Contributions
�[�AI/Question:�Q12/15�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 913 ]
�
� |
Some concerns about and proposals for the future direction of ASON
�
� |
NTT
� |
Q14/15, Q12/15
� |
2008-02-06 |
|
[ 908 ]
�
� |
Layer model of Ethernet
�
� |
Deutsche Telekom
� |
Q12/15
� |
2008-02-03 |
|
[ 856 ]
�
� |
Change Proposal for G.7712 re the T-MPLS Management Communication Channel
�
� |
Alcatel-Lucent
� |
Q12/15, Q14/15
� |
2008-02-01 |
|
[ 843 ]
�
� |
Requirement of MS-PW over T-MPLS
�
� |
CMCC
,
Alcatel Shangai Bell
,
CU
,
CATR MII China
� |
Q12/15, Q11/15, Q9/15
� |
2008-02-01 |
|
[ 830 ]
�
� |
G.pacmod-bis: Test results of the new timing distribution mechanism
�
� |
Huawei
� |
Q14/15, Q13/15, Q12/15
� |
2008-02-01 |
|
[ 828 ]
�
� |
Requirements for Network Automatic Configuration
�
� |
Huawei
� |
Q14/15, Q12/15
� |
2008-01-31 |
|
[ 826 ]
�
� |
Corrections to FD/FDFr Usage in G.8010
�
� |
Huawei
� |
Q12/15
� |
2008-01-31 |
|
[ 823 ]
�
� |
PBB Model for G.8010
�
� |
Huawei
� |
Q12/15
� |
2008-01-31 |
|
[ 822 ]
�
� |
G.800 Term for Interconnect Transport Entities
�
� |
Huawei
� |
Q12/15
� |
2008-01-31 |
|
[ 821 ]
�
� |
G.800 description modification
�
� |
Huawei
� |
Q12/15
� |
2008-01-31 |
|
[ 815 ]
�
� |
Annex of G.8010v2 to describe the PVT network application
�
� |
Huawei
,
Nokia Siemens Networks
� |
Q12/15
� |
2008-01-31 |
|
[ 797 ]
�
� |
Consideration on IP/MPLS and T-MPLS interworking
�
� |
Fujitsu
� |
Q12/15
� |
2008-01-31 |
|
[ 788 ]
�
� |
Complexity, Scalability, Independency, and Transparency
�
� |
BT
� |
Q12/15
� |
2008-01-31 |
|
[ 782 ]
�
� |
Proposed study items for packet based transport technologies for the next study period (2009-2012)
�
� |
NTT
� |
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
� |
2008-01-31 |
|
[ 738 ]
�
� |
Combination of protection and restoration in G.8080
�
� |
ZTE
� |
Q12/15
� |
2008-01-30 |
|
[ 734 ]
�
� |
Clarification for FP partitioning in G.8010
�
� |
ZTE
� |
Q12/15
� |
2008-01-30 |
|
[ 730 ]
�
� |
Proposal for adding definition of control component topology in ASON
�
� |
ZTE
� |
Q12/15
� |
2008-01-30 |
|
[ 713 ]
�
� |
VLAN model in G.8010
�
� |
BT, Nortel Networks (Europe)
� |
Q12/15
� |
2008-01-30 |
|
[ 712 ]
�
� |
PBB model for G.8010
�
� |
BT, Nortel Networks (Europe)
� |
Q12/15
� |
2008-01-30 |
|
[ 711 ]
�
� |
Approach to modelling in G.pbb-te
�
� |
BT, Nortel Networks (Europe)
� |
Q12/15
� |
2008-01-30 |
|
[ 677 ]
�
� |
Proposed liaison response for PCE
�
� |
Nortel Networks (Canada)
� |
Q14/15, Q12/15
� |
2008-01-29 |
|
[ 654 ]
�
� |
DCN Architecture and Gateways
�
� |
Ciena Corp
� |
Q14/15, Q12/15
� |
2008-01-29 |
|
[ 653 ]
�
� |
Problems with G.8010
�
� |
Ciena Corp
� |
Q14/15, Q12/15, Q9/15
� |
2008-01-29 |
|
[ 651 ]
�
� |
The future of G.7716
�
� |
Ciena Corp, Nortel Networks (USA)
� |
Q12/15
� |
2008-01-29 |
|
[ 619 ]
�
� |
Deployment of MAC addresses in transport network equipment and relation with Access Point ID and MEG and MEP/MIP ID
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 617 ]
�
� |
Architecture of multipoint connections in a transport network with channel and path layers
