International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 12 : Meeting�2009-03-10�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 12� TD-WP3�(2009-03-10)�

ITU-T�SG 12

Performance and quality of service

Study Period 2009

Meeting� from 2009-03-10 to 2009-03-19

held in Switzerland [Geneva]

Other Meetings : 2012-09-072012-05-292011-10-312011-01-182010-09-172010-05-182009-11-03� [ 2009-03-10 ]�

Results:11 total items.
Temporary Documents �(WP3) �[�AI/Question:�Q11/12�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 32-WP3 ]
Proposed new work item on a New Recommendation ?Perceptual guidelines for voiceband switching in heterogeneous mobile networks? � Rapporteur Q11/12 Q11/12 2009-03-16
[ 31-WP3 ]
Incoming LS: Performance design objectives for the IMS architecture � ETSI TC INT Q11/12 2009-03-13
[ 29-WP3 ]
Related work on Interconnection Quality Parameters � Co-Rapporteur Q11/12 Q11/12 2009-03-11
[ 25-WP3 ]
(Rev.1-2)
Status report of Q.11/12 "Performance interworking and traffic management for Next Generation Networks" � Acting Rapporteur Q11/12 Q11/12 2009-03-09
[ 16-WP3 ]
Incoming LS: Draft Recommendation Y.FAinX, "Requirements for Flow Aggregate Information Exchange in NGN" � ITU-T SG13 Q17/12, Q11/12 2009-02-13
[ 14-WP3 ]
Incoming LS: LS to IPTV related Study Groups on NGN capability set 2 � ITU-T SG13 Q13/12, Q11/12 2009-02-13
[ 13-WP3 ]
Incoming LS: Establishment of Focus Group on Future Networks (FG-FN) � Chairman of SG13 Q17/12, Q13/12, Q11/12 2009-02-13
[ 10-WP3 ]
Incoming LS: Performance design objectives for the PSTN/ISDN emulation architecture � ITU-T Study Group 11 Q13/12, Q11/12 2009-02-03
[ 5-WP3 ]
Incoming LS: Liaison statement on "Performance and availability requirements and objectives for wireless access systems" � ITU-R WP5A Q11/12, Q17/12 2008-12-16
[ 3-WP3 ]
Incoming LS: Draft Recommendation E.841 (formerly E.IPQoS) � ITU-T SG2 Q17/12, Q12/12, Q11/12 2008-12-16
[ 1-WP3 ]
Draft agenda for Working Party 3/12 meeting � Chairman of Working Party 3/12 Q17/12, Q13/12, Q12/12, Q11/12, Q2/12 2008-12-16
Results:11 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-11