International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2011-01-24�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� C�(2011-01-24)�

ITU-T�SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting� from 2011-01-24 to 2011-01-28

held in Switzerland [Geneva]

Other Meetings : 2012-06-112012-02-172011-10-17� 2011-05-20� 2011-05-132010-09-102010-04-262010-01-282009-09-022009-05-212009-01-19

Results:4 total items.
Contributions �[�Source:�AT�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 210 ]
Q.Flowstatesig - Need for Technical Report for FSA Signalling Requirement � Juniper, AT&T, Cisco , Qwest, Verizon, Nokia Siemens, Ericsson Q5/11 2011-01-10
[ 192 ]
Proposed New Text for Section 9.4 of TRQ.ETS-Overview � AT&T and Telecordia Q13/11 2011-01-06
[ 187 ]
Proposed Call Server based signalling flow for IP Centrex service � CATR MIIT, China Q3/11, Q2/11 2011-01-06
[ 186 ]
Proposed protocol profile requirements for Q.IPCentrex � CATR MIIT, China Q3/11, Q2/11 2011-01-06
Results:4 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10