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 616 ]
�
� |
Encapsulation of Ethernet signals in T-MPLS multipoint service cases
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 615 ]
�
� |
E-LAN and E-TREE service related CI and AI in T-MPLS networks
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 614 ]
�
� |
Structured and unstructured labels and label allocation policy
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 613 ]
�
� |
Subnetwork, Matrix and Link
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 612 ]
�
� |
Pre-condition for client/server independence
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 611 ]
�
� |
E-LAN and E-TREE service support in T-MPLS networks
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 610 ]
�
� |
Designing a scalable T-MPLS network architecture
�
� |
Alcatel-Lucent
� |
Q12/15, Q9/15
� |
2007-05-25 |
|
[ 597 ]
�
� |
Proposal for T-MPLS TCS (Traffic Conditioning and Shaping) in G.8110.1
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 596 ]
�
� |
Support of PDH over T-MPLS (PW adaptation)
�
� |
Alcatel-Lucent
� |
Q13/15, Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 595 ]
�
� |
IP/MPLS and T-MPLS Interoperability
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2007-05-25 |
|
[ 594 ]
�
� |
Support of ATM over T-MPLS (PW adaptation)
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 593 ]
�
� |
Proposals for Current Draft of G.ufatn and Future Work
�
� |
BT
� |
Q12/15
� |
2007-05-25 |
|
[ 592 ]
�
� |
MCC and SCC Options for T-MPLS
�
� |
Alcatel-Lucent
� |
Q12/15, Q14/15
� |
2007-05-25 |
|
[ 591 ]
�
� |
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114
�
� |
Alcatel-Lucent
� |
Q12/15, Q14/15
� |
2007-05-25 |
|
[ 561 ]
�
� |
ASON Call Routing
�
� |
Nortel Networks (Canada)
� |
Q14/15, Q12/15
� |
2007-05-25 |
|
[ 551 ]
�
� |
Updates to G.8080 LRM and TAP components to support packet switching
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2007-05-25 |
|
[ 533 ]
�
� |
Items under study in Q12
�
� |
BT
� |
Q12/15
� |
2007-05-25 |
|
[ 514 ]
�
� |
Proposed study items for packet based transport technologies for the next study period (2009-2012)
�
� |
NTT
� |
Q12/15, Q11/15, Q9/15, Q3/15
� |
2007-05-25 |
|
[ 492 ]
�
� |
Consideration on T-MPLS connections and its server layer
�
� |
Fujitsu
� |
Q12/15
� |
2007-05-24 |
|
[ 491 ]
�
� |
Proposed update for G.8112
�
� |
Fujitsu
� |
Q12/15, Q11/15
� |
2007-05-24 |
|
[ 471 ]
�
� |
VS Technical Clarification
�
� |
Huawei Technologies Co., Ltd
,
China Telecom Co., Ltd
� |
Q12/15
� |
2007-05-24 |
|
[ 432 ]
�
� |
Proposals to add directory service component into G.8080
�
� |
ZTE Corporation
� |
Q12/15
� |
2007-05-24 |
|
[ 417 ]
�
� |
Proposals for control plane performance monitoring parameters
�
� |
China Academy of Telecommunications Research (MII)
� |
Q14/15, Q12/15
� |
2007-05-24 |
|
[ 409 ]
�
� |
Proposals of new interface to LRM component in G.8080
�
� |
Ministry of Information Industry of P.R. China
� |
Q12/15
� |
2007-05-24 |
Results:128 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):