International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Results:23 total items.
Contributions �[�AI/Question:�Q5/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 862 ]
Proposal of a new SOP Scrambling Analysis (SSA) PMD test method for future revision of Rec. G.650.2 � Canada Q5/15 2008-02-01
[ 852 ]
Classification of PMD test methods for future revision of Rec. G.650.2 � Canada Q5/15 2008-02-01
[ 778 ]
Proposal regarding Q5/15 study items for the 2009-2012 study period � NTT Q5/15 2008-01-31
[ 777 ]
Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 776 ]
Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 671 ]
Proposal to withdraw Rec. G.651 � Draka Comteq Q10/15, Q5/15 2008-01-29
[ 628 ]
G.650.3 Revision Proposal - Abstract � UK Q5/15 2008-01-21
[ 627 ]
Revision of G.650.3 - Proposed new text � UK Q5/15 2008-01-21
[ 510 ]
Correspondence activity on the alignment of nomenclature in G.666 and G.650.2 � Deutsche Telekom Q5/15, Q7/15 2007-05-25
[ 378 ]
Proposal on a new Supplement regarding with the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2007-05-23
[ 258 ]
Discussion on macrobending loss specification for G.mmx � Draka Comteq Q5/15, Q10/15 2006-10-20
[ 230 ]
Comments on and proposals for G.650.2 � Deutsche Telekom Q5/15 2006-10-20
[ 222 ]
SBS measurement: Proposal for text in G.650.2, Appendix II.5 � Corning Incorporated Q5/15 2006-10-20
[ 184 ]
Proposal concerning response time necessary for adaptive PMD compensation based on polarization fluctuation speed � NTT Q7/15, Q5/15, Q6/15 2006-10-19
[ 156 ]
Comments on Draft Rec. G.650.3 � NTT Q5/15 2006-10-19
[ 155 ]
Proposal on definition of SBS threshold � NTT , CLPAJ Q5/15 2006-10-19
[ 131 ]
Data on the macrobending loss ratio at 1550 nm vs 1625 nm of G.smx class A single mode fibres at 15 mm radius � Draka Comteq Q5/15, Q10/5 2006-10-19
[ 130 ]
Proposal on new document regarding the general characteristics of an optical fibre operation � NTT Q5/15 2006-10-19
[ 124 ]
Comments on draft G.smx � NTT , CLPAJ Q5/15, Q10/15 2006-10-19
[ 121 ]
Way forward to improve the SBS measurement guidance given by G.650.2 � OFS-Fitel Q5/15 2006-10-19
[ 29 ]
Small bending radius optimized G.652 compatible single mode fibres � Draka Comteq Q5/15, Q10/15 2005-12-09
[ 28 ]
Use of Rec. G.652 SMF outside its specification � Draka Comteq Q7/15, Q5/15 2005-12-09
[ 18 ]
Proposed Modification to Recommendation G.650.2 Appendix II.5: Further refinement of the SBS Critical Power based on Rayleigh Backscattering Level � OFS Q5/15 2005-03-15
Results:23 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25