International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2009-09-02�: Temporary Documents� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� TD-GEN�(2009-09-02)�

ITU-T�SG 11

Signalling requirements and protocols

Study Period 2009

Meeting� from 2009-09-02 to 2009-09-10

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-112012-02-172011-10-17� 2011-05-20� 2011-05-132011-01-242010-09-102010-04-262010-01-28� [ 2009-09-02 ]� 2009-05-212009-01-19

Results:19 total items.
Temporary Documents �(GEN) �[�AI/Question:�1/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 313-GEN ]
LS - Reply LS for proposal for the continuation of the Joint Coordination Activity on Conformance and Interoperability Testing (JCA -CIT) � SG11 Q11/11 2009-09-12
[ 305-GEN ]
Reply LS for Performance design objectives for the PSTN/ISDN emulation architecture � SG11 Q11/11 2009-09-09
[ 304-GEN ]
LS - Reply LS for Objectives for Quality related Parameters at VoIP Interconnection Points � SG11 Q11/11 2009-09-09
[ 303-GEN ]
LS - Service standardization process � SG11 Q11/11 2009-09-09
[ 295-GEN ]
Q.11/11 Report � Rapporteur, Q11/11 Q11/11 2009-09-09
[ 276-GEN ]
(Rev.1)
LS - SG11 participant in Joint Coordination Activity on ICTs and Climate Change � Chairman, WP1/11 Q1/11 2009-09-04
[ 275-GEN ]
LS - Reply to LS from Q.1/13 on IPTV related activities in SG 11 � Chairman, WP1/11 Q1/11 2009-09-04
[ 274-GEN ]
(Rev.1)
Single contact points for NGN-related works in Study Group 11 � Chairman, WP1/11 Q1/11 2009-09-04
[ 273-GEN ]
(Rev.1)
Q.IPTVSA - output of the NGN GSI and IPTV GSI (Q.1/11 September meeting) � Acting Editor (Rapp. Q1/11) Q1/11 2009-09-04
[ 268-GEN ]
Draft meeting agenda for Q.1/11 � Rapporteur, Q1/11 Q1/11 2009-09-03
[ 255-GEN ]
Draft meeting agenda for Q.1/11 � Rapporteur, Q1/11 Q1/11 2009-09-03
[ 250-GEN ]
WP1/11 Agenda � Chairman, WP1/11 Q14/11, Q13/11, Q2/11, Q1/11 2009-09-03
[ 243-GEN ]
(Rev.1)
Agenda for WP 4/11 "Test specifications" � Vice-Chairman, WP/11 Q12/11, Q11/11, Q10/11, Q9/11, Q8/11 2009-08-27
[ 242-GEN ]
(Rev.1)
Agenda for Q.11/11 � Rapporteur, Q11/11 Q11/11 2009-08-27
[ 238-GEN ]
Report of joint ITU SG11/TISPAN WG6/INT Rapporteur meeting (Moscow, 06 10 April 2009) � Chairman, WP4/11 Q11/11, Q8/11 2009-08-19
[ 176-GEN ]
LS - Performance design objectives for the PSTN/ISDN emulation architecture � ITU-T SG12 Q11/11 2009-03-30
[ 175-GEN ]
LS - Objectives for Quality related Parameters at VoIP Interconnection Points � ITU-T SG12 Q11/11 2009-03-30
[ 167-GEN ]
(Rev.1)
LS - Proposal for the continuation of the Joint Coordination Activity on Conformance and Interoperability Testing (JCA -CIT) � ITU-T SG17 Q12/11, Q11/11, Q10/11, Q9/11, Q8/11 2009-03-03
[ 165-GEN ]
LS - High-quality, testable Recommendations and test specifications � ITU-T SG17 Q12/11, Q11/11, Q10/11, Q9/11, Q8/11 2009-03-03
Results:19 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4