International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2008-02-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2008-02-11)�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting� from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-012007-06-042006-10-302006-02-062005-05-162004-11-29

Results:53 total items.
Result page:� 1 - 2 �-�Next Next
Contributions �[�AI/Question:�Q9/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 911 ]
Non-revertive recovery mechanism in G.8032 � ETRI Q9/15 2008-02-06
[ 875 ]
G.8032 Non-Revertive Operation behaviour � NTT , Nokia Siemens Networks Q9/15 2008-02-01
[ 870 ]
Inclusion of FDB flush operations in G.8032 � Nokia Siemens Networks Q9/15 2008-02-01
[ 869 ]
G.8032 - 50 ms protection time qualification � Nokia Siemens Networks Q9/15 2008-02-01
[ 868 ]
Clarification of guard timer functionality in G.8032 � Nokia Siemens Networks Q9/15 2008-02-01
[ 867 ]
G.8032 - Proposal for R-APS insertion and copy and extract function and processes � Nokia Siemens Networks Q9/15 2008-02-01
[ 866 ]
G.8032 - Proposal for R-APS insertion and copy and extract function and processes �
Withdrawn - see C867
Nokia siemens Networks Q9/15 2008-02-01
[ 864 ]
G.8032 State Machine Proposal � NTT , Nokia siemens Networks Q9/15 2008-02-01
[ 863 ]
G.8032 - Proposal for R-APS PDU Format � Nokia Siemens Networks Q9/15 2008-02-01
[ 861 ]
Client services Sub ODU1 mapping into OTN using HO-VC � Alcatel-Lucent Q11/15, Q9/15 2008-02-01
[ 860 ]
Usage and reservation of new multicast group addresses for R-APS message � NTT , Nokia Siemens Networks GmbH & Co. KG Q9/15 2008-02-01
[ 859 ]
G.8032 Manual Switch Behaviour � NTT , Nokia Siemens Networks GmbH & Co. KG Q9/15 2008-02-01
[ 858 ]
On Frame Delay Variations for Ethernet Services � Nortel Networks (Europe) Q9/15 2008-02-01
[ 857 ]
Proposed clarification for APS channel definition on G.8032 � NEC Corporation Q9/15 2008-02-01
[ 848 ]
TTL operation in the TM-SPRing � China Telecom , Beijing University of P&T Q11/15, Q9/15 2008-02-01
[ 847 ]
Specific Function Type for T-MPLS ring protection APS � China Telecom , Beijing University of P&T Q9/15 2008-02-01
[ 843 ]
Requirement of MS-PW over T-MPLS � CMCC , Alcatel Shangai Bell , CU , CATR MII China Q12/15, Q11/15, Q9/15 2008-02-01
[ 839 ]
Proposal for R-APS Specific Information of R-APS Format in G.8032 � ETRI Q9/15 2008-02-01
[ 838 ]
Proposal for WTR message of R-APS Specific Information in G.8032 � ETRI Q9/15 2008-02-01
[ 827 ]
Proposal to Accomplish OTN Protection Recommendation � Huawei Q9/15 2008-01-31
[ 812 ]
T-MPLS Ring Protection Mechanisms � Huawei , China Mobile Q9/15 2008-01-31
[ 809 ]
Considerations on deployment of T-MPLS Protection Ring � Huawei , China Mobile Q9/15 2008-01-31
[ 808 ]
Comments on protocol description and state machine of G.8032 � Huawei , CATR, MII Q9/15 2008-01-31
[ 807 ]
Comments on the mechanism of G.8032 � Huawei , CATR, MII Q9/15 2008-01-31
[ 805 ]
Comments on G.8032 - Ethernet rings protection switching � ETRI Q9/15 2008-01-31
[ 794 ]
Proposal for R-APS frame format in G.8032 � Fujitsu Q9/15 2008-01-31
[ 793 ]
Comments and proposed modification for draft G.8132 � Fujitsu Q9/15 2008-01-31
[ 792 ]
Comments and proposed modification for the clause 6 and 8 in G.8032 � Fujitsu , NEC , Mitsubishi , Hitachi Q9/15 2008-01-31
[ 789 ]
State transitions tables for TM-SPRing � Alcatel-Lucent Q9/15 2008-01-31
[ 782 ]
Proposed study items for packet based transport technologies for the next study period (2009-2012) � NTT QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15 2008-01-31
[ 767 ]
Correction to figure 10-6/G.806 � Huawei Q9/15 2008-01-31
[ 746 ]
A proposed correction to the state transition of revertive operation in G.8031 � Republic of Korea Q9/15 2008-01-31
[ 728 ]
A scenario of link defect (G.8032) � ZTE Q9/15 2008-01-30
[ 727 ]
How to trigger FDB Flush (G.8032) � ZTE Q9/15 2008-01-30
[ 726 ]
Proposal for rules of flushing operation (G.8032) � ZTE Q9/15 2008-01-30
[ 725 ]
Proposal on increasing delivery node ID field in APS PDU (G.8032) � ZTE Q9/15 2008-01-30
[ 724 ]
Blocking principle of R-APS channel (G.8032) � ZTE Q9/15 2008-01-30
[ 715 ]
Proposal on priority based protection switching � Mitsubishi Q9/15 2008-01-30
[ 714 ]
Proposed modifications to clause 12.10 (Guard timer) in G.8032 � Mitsubishi Q9/15 2008-01-30
[ 693 ]
G.8032 priorities for consent � Nortel Networks (Canada) Q9/15 2008-01-29
[ 676 ]
G.8032 R-APS Address Specification � Nortel Networks (Canada) Q9/15 2008-01-29
[ 675 ]
G.8032 State Machine � Nortel Networks (Canada) Q9/15 2008-01-29
[ 674 ]
G.8032 Flush Mechanism � Nortel Networks (Canada) Q9/15 2008-01-29
[ 673 ]
G.8032 Reversion Mechanism � Nortel Networks (Canada) Q9/15 2008-01-29
[ 672 ]
G.8032 Protection Switching Behaviour � Nortel Networks (Canada) Q9/15 2008-01-29
[ 669 ]
Proposal for new atomic functions needed to handle Synchronous Ethernet � Alcatel-Lucent Q13/15, Q9/15 2008-01-29
[ 668 ]
Modifications proposed to G.781 � Alcatel-Lucent Q13/15, Q9/15 2008-01-29
[ 653 ]
Problems with G.8010 � Ciena Corp Q14/15, Q12/15, Q9/15 2008-01-29
[ 632 ]
Proposal for note on regenerator jitter generation of STM256 interfaces for G.783 � Alcatel-Lucent Q13/15, Q9/15, Q6/15 2008-01-25
[ 631 ]
Proposal for finalising of work on STM256 jitter specification � Alcatel-Lucent Q13/15, Q9/15, Q6/15 2008-01-25
Results:53 total items.
Result page:� 1 - 2 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10