International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 11 : Meeting�2009-09-02�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 11� C�(2009-09-02)�

ITU-T�SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting� from 2009-09-02 to 2009-09-10

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-112012-02-172011-10-17� 2011-05-20� 2011-05-132011-01-242010-09-102010-04-262010-01-282009-05-212009-01-19

Results:5 total items.
Contributions �[�AI/Question:�Q15/11�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 124 ]
Proposal of new clause data delivery mechanism to X.mmc-3 � ETRI Q15/11 2009-08-24
[ 123 ]
Proposal of procedure flow for normal MMC-3 operation to be included in appendix of X.mmc-3 � ETRI Q15/11 2009-08-24
[ 100 ]
Proposed Modification of X.mmc-3, "Information Technology - Mobile Multicast Communications: Protocol over Overlay Multicast Networks" � Korea, (Rep. of) Q15/11 2009-08-21
[ 99 ]
Proposed modification of X.rmcp-3, Information technology - Relayed multicast protocol: Specification for N-plex group applications � Korea (Rep. of) Q15/11 2009-08-21
[ 98 ]
X.603.1/Draft Amd.1 : Proposed Final draft Recommendation for Secure RMCP-2 � Korea (Rep. of) Q15/11 2009-08-21
Results:5 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10