International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2008-02-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2008-02-11)�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting� from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-012007-06-042006-10-302006-02-062005-05-162004-11-29

Results:22 total items.
Contributions �[�Source:�NTT�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 913 ]
Some concerns about and proposals for the future direction of ASON � NTT Q14/15, Q12/15 2008-02-06
[ 912 ]
Proposal to start discussion on power consumption and its reduction in optical transmission systems � NTT Q7/15, Q6/15 2008-02-06
[ 875 ]
G.8032 Non-Revertive Operation behaviour � NTT , Nokia Siemens Networks Q9/15 2008-02-01
[ 864 ]
G.8032 State Machine Proposal � NTT , Nokia siemens Networks Q9/15 2008-02-01
[ 860 ]
Usage and reservation of new multicast group addresses for R-APS message � NTT , Nokia Siemens Networks GmbH & Co. KG Q9/15 2008-02-01
[ 859 ]
G.8032 Manual Switch Behaviour � NTT , Nokia Siemens Networks GmbH & Co. KG Q9/15 2008-02-01
[ 787 ]
Proposal of PMD value that should be considered in 40Gb/s modulation formats � NTT Q6/15 2008-01-31
[ 786 ]
40 GbE MTTFPA when using 512B/513B transcoding � NTT Q11/15 2008-01-31
[ 785 ]
OTN enhancement accommodating Ethernet clients with bit transparency as well as block code transparency � NTT Q11/15 2008-01-31
[ 782 ]
Proposed study items for packet based transport technologies for the next study period (2009-2012) � NTT QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15 2008-01-31
[ 781 ]
Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan" � NTT Q3/15 2008-01-31
[ 780 ]
Information on Raman gain distribution measurement technique � NTT Q8/15 2008-01-31
[ 779 ]
Proposal regarding Q8/15 study items for the 2009-2012 study period � NTT Q8/15 2008-01-31
[ 778 ]
Proposal regarding Q5/15 study items for the 2009-2012 study period � NTT Q5/15 2008-01-31
[ 777 ]
Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 776 ]
Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions � NTT Q5/15 2008-01-31
[ 708 ]
The scope of G.hnta and G.hn � NTT, Mitsubishi Q4/15, Q2/15, Q1/15 2008-01-30
[ 707 ]
Proposal of discussion on G.hntreq for technical requirements � Mitsubishi, NTT Q4/15, Q2/15, Q1/15 2008-01-30
[ 706 ]
Proposal of distribution of information for home network QoS and applications � Mitsubishi, NTT Q4/15, Q2/15, Q1/15 2008-01-30
[ 705 ]
Proposed update of Clause 8 "High level requirements" of G.hnta � NTT, Mitsubishi. Q4/15, Q2/15, Q1/15 2008-01-30
[ 704 ]
Proposed update of Clauses 1, 6 and 7 of G.hnta � NTT, Mitsubishi Q4/15, Q2/15, Q1/15 2008-01-30
[ 682 ]
Proposal for a silent start mode for ONUs � NTT & France Telecom Q2/15 2008-01-30
Results:22 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10