23
[ 289 ]
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission � ZTE Corporation Q6/15 2008-11-23
[ 288 ]
Proposals on optical attenuator parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 287 ]
Proposal on PDL and PMD parameters in G.671 � ZTE Corporation, China Q7/15 2008-11-23
[ 286 ]
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713 � ZTE Corporation Q14/15 2008-11-23
[ 285 ]
Comments to G.8152 � ZTE Corporation Q14/15 2008-11-23
[ 284 ]
Comments to G.8052 � ZTE Corporation Q14/15 2008-11-23
[ 283 ]
Add "central frequency deviation" parameter for transmitter in G.698.2 � ZTE Q6/15 2008-11-23
[ 271 ]
Restoration exercise � ZTE Corporation Q14/15, Q12/15 2008-11-23
Results:20 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11