International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2012-06-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� C�(2012-06-11)�

ITU-T�SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting� from 2012-06-11 to 2012-06-15

held in Switzerland [Geneva]

Other Meetings : 2012-02-172011-10-17� 2011-05-20� 2011-05-132011-01-242010-09-102010-04-262010-01-282009-09-022009-05-212009-01-19

Results:3 total items.
Contributions �[�AI/Question:�Q7/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 297 ]
Proposal for the new draft Recommendation (Q.nacp.Nc ) of signaling requirements and protocol at the Nc interface � Electronics and Telecommunications Research Institute (ETRI) Q7/11 2012-05-29
[ 296 ]
Proposal for new draft Recommendation (Q.nacp.Ne ) of signaling requirements and protocol at the Ne interface � Electronics and Telecommunications Research Institute (ETRI) Q7/11 2012-05-29
[ 294 ]
Proposed enhancement of Q.3230(formerly Q.nacp.M13) for consent � Korea (Rep. of) Q7/11 2012-05-29
Results:3 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25