International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2008-12-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2008-12-01)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-15

Results:20 total items.
Contributions �[�AI/Question:�Q2/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 336 ]
G.984.4 Implementer's Guide � Huawei Technologies Co.,Ltd. Q2/15 2008-11-26
[ 298 ]
Clarifications on Key Management in GPON System � ZTE Corporation Q2/15 2008-11-23
[ 254 ]
Solution of fast GPON switching in long-reach PON scenario � Huawei technologies Q2/15 2008-11-21
[ 253 ]
Proposal to support phase synchronization in GPON system � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 252 ]
Proposal to support ONT survival time attribute in G.984.4 � Huawei technologies Co., LTD Q2/15 2008-11-21
[ 251 ]
Proposal on Continuous Mode of LR-PON � Huawei Technologies Co., Ltd. RAD Data communicati Q2/15 2008-11-21
[ 225 ]
Proposal of control plane protocol stack in G.984.1 � MII China Q2/15 2008-11-21
[ 173 ]
On the need to distribute accurate phase/Time-of-Day over xPON networks � RAD Data Communications, Huawei Q2/15, Q13/15 2008-11-21
[ 134 ]
Solution of fast GPON switching in long-reach PON scenario � Huawei technologies Q2/15 2008-11-20
[ 133 ]
Proposal to support phase synchronization in GPON system � Huawei technologies Co., LTD Q2/15 2008-11-20
[ 132 ]
Proposal to support ONT survival time attribute in G.984.4 � Huawei technologies Co., LTD Q2/15 2008-11-20
[ 131 ]
Proposal on Continuous Mode of LR-PON � Huawei Technologies Co., Ltd. RAD Data communication Ltd. Q2/15 2008-11-20
[ 129 ]
Proposal for PON splitter specifications in G.671 revision � NTT Q7/15, Q2/15 2008-11-20
[ 77 ]
Proposal for clarifying downstream priority queues � ADTRAN Q2/15 2008-11-19
[ 68 ]
Specifications proposal to G.gbe � NEC, Fujitsu, NTT Q2/15 2008-11-19
[ 67 ]
Liaison statement proposal on G.gbe � NEC, Fujitsu Q2/15 2008-11-19
[ 66 ]
Comments on the Software image download in G.984.4 Revised 2008-Am2 � Hitachi Q2/15 2008-11-19
[ 47 ]
PON splitter values � Corning Incorporated Q7/15, Q2/15 2008-11-18
[ 46 ]
PON splitter values - Change to wavelength range � Corning Incorporated Q7/15, Q2/15 2008-11-18
[ 19 ]
Editorial Comments for Draft 1.0 for G.gbe � Nortel Networks (Canada) Q2/15 2008-11-17
Results:20 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25