International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 13 : Meeting�2009-09-02�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 13� C�(2009-09-02)�

ITU-T�SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting� from 2009-09-02 to 2009-09-12

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-042012-02-172012-02-062011-10-102011-05-202011-01-172010-09-162010-04-192010-01-292009-05-222009-01-12

Results:28 total items.
Contributions �[�AI/Question:�Q4/13�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 426 ]
Proposed editorial changes to Y.IPTV-TM � Huawei Technologies CO., Ltd. Q4/13 2009-08-27
[ 425 ]
Proposal for security considerations to Y.IPTV-TM � Huawei Technologies CO., Ltd. Q4/13 2009-08-27
[ 421 ]
Proposal for QoS Routing to section 6 of Y.IPTV-TM � Huawei Technologies CO., Ltd. Q4/13 2009-08-27
[ 419 ]
(Rev.1)
Proposal for Interaction between different functions in section 7 of Y.IPTV-TM � Huawei Technologies CO., Ltd. Q4/13 2009-08-27
[ 400 ]
Proposal of an Annex of Y.2111 Revision2 relevant to the communication between RACF and MPM � KDDI Corporation (KDDI R&D Laboratories) Q4/13 2009-08-26
[ 399 ]
Proposal of an Appendix of Y.2111 Revision2 relevant to the use cases based on the RACF-MPM communications � KDDI Corporation (KDDI R&D Laboratories) Q4/13 2009-08-26
[ 398 ]
Proposal of an Appendix of Y.2111 Revision2 relevant to the comparison of specifications of the reference points between Rc and Rm in RACF � KDDI Corporation (KDDI R&D Laboratories) Q4/13 2009-08-26
[ 397 ]
Proposal of an Appendix of Y.2111 Revision2 relevant to the performance notification between RACF and MPM based on the communications of multiple MPM functions � KDDI Corporation (KDDI R & D Laboratories) Q4/13 2009-08-26
[ 396 ]
Proposal of the revision of the generic resource and admission control functional architecture in Y.2111 Revision2 � KDDI Corporation (KDDI R&D Laboratories) Q4/13 2009-08-26
[ 394 ]
Addition of information components exchanged over Rs, Rt and Rp reference points for multicast scenario in Y.RACF Revision 2 � KDDI Corporation Q4/13 2009-08-26
[ 393 ]
Modification of description about resource control scenarios for multicast in Y.RACF Revision 2 � KDDI Corporation Q4/13 2009-08-26
[ 389 ]
Restructuring inter-operator end-to-end resource control scenarios � KDDI Corporation Q4/13 2009-08-26
[ 388 ]
Restructuring resource control scenarios for wholesale � KDDI Corporation Q4/13 2009-08-26
[ 387 ]
Restructuring resource control scenarios for nomadicity � KDDI Corporation Q4/13 2009-08-26
[ 361 ]
Proposal for the Ri interface in Y.2111 � ZTE Corporation Q4/13 2009-08-26
[ 337 ]
Proposed to modify bandwidth attribute over Rp reference point � ZTE Corporation Q4/13 2009-08-26
[ 331 ]
Proposal for the interaction between RACF and PCC in Y.2111 � ZTE Corporation , China Telecom Q4/13 2009-08-26
[ 324 ]
Proposal for the SCF-requested QoS initial authorization procedure for nomadicity scenario � ZTE Corporation Q4/13 2009-08-25
[ 323 ]
Proposal for resource control scenarios for wholesale in Y.2111 � ZTE Corporation Q4/13 2009-08-25
[ 319 ]
Proposal for a RACF based charging scenario in Y.2111 � ZTE Corporation, China Telecom Q4/13 2009-08-25
[ 312 ]
Editorial modification for appendix V in Y.2111 � ZTE Corporation Q4/13 2009-08-25
[ 311 ]
Correction for the Ri interface in Y.2111 � ZTE Corporation Q4/13 2009-08-25
[ 310 ]
Clarification for section 9.1.2.1.1 in Y.2111 � ZTE Corporation Q4/13 2009-08-25
[ 275 ]
Proposal for RACF and non-RACF cooperation � China Telecom Q4/13 2009-08-24
[ 261 ]
CPE attachment and detachment scenarios for subscription-based QoS � ETRI Q4/13 2009-08-24
[ 237 ]
Proposed modifications for enhancement of draft Recommendation Y.IPTV-TM � Softbank BB Corp., NTT Corp., KDDI Corp. Q4/13 2009-08-24
[ 236 ]
Proposed modifications including restructuring and new item addition of RACF inter-operator communications scenarios � Softbank BB Corp. Q4/13 2009-08-24
[ 205 ]
Comments on draft recommendation Y.IPTV-TM � ETRI Q4/13 2009-08-21
Results:28 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26