International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Results:83 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�Source:�Huawei�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 850 ]
G.pacmod-bis: Treatment of Quality Level Unknown in SSM function � China Academy of Telecom. Research of MII Huawei T Q13/15 2008-02-01
[ 849 ]
G.pacmod-bis: limitation of clock number in Synchronization network reference chain � China Academy of Telecom. Research of MII Huawei T Q13/15 2008-02-01
[ 846 ]
Proposed inter-domain restoration extensions for G.7713.2 � China Telecom , ZTE , Huawei Q14/15 2008-02-01
[ 845 ]
Additional hard rerouting scenarios in multiple domains for G.7713 � China Telecom , Huawei , ZTE , Alcatel-Lucent Q14/15 2008-02-01
[ 837 ]
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39 �
Withdrawn - see C829
Huawei Q6/15 2008-02-01
[ 836 ]
Proposal of a next step for 40G format comparison �
Withdrawn - see C825
Huawei Q6/15 2008-02-01
[ 835 ]
Bandwidth studies by simulation for 40G modulation formats �
Withdrawn - see C817
Huawei Q6/15 2008-02-01
[ 834 ]
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39 �
Withdrawn - see C814
Huawei Q6/15 2008-02-01
[ 833 ]
A Fundamental Limitation of Retransmission above FEC � Huawei Q4/15 2008-02-01
[ 832 ]
G.gen, ADSL, G.vdsl: Line Driver Power Consumption and Transmit Power � Huawei Q4/15 2008-02-01
[ 831 ]
Further enhancement to Low Power Mode � Huawei Q4/15 2008-02-01
[ 830 ]
G.pacmod-bis: Test results of the new timing distribution mechanism � Huawei Q14/15, Q13/15, Q12/15 2008-02-01
[ 829 ]
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39 � Huawei Q6/15 2008-01-31
[ 828 ]
Requirements for Network Automatic Configuration � Huawei Q14/15, Q12/15 2008-01-31
[ 827 ]
Proposal to Accomplish OTN Protection Recommendation � Huawei Q9/15 2008-01-31
[ 826 ]
Corrections to FD/FDFr Usage in G.8010 � Huawei Q12/15 2008-01-31
[ 825 ]
Proposal of a next step for 40G format comparison � Huawei Q6/15 2008-01-31
[ 824 ]
Independently Transport of Four 512/513b Transcoded 10GbEs in standard ODU3 � Huawei Q11/15 2008-01-31
[ 823 ]
PBB Model for G.8010 � Huawei Q12/15 2008-01-31
[ 822 ]
G.800 Term for Interconnect Transport Entities � Huawei Q12/15 2008-01-31
[ 821 ]
G.800 description modification � Huawei Q12/15 2008-01-31
[ 820 ]
Composite Transport Model and Transport Resilience Description � Huawei 12/15 2008-01-31
[ 819 ]
Consideration about NG OTN hierarchy � Huawei Q11/15 2008-01-31
[ 818 ]
Consideration about 40GE/100GE transport � Huawei Q11/15 2008-01-31
[ 817 ]
Bandwidth studies by simulation for 40G modulation formats � Huawei Q6/15 2008-01-31
[ 816 ]
Behaviour of Cn transport for GMP � Huawei Q11/15 2008-01-31
[ 815 ]
Annex of G.8010v2 to describe the PVT network application � Huawei , Nokia Siemens Networks Q12/15 2008-01-31
[ 814 ]
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39 � Huawei Q6/15 2008-01-31
[ 813 ]
2048/2049B transcoded 10GbE in ODU2 � Huawei 11/15 2008-01-31
[ 812 ]
T-MPLS Ring Protection Mechanisms � Huawei , China Mobile Q9/15 2008-01-31
[ 811 ]
Proposal on OAM architecture and attribute for EVPLAN services � Huawei , China Mobile Q11/15 2008-01-31
[ 810 ]
Proposal on the model and architecture of EVPLAN � Huawei , China Mobile Q11/15 2008-01-31
[ 809 ]
Considerations on deployment of T-MPLS Protection Ring � Huawei , China Mobile Q9/15 2008-01-31
[ 808 ]
Comments on protocol description and state machine of G.8032 � Huawei , CATR, MII Q9/15 2008-01-31
[ 807 ]
Comments on the mechanism of G.8032 � Huawei , CATR, MII Q9/15 2008-01-31
[ 767 ]
Correction to figure 10-6/G.806 � Huawei Q9/15 2008-01-31
[ 535 ]
Proposal on state transition tables for T-MPLS linear protection switching � ETRI, , Huawei Technologies Q9/15 2007-05-25
[ 471 ]
VS Technical Clarification � Huawei Technologies Co., Ltd , China Telecom Co., Ltd Q12/15 2007-05-24
[ 470 ]
Trigger events for auditing process � Huawei Technologies Co., Ltd Q14/15 2007-05-24
[ 469 ]
1+1/1:1 protection switching mechanism for RMPS � Huawei Technologies Co., Ltd Q9/15 2007-05-24
[ 468 ]
Requirement of partial protection switching for RMPS � Huawei Technologies Co., Ltd Q9/15 2007-05-24
[ 467 ]
Proposal for an over-clocked OTN structure (supplement) recommendation � Huawei Technologies Co., Ltd Q11/15 2007-05-24
[ 466 ]
Proposals for multi-lane 100GE transport � Huawei Q11/15 2007-05-24
[ 465 ]
Proposal on OAM model and Ring APS for Ethernet ring protection � Huawei Q9/15 2007-05-24
[ 464 ]
Proposal on OAM Model for T-MPLS SPRing � Huawei Technologies Co., Ltd Q9/15 2007-05-24
[ 463 ]
Proposal for Application Code and Parameter Values in G.dapp2 � MII , China Telecom, China United Telecom , China Mobile , ZTE Corporation , P.R. China Huawei Technologies Co., Ltd Q6/15 2007-05-24
[ 462 ]
Proposal for FC over T-MPLS � Huawei Technologies Co., Ltd Q9/15 2007-05-24
[ 461 ]
Considerations in Sync Ethernet over OTN � Huawei Technologies Co., Ltd Q13/15, Q11/15, Q9/15 2007-05-24
[ 460 ]
Consideration about the time requirement � Huawei Technologies Co., Ltd Q13/15 2007-05-24
[ 459 ]
Connections between ring nodes on T-MPLS ring � Huawei Technologies Co., Ltd Q9/15 2007-05-24
Results:83 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25