International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2008-02-11�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2008-02-11)�

ITU-T�SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting� from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-012007-06-042006-10-302006-02-062005-05-162004-11-29

Results:24 total items.
Contributions �[�AI/Question:�Q12/15�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 913 ]
Some concerns about and proposals for the future direction of ASON � NTT Q14/15, Q12/15 2008-02-06
[ 908 ]
Layer model of Ethernet � Deutsche Telekom Q12/15 2008-02-03
[ 856 ]
Change Proposal for G.7712 re the T-MPLS Management Communication Channel � Alcatel-Lucent Q12/15, Q14/15 2008-02-01
[ 843 ]
Requirement of MS-PW over T-MPLS � CMCC , Alcatel Shangai Bell , CU , CATR MII China Q12/15, Q11/15, Q9/15 2008-02-01
[ 830 ]
G.pacmod-bis: Test results of the new timing distribution mechanism � Huawei Q14/15, Q13/15, Q12/15 2008-02-01
[ 828 ]
Requirements for Network Automatic Configuration � Huawei Q14/15, Q12/15 2008-01-31
[ 826 ]
Corrections to FD/FDFr Usage in G.8010 � Huawei Q12/15 2008-01-31
[ 823 ]
PBB Model for G.8010 � Huawei Q12/15 2008-01-31
[ 822 ]
G.800 Term for Interconnect Transport Entities � Huawei Q12/15 2008-01-31
[ 821 ]
G.800 description modification � Huawei Q12/15 2008-01-31
[ 815 ]
Annex of G.8010v2 to describe the PVT network application � Huawei , Nokia Siemens Networks Q12/15 2008-01-31
[ 797 ]
Consideration on IP/MPLS and T-MPLS interworking � Fujitsu Q12/15 2008-01-31
[ 788 ]
Complexity, Scalability, Independency, and Transparency � BT Q12/15 2008-01-31
[ 782 ]
Proposed study items for packet based transport technologies for the next study period (2009-2012) � NTT QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15 2008-01-31
[ 738 ]
Combination of protection and restoration in G.8080 � ZTE Q12/15 2008-01-30
[ 734 ]
Clarification for FP partitioning in G.8010 � ZTE Q12/15 2008-01-30
[ 730 ]
Proposal for adding definition of control component topology in ASON � ZTE Q12/15 2008-01-30
[ 713 ]
VLAN model in G.8010 � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 712 ]
PBB model for G.8010 � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 711 ]
Approach to modelling in G.pbb-te � BT, Nortel Networks (Europe) Q12/15 2008-01-30
[ 677 ]
Proposed liaison response for PCE � Nortel Networks (Canada) Q14/15, Q12/15 2008-01-29
[ 654 ]
DCN Architecture and Gateways � Ciena Corp Q14/15, Q12/15 2008-01-29
[ 653 ]
Problems with G.8010 � Ciena Corp Q14/15, Q12/15, Q9/15 2008-01-29
[ 651 ]
The future of G.7716 � Ciena Corp, Nortel Networks (USA) Q12/15 2008-01-29
Results:24 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-10